461 East New York Avenue
Brooklyn, NY 11225BBL 3-01331-0056Map
Owner of record: Associated Beth Rivka School For Girls
461 East New York Avenue is an office building built in 2023 in Brooklyn, 11225. The owner of record is Associated Beth Rivka School For Girls. HPD has recorded 9 housing violations here, most recently on December 31, 2012.
- HPD violations
- 9
- DOB violations
- 3
- ECB violations
- 18
- HPD complaints
- 29
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at walls in the bathroom located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste pipe at sink in the kitchen located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass at window upper sash in the 3rd room from north at west located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste pipe at wash basin in the bathroom located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Dec 31, 2012 · Apt 1
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed
ECB violations · 18
- Class - 2
At the time of inspection, the supported scaffold at exposure 1 was found not in compliance with bc3314.8 due to loose netting and planking at multiple locations, posing an immediate risk of dislodgement in hig
Aug 10, 2024 · Penalty $2,500
Resolve - Class - 1
Time of inspection observed plastic barricades at the buildings exposure # 1, barricades not weighted down, follow manufactures specifications to add weight to plastic barricades to protect personnel and pedest
Dec 13, 2022 · Penalty $625
Resolve - Class - 1
Time of inspection, observed plastic barricades at exposure # 1 with cyclone fence installed on the plastic barricades, upon request to view the design from a design professional none were provided.fence instal
Dec 13, 2022 · Penalty $625
Resolve - Class - 1
At the time of my inspection, site has permit to work from 7:00 am till 6:00pm, site doing excavation for footings, summons other than complaint, observed a partial demolition of a foundation wall at exposure #
Jul 19, 2022 · Penalty $1,250
Resolve - Class - 2
Inspection of an 7 story building with work in progress, i observed at exposure two of adjacent building with crack that have expanded approximately half inch or more creating condition for partial collape. al
Jul 12, 2022 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a proposed 7 story building, observed cyclone fence installed on top of the plastic barricades, upon request to view the design drawings for the cyclone fence on top of the barri
Jul 8, 2022 · Penalty $1,250
Resolve - Class - 1
At the time of my inspection, observed plastic traffic barricades on the roadway to protect pedestrians using the sidewalk in the street from vehicular traffic, on east new york avenue, new york avenue and leff
Jul 8, 2022 · Penalty $2,500
Resolve - Class - 2
I observed active worksite at excavation phase with no fence installed at exp3 indicating where the jobsite terminates and where the adjacent jobsite begins. upon request to see a ccd1 for fence waiver, none wa
Apr 26, 2022 · Penalty $500
Resolve - Class - 2
Soe for exp2 adj property-ac28-104.7.1 i observed active jobsite at excavation phase with 4x4 timber supporting slab at exp2. upon request to view approved plans or pe. plans, none were provided. i was told by
Apr 26, 2022 · Penalty $625
Resolve - Class - 2
Competent person(cp) not provided-3301.13.12 i observed active worksite with 2 workers mixing cement. upon request to see (cs) or cp, elias riera who was the cp for 408 lefferts ave told me he is also the cp fo
Apr 26, 2022 · Penalty $2,500
Resolve
Show 8 more ↓
- Class - 1
Miscellaneous violations. no tr1 for structural stability(ss)1704.20.2and excavation(exc)1704.20.3 i observe active worksite at excavation phase with adjoining properties at exp2 and 4. upon researching the dep
Apr 25, 2022 · Penalty $625
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39044788m issued7/22/21 &to file c/c pursuant to28-201.1&1rcny102-01.for unlawfully contd work on notice of swo no records of correction atoi compl
Nov 19, 2021
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#39044788m issued on 07/22/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.unlawfully continued work
Sep 30, 2021
Resolve - Class - 1
At time of inspection, construction fence at premises built without a permit - fence permit #b00464038 expired 06-08-2021 and signed off by contractor, obtain permit; obtain fence permit
Jul 22, 2021 · Penalty $625
Resolve - Class - 1
At time of inspection, premises completely demolished to grade contrary to full stop work order #3306545, comply with stop work order; comply with full stop work order
Jul 22, 2021
Resolve - Class - 1
Failure to maintain bldg in code-complaint manner: no fire stopping per bc 712.3;27-345. noted: covered corridor,to 1st fl apt is located approx 7'-0" above sunken areaway. the bsmt ceiling of the corridor,appr
Oct 27, 2011 · Penalty $5,000
Resolve - Class - 2
Failure to maintain bldg in code-complaint manner. noted: defective wiring & exposed live electrical wires,at 1st fl living room. remedy: repair &/or replace.
Oct 27, 2011 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code-complaint manner. noted: masonarystairs to basement apt & boiler room,has no handrail. remedy: repair &/or replace.
Oct 27, 2011 · Penalty $2,500
Resolve
Complaints
- General
Mold
Dec 5, 2012 · Apt 1
Close - Nonconst
Vermin
Dec 5, 2012 · Apt 1
Close - Paint/plaster
Wall
Dec 5, 2012 · Apt 1
Close - General
Ceramic-tile
Dec 5, 2012 · Apt 1
Close - Plumbing
Basin/sink
Dec 5, 2012 · Apt 1
Close - Plumbing
Toilet
Dec 5, 2012 · Apt 1
Close - Nonconst
Vermin
Dec 5, 2012 · Apt 1
Close - Plumbing
Basin/sink
Dec 5, 2012 · Apt 1
Close - Nonconst
Vermin
Dec 5, 2012 · Apt 1
Close - Nonconst
Vermin
Dec 5, 2012 · Apt 1
Close
Show 19 more ↓
- Nonconst
Vermin
Dec 5, 2012 · Apt 1
Close - General
Mold
Dec 5, 2012 · Apt 1
Close - Paint/plaster
Wall
Dec 5, 2012 · Apt 1
Close - General
Ventilation system
Dec 5, 2012 · Apt 1
Close - General
Windows
Dec 5, 2012 · Apt 1
Close - General
Stairs
Dec 5, 2012 · Apt 1
Close - General
Mold
Nov 8, 2012 · Apt 1
Close - General
Mold
Nov 8, 2012 · Apt 1
Close - Paint/plaster
Wall
Nov 8, 2012 · Apt 1
Close - Paint/plaster
Wall
Nov 8, 2012 · Apt 1
Close - Plumbing
Bathtub/shower
Nov 8, 2012 · Apt 1
Close - Plumbing
Shower-stall
Nov 8, 2012 · Apt 1
Close - Plumbing
Water-leaks
Nov 8, 2012 · Apt 1
Close - Appliance
Electric/gas range
May 6, 2009 · Apt TOP
Close - Paint/plaster
Wall
May 6, 2009 · Apt TOP
Close - General
Mold
May 6, 2009 · Apt TOP
Close - Nonconst
Vermin
May 6, 2009 · Apt TOP
Close - Heating
Heat related
Apr 22, 2009 · Apt TOP
Close - General
Cooking gas
Apr 22, 2009 · Apt TOP
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Oct 23, 2025 | $8,500,000 | Office buildings | 1 |
Building details
- Building type
- Office building (O3)
- Year built
- 2023
- Floors
- 7
- Residential units
- —
- Building area
- 15,026 ft²
- Lot area
- 3,600 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 40
- Block / lot
- 1331 / 56
- Assessed value
- $1,192,050
- Landmark / historic district
- No
Questions about 461 East New York Avenue
Who owns 461 East New York Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Associated Beth Rivka School For Girls.
Does 461 East New York Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 461 East New York Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 461 East New York Avenue built?
City records list 2023 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.