roofy

139 Albany Avenue

Brooklyn, NY 11213BBL 3-01346-0006Map

Owner of record: Townhouse Rental V, L.l.c.

139 Albany Avenue is a walk-up apartment building built in 2004 in Brooklyn, 11213. It has 3 residential units across 3 floors. The owner of record is Townhouse Rental V, L.l.c.. HPD has recorded 90 housing violations here, most recently on July 29, 2026. 14 of the 50 most recent violations are still open.

HPD violations
90
DOB violations
1
ECB violations
8
HPD complaints
91

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 90

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing

    Jul 29, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective vanity in the 2nd bathroom from east at north located at apt 3, 3rd story, 1st apartment from west at north

    Jul 29, 2026 · Apt 3

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective cracked glass pane at skylight in the 2nd room from east at south located at apt 3, 3rd story, 1st apartment from west at north

    Jul 29, 2026 · Apt 3

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from east at south located at apt 3, 3rd story, 1st apartment from west at north

    Jul 29, 2026 · Apt 3

    Open — Civ14 mailed
  • C

    Properly repair or replace the broken or defective wash basin in the 2nd bathroom from east at north located at apt 3, 3rd story, 1st apartment from west at north

    Jul 29, 2026 · Apt 3

    Open — Civ14 mailed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall

    Jul 29, 2026

    Open — Nov certified on time
Show 40 more ↓
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • A

    Paint or post a sign indicating floors signage missing at public hall

    Jul 29, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door east 2, at 2nd story

    Jul 29, 2026

    Open — First no access to re- inspect violation
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jan 19, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Sep 28, 2022 · Apt 1

    Closed — Violation closed
  • A

    Refit the door in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Sep 28, 2022 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective . in the entrance located at apt 3, 3rd story, 1st apartment from west at north

    Jun 7, 2022 · Apt 3

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at the ceiling in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from west at north

    Jun 7, 2022 · Apt 3

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and walls. in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the foyer located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 3rd room from north located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 2nd room from north located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2022 · Apt 1

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling near skylight in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 19, 2022 · Apt 3

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Feb 19, 2022 · Apt 3

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 2 sqft at ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east original violation 14226885 issued 09-apr-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Apr 9, 2021 · Apt 1

    Open — Violation will be reinspected
  • C

    Provide ready access to buildings heating system door locked at public hall, 1st story

    Apr 9, 2021

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 2 sqft at ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective silicone caulking around bath tub in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall at bath tub in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from east at south located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor inside sink base cabinet at north wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 9, 2021 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt unit1g lower level, 1st story, 1st apartment from north at east

    Jan 28, 2020 · Apt UNIT1G

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt unit1g lower level, 1st story, 1st apartment from north at east

    Jan 28, 2020 · Apt UNIT1G

    Closed — Violation closed

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 17, 2019

    Dob violation - dismissed

ECB violations · 8

  • Class - 2

    At time of inspection i observed failure to housekeeping under renovation premises. construction debris including gas tanks, roofing materials & electric bx cable and household debris stored in rear yard which

    Jan 27, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Work does not conform to approved construction docuemnts and or approved amendments premises under alt 2 job #321982084 at time of inspection found (1) a+3 floor plan not shows new gas filed dryer and washer (1

    Nov 12, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work without a permit observed in apartment on 3rd floor work in progress for insterior renovation over stairways constructed closet for laundry machine installation with drain on floor and gas piping and value

    Jul 18, 2019 · Penalty $1,250

    Resolve
  • Non-hazardous

    New building occupied without a valid certificate of occupancy. new building number: 301432368 note: temporary c of o #301432368 issued on: april 26, 2004. expired on: 07/25/2004. remedy: obtain a valid c of o.

    Mar 21, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Expired permit upon inspection of above property outside steaks fraiming in progress nb permit has expired on 11/9/03 stop all construction work remedy renew permit as per dob code

    Dec 29, 2003 · Penalty $500

    Resolve
  • Non-hazardous

    Expired permit upon inspection of above property job site fence inplace fn permit was expired on 11/9/03 remedy renew permit as per dob code

    Dec 29, 2003 · Penalty $400

    Resolve
  • Hazardous

    Failure to safeguard public propety affected by construction operations at time of inspection man were working taping and there was an opening on the 3rd fl rear 8' wide x high approx 4-0'0 ground fl with no pr

    Jul 28, 2003 · Penalty $1,500

    Resolve
  • Non-hazardous

    Failure to provide handrails on stairwells at time of inspection man wer working taping and there were no handrails on tadder from 1 st to 3rd from remedy provide handrails on stairwell

    Jul 28, 2003 · Penalty $1,250

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 18, 2026 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Jul 21, 2026 · Apt 3

    Close
  • Door/window

    Window pane

    Jul 21, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jul 21, 2026 · Apt 3

    Close
  • Plumbing

    Basin/sink

    Jul 21, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jul 21, 2026 · Apt 3

    Close
  • Appliance

    Electric/gas range

    Jul 21, 2026 · Apt 3

    Close
  • Plumbing

    Basin/sink

    Jul 25, 2025 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 2

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Mar 28, 2022 · Apt 3

    Close
  • Paint/plaster

    Wall

    Feb 23, 2022 · Apt 1

    Close
  • Paint/plaster

    Wall

    Feb 23, 2022 · Apt 1

    Close
  • Safety

    Carbon monoxide detector

    Feb 23, 2022 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Feb 23, 2022 · Apt 1

    Close
  • Water leak

    Heavy flow

    Feb 23, 2022 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 23, 2022 · Apt 1

    Close
  • Appliance

    Refrigerator

    Feb 23, 2022 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Feb 23, 2022 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 18, 2022 · Apt UNIT1

    Close
  • Appliance

    Electric/gas range

    Feb 18, 2022 · Apt UNIT1

    Close
  • Appliance

    Refrigerator

    Feb 18, 2022 · Apt UNIT1

    Close
  • Unsanitary condition

    Pests

    Feb 18, 2022 · Apt UNIT1

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2022 · Apt UNIT1

    Close
  • Water leak

    Heavy flow

    Feb 18, 2022 · Apt UNIT1

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2022 · Apt UNIT1

    Close
  • Water leak

    Slow leak

    Feb 3, 2022 · Apt 3

    Close
  • Water leak

    Heavy flow

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Appliance

    Refrigerator

    Apr 8, 2021 · Apt 1FL

    Close
  • Unsanitary condition

    Pests

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Flooring/stairs

    Floor

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Safety

    Smoke detector

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Safety

    Carbon monoxide detector

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Appliance

    Refrigerator

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Water leak

    Heavy flow

    Apr 8, 2021 · Apt 1FL

    Close
  • Unsanitary condition

    Pests

    Apr 8, 2021 · Apt 1FL

    Close
  • Safety

    Smoke detector

    Apr 8, 2021 · Apt 1FL

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2021 · Apt 1FL

    Close
  • Safety

    Carbon monoxide detector

    Apr 8, 2021 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2021 · Apt 1FL

    Close
  • Water leak

    Heavy flow

    Apr 8, 2021 · Apt UNIT1

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2021 · Apt UNIT1

    Close
  • Paint/plaster

    Ceiling

    Apr 8, 2021 · Apt 1STFLO

    Close
  • Water leak

    Heavy flow

    Apr 7, 2021 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2021 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2021 · Apt 1

    Close
  • Water leak

    Heavy flow

    Apr 7, 2021 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2004
Floors
3
Residential units
3
Building area
3,900 ft²
Lot area
2,250 ft²
Zoning
R6
Community board
308
Council district
36
Block / lot
1346 / 6
Assessed value
$123,000
Landmark / historic district
No

HPD registration #380944, last renewed Jul 16, 2026.

Questions about 139 Albany Avenue

Who owns 139 Albany Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental V, L.l.c..

Does 139 Albany Avenue have violations?

Yes. NYC HPD has recorded 90 housing violations at this property.

Is 139 Albany Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 139 Albany Avenue built?

City records list 2004 as the year it was built.

How many apartments are in 139 Albany Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.