roofy

1926 Pacific Street

Brooklyn, NY 11233BBL 3-01344-0121Map

Owner of record: Saratoga Hill Holdings LLC

1926 Pacific Street is a walk-up apartment building built in 1910 in Brooklyn, 11233. It has 6 residential units across 3 floors. The owner of record is Saratoga Hill Holdings LLC. HPD has recorded 95 housing violations here, most recently on May 5, 2025. 5 of the 50 most recent violations are still open.

HPD violations
95
DOB violations
10
ECB violations
1
HPD complaints
78

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 95

  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at fire escape at building front

    May 5, 2025

    Closed — Violation closed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north at fire escape, 2nd story

    Apr 16, 2025

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a stop at top of guide rods so as to prevent removal of dropladder at north at fire escape, 2nd story

    Apr 16, 2025

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 16, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story

    Apr 16, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Dec 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Dec 1, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Dec 1, 2024 · Apt 1R

    Closed — Violation closed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all story all balconies and parts at building front at fire escape

    Dec 1, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 1, 2024

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate at west wall window in the kitchen located at apt 1f, 1st story, 1st apartment from south at west

    Dec 1, 2024 · Apt 1F

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1f, 1st story, 1st apartment from south at west

    Dec 1, 2024 · Apt 1F

    Open — Invalid certification
  • B

    Properly repair or replace the broken or defective at ceiling in the 1st room from north at east located at apt 1f, 1st story, 1st apartment from south at west

    Dec 1, 2024 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1f, 1st story, 1st apartment from south at west

    Dec 1, 2024 · Apt 1F

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Dec 1, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective upper window sash glass pane in the 1st room from north at west located at apt 1f, 1st story, 1st apartment from south at west

    Dec 1, 2024 · Apt 1F

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate window at west wall in the 2nd room from north located at apt 1r, 1st story, 1st apartment from east at south

    Dec 1, 2024 · Apt 1R

    Open — Nov certified late
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Nov 28, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Nov 28, 2024 · Apt 1R

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story

    Nov 28, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Nov 28, 2024

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Nov 28, 2024

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Nov 28, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Remove the illegal fastening double cylinder lock at iron storm door at building entrance.

    Apr 9, 2015

    Closed — Violation closed
  • B

    Remove the illegal fastening double cylinder lock at gate at front yard of building

    Apr 9, 2015

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing drop ladder at fire escape at building front

    Dec 4, 2014

    Closed — Violation closed
  • I

    Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since 5/30/2013

    May 30, 2013

    Open — Info nov sent out
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required

    Dec 26, 2007

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, apartment at south

    Dec 15, 2003 · Apt 2R

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 15, 2003 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at west located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 15, 2003 · Apt 2R

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dropped ceiling throughout in the entire apartment located at apt 2r, 1st story, 1st apartment from east at south

    Dec 15, 2003 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system .. at boiler room, cellar

    Dec 15, 2003

    Closed — Violation closed
  • B

    Replace with new the missing west hand rail at stoop at front yard

    Dec 15, 2003

    Closed — Violation closed
  • B

    Replace with new the broken or defective springe balance at window sash in the 2nd room from east at south located at apt 1r, 1st story, apt at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1r, 1st story, apt at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1r, 1st story, apt at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective plaster board ceiling and walls in the bathroom located at apt 1r, 1st story, apt at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of evidence of water leak ceiling in the bathroom located at apt 1r, 1st story, apt at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls throughout in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Oct 27, 2003 · Apt 1R

    Closed — Violation closed

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed

ECB violations · 1

  • Non-hazardous

    Failure to maintian, building interior defects are : broken and missing plaster and sheet rock curbing in the public hall around shoj light and in the bathroom apt, of second floor south remedy : repair the def

    Nov 15, 2002 · Penalty $350

    Resolve

Complaints

  • General

    Janitor/super

    May 1, 2026 · Apt 1F

    Close
  • Door/window

    Window pane

    Feb 14, 2026 · Apt 1F

    Close
  • Water leak

    Slow leak

    Feb 14, 2026 · Apt 1F

    Close
  • Water leak

    Heavy flow

    Feb 14, 2026 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Feb 14, 2026 · Apt 1F

    Close
  • Door/window

    Window frame

    Feb 14, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 1R

    Close
  • Electric

    Power outage

    Apr 16, 2025 · Apt 1F

    Close
  • Electric

    No lighting

    Apr 16, 2025 · Apt 2F

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 29, 2024 · Apt 1R

    Close
  • Safety

    Fire escape

    Nov 29, 2024 · Apt 1R

    Close
  • Door/window

    Door

    Nov 29, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Nov 26, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2016 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jun 14, 2016 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Jun 14, 2016 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2015 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2015 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2015 · Apt 1R

    Close
  • Safety

    Fire escape

    Dec 3, 2014 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 26, 2004 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Jan 26, 2004 · Apt 1R

    Close
  • General

    Mold

    Jan 26, 2004 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2004 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2004 · Apt 1R

    Close
  • General

    Windows

    Jan 26, 2004 · Apt 1R

    Close
  • Plumbing

    Water supply

    Dec 15, 2003 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 15, 2003 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 12, 2003 · Apt 1R

    Close
  • General

    Windows

    Dec 11, 2003 · Apt 1R

    Close
  • General

    Ceramic-tile

    Dec 11, 2003 · Apt 1R

    Close
  • General

    Windows

    Dec 11, 2003 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Dec 11, 2003 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Dec 11, 2003 · Apt 1R

    Close
  • General

    Mold

    Dec 11, 2003 · Apt 1R

    Close
  • General

    Floor

    Dec 11, 2003 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 11, 2003 · Apt 1R

    Close
  • Heating

    Heat related

    Oct 22, 2003 · Apt 1R

    Close
  • General

    Windows

    Oct 22, 2003 · Apt 1R

    Close
  • General

    Mold

    Oct 22, 2003 · Apt 1R

    Close
  • General

    Floor

    Oct 22, 2003 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Oct 22, 2003 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Oct 22, 2003 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Oct 22, 2003 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Oct 22, 2003 · Apt 1R

    Close
  • General

    Floor

    Apr 13, 2003 · Apt 3F

    Close
  • Nonconst

    Vermin

    Apr 13, 2003 · Apt 3F

    Close
  • General

    Fire-escape

    Apr 13, 2003 · Apt 3F

    Close
  • General

    Floor

    Apr 13, 2003 · Apt 3F

    Close

Sales history

DatePriceTypeUnits
Mar 27, 2026$81,500Rentals - walkup apartments6

Building details

Building type
Walk-up apartment building (C2)
Year built
1910
Floors
3
Residential units
6
Building area
4,465 ft²
Lot area
2,438 ft²
Zoning
R6
Community board
308
Council district
41
Block / lot
1344 / 121
Assessed value
$459,450
Landmark / historic district
No

HPD registration #372680, last renewed Apr 21, 2026.

Questions about 1926 Pacific Street

Who owns 1926 Pacific Street?

The owner of record in NYC Department of City Planning PLUTO data is Saratoga Hill Holdings LLC.

Does 1926 Pacific Street have violations?

Yes. NYC HPD has recorded 95 housing violations at this property.

Is 1926 Pacific Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1926 Pacific Street built?

City records list 1910 as the year it was built.

How many apartments are in 1926 Pacific Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.