1899 Pacific Street
Brooklyn, NY 11233BBL 3-01338-0065Map
Owner of record: Parvez, Mohammed
1899 Pacific Street is a two-family home built in 1910 in Brooklyn, 11233. It has 2 residential units across 2 floors. The owner of record is Parvez, Mohammed. HPD has recorded 59 housing violations here, most recently on March 22, 2026. 24 of the 50 most recent violations are still open.
- HPD violations
- 59
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 59
- BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at west and north walls in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 22, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Mar 22, 2026 · Apt 2
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the at cellar
Mar 22, 2026
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the 40 cubic yards of debris and rubbish at cellar
Mar 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 22, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the 3rd room from east located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 5th room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles and ceramic tiles at south wall in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from north at east
May 12, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the east, south, west, and north walls in the 8th room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the north wall in the 7th room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective closet door at east wall in the 7th room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Repair the leaky and/or defective water supply pipe under washbain in the 6th room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective ceramic floor and wall tiles at south wall in the 6th room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the 5th room from east at north located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door in the 5th room from east at north located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the 3rd room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling in the 3rd room from east located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor and south wall in the bathroom located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling in the 1st room from east at north located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, south, west, and north walls in the kitchen located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all stories, rooms, ceilings, and walls in the entire apartment located at apt bldg, 1st story, 1st apartment from north at east
May 12, 2025 · Apt BLDG
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 23, 2025
Open — Info nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical extension cords running across floor throughout all rooms in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 2nd door from south at west wall, 1st door frame from south at west wall in the 4th room from north located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door from east at south wall, 2nd door from east at south wall, 1st door frame from east at south wall, 2nd door frame from east at south wall in the 1st room from north at west located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of excessive household item accumulation at boiler room
Apr 22, 2025
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at boiler room at cellar
Apr 22, 2025
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north wall, ceiling in the 1st room from north at west located at apt 1fl, 1st story, 1st apartment from west at north
Apr 22, 2025 · Apt 1FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Mar 20, 2026 · Apt PRIVAT
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt 1STAND
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt HOUSE
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt ENTIRE
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt BLDG
Close - Paint/plaster
Wall
May 8, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 18, 2025 · Apt PVT
Close - Plumbing
Bathtub/shower
Apr 18, 2025 · Apt PVT
Close - Plumbing
Bathtub/shower
Apr 18, 2025 · Apt PVT
Close
Show 9 more ↓
- Electric
Outlet/switch
Apr 18, 2025 · Apt PVT
Close - Paint/plaster
Ceiling
Apr 18, 2025 · Apt PVT
Close - Plumbing
Bathtub/shower
Aug 13, 2012 · Apt 2
Close - Paint/plaster
Ceiling
Aug 13, 2012 · Apt 2
Close - Electric
Lighting
Aug 13, 2012 · Apt 2
Close - Nonconst
Vermin
Aug 13, 2012 · Apt 2
Close - Nonconst
Vermin
Aug 13, 2012 · Apt 2
Close - General
Fire-escape
Aug 13, 2012 · Apt 2
Close - General
Stairs
Aug 13, 2012 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B9)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 1,328 ft²
- Lot area
- 1,600 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1338 / 65
- Assessed value
- $57,360
- Landmark / historic district
- No
Questions about 1899 Pacific Street
Who owns 1899 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is Parvez, Mohammed.
Does 1899 Pacific Street have violations?
Yes. NYC HPD has recorded 59 housing violations at this property.
Is 1899 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1899 Pacific Street built?
City records list 1910 as the year it was built.
How many apartments are in 1899 Pacific Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.