1308 Prospect Place
Brooklyn, NY 11213BBL 3-01366-0014Map
Owner of record: Sun Tower Realty,
1308 Prospect Place is a mixed residential and retail building built in 1920 in Brooklyn, 11213. It has 6 residential units across 3 floors. The owner of record is Sun Tower Realty,. HPD has recorded 458 housing violations here, most recently on October 17, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 458
- DOB violations
- 11
- ECB violations
- 15
- HPD complaints
- 1,232
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 458
- BHazardous
Properly repair or replace the broken or defective bell buzzer intrecom system from the building entrance door to the apartment wall panel at south wall in the private hallway located at apt 3l, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at electrical outlet above range at east wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods ladder fully descended at 1st story balcony building reaa, east exterior wall at fire escape, 1st story
Oct 17, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 1st story balconey building rear, east exterior wall at fire escape, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 14, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
Oct 14, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from north at east
Oct 14, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Oct 14, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Oct 14, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective intercom system from building front to south wall in the foyer located at apt 2l, 2nd story, 1st apartment from north at east
Oct 14, 2026 · Apt 2L
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Oct 7, 2026 · Apt 3L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electric outlet at east wall in the 1st room from east located at apt 3l, 3rd story, 1st apartment from north at east
Oct 7, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the caulking around bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Oct 7, 2026 · Apt 3L
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Oct 7, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east
Oct 7, 2026 · Apt 3L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor tiles at intermediate landing at public hall stairs, 1st story
Oct 7, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 1st shoe tack welded, secure with proper nuts and bolts at 1st fire escape at (east wall) rear building at fire escape
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 1st shoe tack welded, secure with proper nuts and bolts at 1st fire escape from (east) at (south) building front at fire escape
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 2l, 2nd story, 1st apartment from north at east
Feb 24, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 24, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 24, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Refit the door in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
Feb 24, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Nov 15, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 1st story
Nov 15, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Nov 15, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Nov 3, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Nov 3, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building front yard
Nov 3, 2025
Open — Nov sent out - CImmediately hazardous
Fire escape defective. properly secure 8th trend from bottoms up at balcony 2nd from east at south at building rear at fire escape, 2nd story
Nov 3, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door leading to rear yard in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles on floor in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Oct 3, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Oct 3, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at .. in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Oct 3, 2025 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 4th room from east at south located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 2nd room from east at north located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from east at north located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the bathroom , the foyer , the 2nd room from east at south located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at south and west walls south wall in the 4th room from east at south located at apt 1l, 1st story, 1st apartment from north at east
Aug 28, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door frame from west at north wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Jul 15, 2025 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east at north, the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Jul 15, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats yard, 1st story
Jul 15, 2025
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 1l, 1st story, 1st apartment from north at east
Jul 15, 2025 · Apt 1L
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 15
- Class - 1
At the time of inspection observed at exp.#2 ( left side of the building) fire escape landings obstructed by household items and still gate with chain padlocked making it unable to escape property incase of fir
Sep 16, 2026 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at exposure#2 fire escape pathway and landings obstructed by household items and steel gate with chain & keyed locking devic
Feb 22, 2026 · Penalty $2,500
Resolve - Class - 2
As per hmc-27-2033. no sign posted in conspicuous location with available contact information for person with access to boiler/heating equipment. correct all violating conditions and submit a certificate of cor
Feb 4, 2022 · Penalty $3,125
Active - Class - 2
The heating system/boiler room access information sign displayed is void of credible information; correct violation and submit the certificate of correction
Mar 18, 2020 · Penalty $3,125
Active - Class - 2
32a,34b,50. 50-front boiler jacket not in place.
May 17, 2018
Resolve - Class - 2
32a,50,50a,50b,50c. 50-2l hot water heater defective flame cover and front jacket not in place; 50a-hot water heater leaking; 50b-1l hot water heater defective; 50c-2d boiler room light defective.
May 17, 2018
Resolve - Class - 2
32a,50,50a. 50-front boiler jacket not in place; 50a-debris in boiler room. peerless 70,000 btu-incellar boiler room.
May 17, 2018
Resolve - Class - 2
Work without a permit. noted: at time of inspection 1 awning sign and one wall sign. awning sign says (super nice deli) and the wall sign says (income tax & insurance). rem: obtain all required permits.
Feb 28, 2018 · Penalty $800
Active - Class - 1
Work w/o permit work noted: i cellar with no dob permits filed new boilers and water heaters were replaced in boiler room. on 813/2007 an ara was signed off for a weil-mcclain boiler & a.o. smith hot water heat
Jul 22, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to have new or altered plumbing system tested. in cellar new boilers & water heater installed in boiler room were never inspected or tested by dob inspector. remedy: perform test & inspection.
Jul 22, 2013 · Penalty $500
Resolve
Show 5 more ↓
- Class - 2
Failure to maintain bldg in code compliant manner re: installation/maintenance of plumbing material & equipment in apt 2r in back bedroom ceiling light fixture had gas leaking from that location coming from 3/8
Jul 22, 2013 · Penalty $250
Resolve - Class - 2
Working without a permit:work noted:in basement new boiler in progressof being installed without a permit issued.boiler is next to a big bo iler.also dex tubing installed and in progress of being installed thro
Nov 13, 2009 · Penalty $4,000
Resolve - Class - 1
Performing unlicensed plumbing work without a master plumber licensed:work noted:basement & apt 2l work in progress at locations. remedy:comply with code.
Nov 13, 2009 · Penalty $5,000
Resolve - Hazardous
Failure to maintain building: defect is: broken sidewalk vault: missing fire rated ceiling entire area missing support columns noted temporary wood supports columns only noted spongy wood floor by store area in
Mar 1, 2006 · Penalty $800
Resolve - Non-hazardous
49 no key at location for boiler room.
Oct 12, 2000 · Penalty $350
Resolve
Complaints
- Electric
Outlet/switch
Oct 13, 2026 · Apt 3L
Close - Unsanitary condition
Mold
Oct 13, 2026 · Apt 3L
Close - Water leak
Heavy flow
Oct 6, 2026 · Apt 1L
Close - Water leak
Damp spot
Oct 6, 2026 · Apt 1L
Close - Water leak
Slow leak
Oct 6, 2026 · Apt 1L
Close - General
Bell/buzzer/intercom
Oct 6, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Oct 6, 2026 · Apt 1L
Close - Flooring/stairs
Stairs
Oct 2, 2026 · Apt 2L
Close - Flooring/stairs
Floor
Oct 2, 2026 · Apt 2L
Close - General
Bell/buzzer/intercom
Oct 2, 2026 · Apt 2L
Close
Show 40 more ↓
- General
Signage missing
Sep 28, 2026 · Apt 3R
Close - Flooring/stairs
Floor
Sep 28, 2026 · Apt 3R
Close - Water leak
Slow leak
Sep 28, 2026 · Apt 3R
Close - Electric
Outlet/switch
Sep 25, 2026 · Apt 3L
Close - Electric
Outlet/switch
Jul 2, 2026 · Apt 3L
Close - Electric
Outlet/switch
May 20, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Apr 4, 2026 · Apt 3L
Close - Electric
Lighting
Mar 20, 2026 · Apt 3L
Close - Electric
Power outage
Feb 20, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt 2L
Close - Plumbing
Water supply
Feb 20, 2026 · Apt 3L
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt 3L
Open - Plumbing
Basin/sink
Feb 12, 2026 · Apt 3L
Open - Water leak
Slow leak
Feb 12, 2026 · Apt 3L
Open - Plumbing
Water supply
Feb 12, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 12, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 10, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 10, 2026 · Apt 3L
Close - Water leak
Heavy flow
Feb 9, 2026 · Apt 2L
Close - Electric
Outlet/switch
Feb 9, 2026 · Apt 2L
Close - Electric
Outlet/switch
Nov 30, 2025 · Apt 3L
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Nov 12, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Oct 31, 2025 · Apt LOBBY
Close - Heat/hot water
Apartment only
Oct 17, 2025 · Apt 1L
Open - Unsanitary condition
Pests
Oct 1, 2025 · Apt 1L
Close - Water leak
Slow leak
Aug 26, 2025 · Apt 1L
Close - Paint/plaster
Wall
Jul 10, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Jul 10, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Jun 20, 2025 · Apt 1L
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 2, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt 1L
Close - Heat/hot water
Apartment only
Feb 28, 2025 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 3
- Residential units
- 6
- Building area
- 7,650 ft²
- Lot area
- 2,970 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 36
- Block / lot
- 1366 / 14
- Assessed value
- $462,150
- Landmark / historic district
- No
HPD registration #367928, last renewed May 28, 2025.
Questions about 1308 Prospect Place
Who owns 1308 Prospect Place?
The owner of record in NYC Department of City Planning PLUTO data is Sun Tower Realty,.
Does 1308 Prospect Place have violations?
Yes. NYC HPD has recorded 458 housing violations at this property.
Is 1308 Prospect Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1308 Prospect Place built?
City records list 1920 as the year it was built.
How many apartments are in 1308 Prospect Place?
It has 6 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.