139 Albany Avenue
Brooklyn, NY 11213BBL 3-01346-0006Map
Owner of record: Townhouse Rental V, L.l.c.
139 Albany Avenue is a walk-up apartment building built in 2004 in Brooklyn, 11213. It has 3 residential units across 3 floors. The owner of record is Townhouse Rental V, L.l.c.. HPD has recorded 90 housing violations here, most recently on July 29, 2026. 14 of the 50 most recent violations are still open.
- HPD violations
- 90
- DOB violations
- 1
- ECB violations
- 8
- HPD complaints
- 91
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 90
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing at public hall
Jul 29, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective vanity in the 2nd bathroom from east at north located at apt 3, 3rd story, 1st apartment from west at north
Jul 29, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective cracked glass pane at skylight in the 2nd room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jul 29, 2026 · Apt 3
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jul 29, 2026 · Apt 3
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective wash basin in the 2nd bathroom from east at north located at apt 3, 3rd story, 1st apartment from west at north
Jul 29, 2026 · Apt 3
Open — Civ14 mailed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall
Jul 29, 2026
Open — Nov certified on time
Show 40 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Paint or post a sign indicating floors signage missing at public hall
Jul 29, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door east 2, at 2nd story
Jul 29, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 19, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1, 1st story, 1st apartment from north at east
Sep 28, 2022 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit the door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Sep 28, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective . in the entrance located at apt 3, 3rd story, 1st apartment from west at north
Jun 7, 2022 · Apt 3
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 3rd room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jun 7, 2022 · Apt 3
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and walls. in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the foyer located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 3rd room from north located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 2nd room from north located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2022 · Apt 1
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling near skylight in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north
Feb 19, 2022 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Feb 19, 2022 · Apt 3
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sqft at ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east original violation 14226885 issued 09-apr-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 9, 2021 · Apt 1
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall, 1st story
Apr 9, 2021
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Apr 9, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sqft at ceiling in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective silicone caulking around bath tub in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall at bath tub in the 2nd bathroom from east at north located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from east at south located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor inside sink base cabinet at north wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Apr 9, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt unit1g lower level, 1st story, 1st apartment from north at east
Jan 28, 2020 · Apt UNIT1G
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt unit1g lower level, 1st story, 1st apartment from north at east
Jan 28, 2020 · Apt UNIT1G
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed
ECB violations · 8
- Class - 2
At time of inspection i observed failure to housekeeping under renovation premises. construction debris including gas tanks, roofing materials & electric bx cable and household debris stored in rear yard which
Jan 27, 2020 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction docuemnts and or approved amendments premises under alt 2 job #321982084 at time of inspection found (1) a+3 floor plan not shows new gas filed dryer and washer (1
Nov 12, 2019 · Penalty $625
Resolve - Class - 1
Work without a permit observed in apartment on 3rd floor work in progress for insterior renovation over stairways constructed closet for laundry machine installation with drain on floor and gas piping and value
Jul 18, 2019 · Penalty $1,250
Resolve - Non-hazardous
New building occupied without a valid certificate of occupancy. new building number: 301432368 note: temporary c of o #301432368 issued on: april 26, 2004. expired on: 07/25/2004. remedy: obtain a valid c of o.
Mar 21, 2005 · Penalty $2,500
Resolve - Non-hazardous
Expired permit upon inspection of above property outside steaks fraiming in progress nb permit has expired on 11/9/03 stop all construction work remedy renew permit as per dob code
Dec 29, 2003 · Penalty $500
Resolve - Non-hazardous
Expired permit upon inspection of above property job site fence inplace fn permit was expired on 11/9/03 remedy renew permit as per dob code
Dec 29, 2003 · Penalty $400
Resolve - Hazardous
Failure to safeguard public propety affected by construction operations at time of inspection man were working taping and there was an opening on the 3rd fl rear 8' wide x high approx 4-0'0 ground fl with no pr
Jul 28, 2003 · Penalty $1,500
Resolve - Non-hazardous
Failure to provide handrails on stairwells at time of inspection man wer working taping and there were no handrails on tadder from 1 st to 3rd from remedy provide handrails on stairwell
Jul 28, 2003 · Penalty $1,250
Resolve
Complaints
- Unsanitary condition
Pests
Aug 18, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Jul 21, 2026 · Apt 3
Close - Door/window
Window pane
Jul 21, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 3
Close - Plumbing
Basin/sink
Jul 21, 2026 · Apt 3
Close - Unsanitary condition
Mold
Jul 21, 2026 · Apt 3
Close - Appliance
Electric/gas range
Jul 21, 2026 · Apt 3
Close - Plumbing
Basin/sink
Jul 25, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Jan 18, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 2
Close
Show 40 more ↓
- Water leak
Slow leak
Mar 28, 2022 · Apt 3
Close - Paint/plaster
Wall
Feb 23, 2022 · Apt 1
Close - Paint/plaster
Wall
Feb 23, 2022 · Apt 1
Close - Safety
Carbon monoxide detector
Feb 23, 2022 · Apt 1
Close - Plumbing
Basin/sink
Feb 23, 2022 · Apt 1
Close - Water leak
Heavy flow
Feb 23, 2022 · Apt 1
Close - Unsanitary condition
Pests
Feb 23, 2022 · Apt 1
Close - Appliance
Refrigerator
Feb 23, 2022 · Apt 1
Close - Appliance
Electric/gas range
Feb 23, 2022 · Apt 1
Close - Unsanitary condition
Pests
Feb 18, 2022 · Apt UNIT1
Close - Appliance
Electric/gas range
Feb 18, 2022 · Apt UNIT1
Close - Appliance
Refrigerator
Feb 18, 2022 · Apt UNIT1
Close - Unsanitary condition
Pests
Feb 18, 2022 · Apt UNIT1
Close - Paint/plaster
Ceiling
Feb 18, 2022 · Apt UNIT1
Close - Water leak
Heavy flow
Feb 18, 2022 · Apt UNIT1
Close - Heat/hot water
Apartment only
Feb 18, 2022 · Apt UNIT1
Close - Water leak
Slow leak
Feb 3, 2022 · Apt 3
Close - Water leak
Heavy flow
Apr 8, 2021 · Apt 1STFLO
Close - Appliance
Refrigerator
Apr 8, 2021 · Apt 1FL
Close - Unsanitary condition
Pests
Apr 8, 2021 · Apt 1STFLO
Close - Flooring/stairs
Floor
Apr 8, 2021 · Apt 1STFLO
Close - Paint/plaster
Wall
Apr 8, 2021 · Apt 1STFLO
Close - Appliance
Electric/gas range
Apr 8, 2021 · Apt 1STFLO
Close - Safety
Smoke detector
Apr 8, 2021 · Apt 1STFLO
Close - Safety
Carbon monoxide detector
Apr 8, 2021 · Apt 1STFLO
Close - Appliance
Refrigerator
Apr 8, 2021 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Apr 8, 2021 · Apt 1STFLO
Close - Water leak
Heavy flow
Apr 8, 2021 · Apt 1FL
Close - Unsanitary condition
Pests
Apr 8, 2021 · Apt 1FL
Close - Safety
Smoke detector
Apr 8, 2021 · Apt 1FL
Close - Appliance
Electric/gas range
Apr 8, 2021 · Apt 1FL
Close - Safety
Carbon monoxide detector
Apr 8, 2021 · Apt 1FL
Close - Heat/hot water
Apartment only
Apr 8, 2021 · Apt 1FL
Close - Water leak
Heavy flow
Apr 8, 2021 · Apt UNIT1
Close - Heat/hot water
Apartment only
Apr 8, 2021 · Apt UNIT1
Close - Paint/plaster
Ceiling
Apr 8, 2021 · Apt 1STFLO
Close - Water leak
Heavy flow
Apr 7, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Apr 7, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Apr 7, 2021 · Apt 1
Close - Water leak
Heavy flow
Apr 7, 2021 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2004
- Floors
- 3
- Residential units
- 3
- Building area
- 3,900 ft²
- Lot area
- 2,250 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 36
- Block / lot
- 1346 / 6
- Assessed value
- $123,000
- Landmark / historic district
- No
HPD registration #380944, last renewed Jul 16, 2026.
Questions about 139 Albany Avenue
Who owns 139 Albany Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental V, L.l.c..
Does 139 Albany Avenue have violations?
Yes. NYC HPD has recorded 90 housing violations at this property.
Is 139 Albany Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 139 Albany Avenue built?
City records list 2004 as the year it was built.
How many apartments are in 139 Albany Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.