roofy

1405 Prospect Place

Brooklyn, NY 11213BBL 3-01361-0081Map

Owner of record: 1405 Prospect Pl INC

1405 Prospect Place is a walk-up apartment building built in 1910 in Brooklyn, 11213. It has 40 residential units across 4 floors. The owner of record is 1405 Prospect Pl INC. HPD has recorded 169 housing violations here, most recently on May 5, 2026. 32 of the 50 most recent violations are still open.

HPD violations
169
DOB violations
17
ECB violations
25
HPD complaints
229

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 169

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty latch set at building entrance door

    Apr 15, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door

    Apr 15, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section at south

    May 27, 2025 · Apt A12

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling west and north wall in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section at south

    May 27, 2025 · Apt A12

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt a12, 3rd story, 1st apartment from south at west , section at south

    May 27, 2025 · Apt A12

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt a12, 3rd story, 1st apartment from south at west , section at south

    May 27, 2025 · Apt A12

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north west and east wal in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchen located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a12, 3rd story, 1st apartment from south at west , section ''south'', 1st from east at south

    May 23, 2025 · Apt A12

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above ceiling in the kitchen located at apt a20, 4th story, 1st apartment from south at west , section at south

    Jun 4, 2024 · Apt A20

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above ceiling in the 2nd room from north at west located at apt a20, 4th story, 1st apartment from south at west , section at south

    Jun 4, 2024 · Apt A20

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 2nd room from north at west located at apt a20, 4th story, 1st apartment from south at west , section at south

    Jun 4, 2024 · Apt A20

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt a20, 4th story, 1st apartment from south at west , section at south

    Jun 4, 2024 · Apt A20

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt a20, 4th story, 1st apartment from south at west , section at south

    Jun 4, 2024 · Apt A20

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 11, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 24, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the private hallway located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the kitchen located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • A

    Replace with new the missing door knob on closet in the private hallway located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in closet in the private hallway located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt a2, 1st story, 2nd apartment from north at east

    Jun 25, 2021 · Apt A2

    Open — Nov certified late
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 12, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 25, 2019

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes cosisting of household items 2nd story balcony at building front west stack at fire escape

    Apr 23, 2019

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 28, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 14, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 13, 2015

    Closed — Violation dismissed
  • C

    Remove the illegal fastening remove the illegal fastening unacceptable electromagnetic locking device installed at entrance to building door , 1st story

    Mar 20, 2014

    Open — Nov sent out
  • B

    Provide an acceptable mecanical heavy duty lock and latch set at entrance to building door , 1st story

    Mar 20, 2014

    Open — Nov sent out
  • B

    Arrange and make self-closing the doors to hoppers all stories public hall south & north sections.

    Mar 20, 2014

    Open — Nov sent out
  • B

    Properly repair the broken or defective paving west court and rear yard

    Mar 20, 2014

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ; the ceiling and all walls in the bathroom located at apt b20, 4th story, 2nd apartment from south at west , section at north

    Sep 17, 2013 · Apt B20

    Open — Invalid certification

DOB building violations · 17

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 9, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 9, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - dismissed
Show 7 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 25

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39114635m., file a certificate of correction

    Apr 27, 2026 · Penalty $6,250

    Active
  • Class - 3

    Federal fst-70 boiler=rear flame sight glass missing+anti syphon valve missing @top of oil tank+discharge pipes missing@safety valves;correct violation+submit certificate of correction

    Oct 3, 2024 · Penalty $500

    Resolve
  • Class - 1

    At time of inspection at cellar level missing sheetrock and exposed wooden joist at multiple locations, foundation wall have crack at one place. at court yard facade wall missing cement and exposed bricks at mu

    May 17, 2024 · Penalty $1,250

    Active
  • Class - 1

    Work w.o a permit observed four workers;renovation of apt a8 w.new piping in the bathroom, kitchen and gas dryer.observed electrical wiring installation in ceilings for recessed lighting electrical panel,outlet

    Nov 28, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35086309x issued on 01/14/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. remedy: comply w/comm's order &/or file a c of c.

    Aug 8, 2016 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in nov#35086309x issued on 01/14/14 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.for work without a permit.rem

    May 6, 2016 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in nov#35086309x issued on 1/14/14 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny102-01.work w/o permit.created class a apt in cellar.rem co

    Mar 15, 2016 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35086309x issued on 1/14/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Jan 25, 2016 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35086309x issued on 1/14/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Dec 1, 2015 · Penalty $6,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35086309x issued on 1/14/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for work w/o a permit;full height partition erected at cellar

    Oct 15, 2015 · Penalty $2,000

    Resolve
Show 15 more ↓
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35086309x issued on 1/14/14 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. work w/o permit. created apt @ cellar. remedy: comply w/comm's

    Aug 10, 2015 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35086309x issued on 1/14/14. for work w/o a permit at cellar level. remedy: comply w/the comm's order.

    Jun 13, 2015 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35086309x issued on 1/14/14. work w/o a permit at cellar level created studio apt. remedy: comply w/the comm's order.

    Apr 14, 2015 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#35086309x issued on 01/14/14.work w/o a permit @ cellar created studio/bedroom w/ padlocking device.rem:comply w/ the comm's order.

    Feb 18, 2015 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35086309x issued on 1/14/14 work w/o a permit at cellar levelcreated illegal studio area. remedy: comply w/the comm's order.

    Dec 17, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in notice of violation #35086309x issued on 01/14/14 for illegal work @ cellar level.rem:comply with the commissioner's order

    Oct 30, 2014 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order containted in notice of violation #35086309x issued on 01/14/14.for work w/o a permit @ cellar level.rem:comply with the commissioner's order

    Sep 11, 2014 · Penalty $12,500

    Resolve
  • Class - 2

    Fail to comply w/the comm's order to file a cert of correction w/the d.o.b for notice of vio#35086308y issued on 01/14/14 pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.

    Jul 18, 2014 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order in notice of violation #35086309x issued on 01/14/14.for contr.work etc done w/o a permit.rem:comply with the commissioner's order

    Jul 18, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in notice of violation # 35086309x issued on 01/14/14. for work w/o a permit @ cellar erected full height partitions to create dwelling unit. remedy: comp

    Mar 25, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by bldg dept records: indicate bldgto be a 39 unit multi dwelling/hpd records registration #309440 indicates bldg to have 39 units. at cellar level converted storage area to

    Jan 14, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Work w/o permit: work noted at cellar level, created full height partition walls, created 1 studio/bedroom area w/door and padlock locking device.remedy:obtain permit or restore premises to priorlegalcondition

    Jan 14, 2014 · Penalty $4,000

    Resolve
  • Class - 2

    B254,42,21a,50a,b,c. 50a- peephole back of boiler missing. 50b- excessive soot in boiler room. 50c- front boiler plate corroded and leaking.

    Apr 3, 2013 · Penalty $250

    Resolve
  • Class - 1

    B154,51,34b,3b,50a,b,c,d,e,f,15. 50a- boiler room fire door defective.50b- flue pipe not sealed to chimney fumes. 50c- flue pipe needs support. 50d- cleanout door defective. 50e- auto feed inoperative. 50f-

    Jun 14, 2011 · Penalty $1,000

    Resolve
  • Non-hazardous

    16.21b.34a.45a.48a.50.50a.50b 50 debris in basement 50a missing anti syphon valve on oil line 50b missing check valve on boiler line

    Jun 11, 2008 · Penalty $2,500

    Resolve

Complaints

  • Water leak

    Damp spot

    Sep 6, 2026 · Apt 161920

    Close
  • Water leak

    Damp spot

    Apr 13, 2026 · Apt B9

    Close
  • Water leak

    Heavy flow

    Jan 26, 2026 · Apt A2

    Close
  • General

    Cabinet

    Jan 26, 2026 · Apt A2

    Close
  • Flooring/stairs

    Floor

    Jan 26, 2026 · Apt A2

    Close
  • Door/window

    Window frame

    Jan 26, 2026 · Apt A2

    Close
  • Water leak

    Heavy flow

    May 22, 2025 · Apt A12

    Close
  • Water leak

    Heavy flow

    May 19, 2025 · Apt A12

    Close
  • Paint/plaster

    Wall

    May 19, 2025 · Apt A12

    Close
  • Electric

    Lighting

    May 19, 2025 · Apt A12

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    May 19, 2025 · Apt A12

    Close
  • Flooring/stairs

    Floor

    May 19, 2025 · Apt A12

    Close
  • Outside building

    Gutter/leader

    Apr 3, 2024 · Apt A20

    Close
  • Water leak

    Slow leak

    Apr 3, 2024 · Apt A20

    Close
  • Outside building

    Roofing

    Apr 3, 2024 · Apt A20

    Close
  • Paint/plaster

    Ceiling

    Apr 3, 2024 · Apt A20

    Close
  • Paint/plaster

    Wall

    Apr 3, 2024 · Apt A20

    Close
  • Electric

    Lighting

    Apr 3, 2024 · Apt A20

    Close
  • Water leak

    Slow leak

    Apr 3, 2024 · Apt A20

    Close
  • Heat/hot water

    Entire building

    Mar 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2024 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Mar 22, 2024 · Apt A6

    Close
  • Heat/hot water

    Apartment only

    Mar 21, 2024 · Apt A6

    Close
  • Water leak

    Heavy flow

    Mar 9, 2024 · Apt A20

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2024 · Apt A6

    Close
  • Water leak

    Heavy flow

    Jan 10, 2024 · Apt A20

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 30, 2023 · Apt A8

    Close
  • Electric

    Power outage

    Aug 22, 2021 · Apt A20

    Close
  • Electric

    Power outage

    Aug 22, 2021 · Apt A7

    Close
  • Water leak

    Heavy flow

    Jun 18, 2021 · Apt A2

    Close
  • Door/window

    Window frame

    Nov 21, 2019 · Apt B11

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2019 · Apt B11

    Close
  • Paint/plaster

    Ceiling

    Nov 21, 2019 · Apt B11

    Close
  • Unsanitary condition

    Mold

    Nov 21, 2019 · Apt B11

    Close
  • Heat/hot water

    Apartment only

    Apr 23, 2019 · Apt A12

    Close
  • Paint/plaster

    Ceiling

    Feb 25, 2019 · Apt B11

    Close
  • Unsanitary condition

    Pests

    Feb 25, 2019 · Apt B11

    Close
  • Unsanitary condition

    Pests

    Feb 25, 2019 · Apt B11

    Close
  • Door/window

    Window frame

    Feb 25, 2019 · Apt B11

    Close
  • Door/window

    Window frame

    Feb 25, 2019 · Apt B11

    Close
  • Unsanitary condition

    Mold

    Feb 25, 2019 · Apt B11

    Close
  • Electric

    Wiring

    Jan 4, 2018 · Apt A12

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2017 · Apt B20

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2016 · Apt B20

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2016 · Apt B20

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2015 · Apt A12

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2015 · Apt B20

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2015 · Apt B20

    Close
  • Heat/hot water

    Apartment only

    Nov 5, 2014 · Apt A12

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2014 · Apt B20

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1910
Floors
4
Residential units
40
Building area
38,520 ft²
Lot area
12,711 ft²
Zoning
R6
Community board
308
Council district
36
Block / lot
1361 / 81
Assessed value
$999,900
Landmark / historic district
No

HPD registration #309440, last renewed May 28, 2025.

Questions about 1405 Prospect Place

Who owns 1405 Prospect Place?

The owner of record in NYC Department of City Planning PLUTO data is 1405 Prospect Pl INC.

Does 1405 Prospect Place have violations?

Yes. NYC HPD has recorded 169 housing violations at this property.

Is 1405 Prospect Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1405 Prospect Place built?

City records list 1910 as the year it was built.

How many apartments are in 1405 Prospect Place?

It has 40 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.