roofy

227 Sullivan Place

Brooklyn, NY 11225BBL 3-01305-0076Map

Owner of record: 227 Realty Group

227 Sullivan Place is a walk-up apartment building built in 1923 in Brooklyn, 11225. It has 27 residential units across 4 floors. The owner of record is 227 Realty Group. HPD has recorded 629 housing violations here, most recently on July 23, 2026. 47 of the 50 most recent violations are still open.

HPD violations
629
DOB violations
46
ECB violations
5
HPD complaints
683

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 629

  • B

    Properly repair with similar material the broken or defective rotten wood floor in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperatve in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 00, wg to repair = 0 in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door at door in the entrance west wall in the foyer located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective buldged and uneven wood floor in the foyer located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective cracked marble sink's countertop with missing section, above base cabinet, at east wall in the kitchen located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
Show 40 more ↓
  • B

    Replace with new the missing door saddle in the entrance at west wall in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department th ceiling and all walls in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Notice of issuance sent to tenant
  • C

    Remove the illegal double cylinder key operated locking device at door at , door in the entrance , west wall , in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the 1st room from east at north located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at less than 10 sqft north and east wall in the bathroom located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Notice of issuance sent to tenant
  • A

    Paint metal in accordance with dept. regulation the heat riser at east wall in the bathroom located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at , wash basin , west wall in the bathroom located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom bell buzzer , from east wall at building 's vestibule , to west wall in the foyer located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective buldged and uneven wood floor in the 2nd room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective rotten wood floor in the 3rd room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door in the entrance at north wall in the 3rd room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east at south located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door is locked at cellar

    Jul 23, 2026

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes the storage of household items and ladder at balcony, obstructing egress , southeast section, building' s front yard at fire escape, 3rd story

    Jul 23, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective cracked fire retardant materials plaster at ceiling , at building 's vestibule at public hall, 1st story

    Jul 23, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cracked wired glass at,lower sash of window opening , 2nd from north at east wall , north section, at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at, ceiling , building 's vestibule , at public hall, 1st story

    Jul 23, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cracked and uneven ,marble tread at, stairs to split level , 4th from bottom up , building 's vestibule , at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires with dislodged metal cover at outlets , adjacent to stair soffit , north wall, north section at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cracked ceramic floor tiles at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective cracked glass at, window's upper sash , 1st from north at east wall , south section, at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective dislodged , window's lower sash , 1st from north at, east wall , south section, at public hall, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • B

    Replace with new the missing missing iron handrail at wall to stair below grade, southwest section , building ' front yard , at fire passage way

    Jul 23, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective dislodged wire mesh at, exit door to steel enclosure , southwest secrion, building front yard, at fire passage way

    Jul 23, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective crcaked marble saddle at, door in the entrance, at west wall, in the foyer located at apt a1, 1st story, 1st apartment from north at east

    Jul 23, 2026 · Apt A1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling , 1st story

    Jun 3, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materials at ceiling , 1st story

    Jun 3, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling , 1st story

    Jun 3, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    Jun 3, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 3rd story, 1st apartment from west at north

    Apr 20, 2026 · Apt 5C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from west at north

    Apr 20, 2026 · Apt 5C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from west at north

    Apr 20, 2026 · Apt 5C

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door lock at basement at 1st boiler room from north

    Apr 7, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt a4, 1st story, 1st apartment from west at north

    Apr 7, 2026 · Apt A4

    Open — Nov sent out

DOB building violations · 46

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Immediate emergency anythingoptional

    Remedy:erect construction fence approx 10'ft away from the retaining wall going the entire span of the wall up to the stairs. creating a controlled access zone allowing egress through the alleyway to the gate on rogers avenue, to safeguard the public from further collapse of the retaining wall. total fence should be approx 65ft

    Aug 29, 2025

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code-complaint manner. atoi, retaining wall at rear of the building exp3 in disrepair. wall approx. 6'ft.(h). 55 linear ft of retaining wall has vertical/diagonal stress cracks/split from top to bottom (left/right-side) & leaning towards courtyard area. creating unsafe hazardous conditions to occupants in

    Aug 27, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 22, 2024

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2023

    Dob violation - active
Show 36 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations · 5

  • Class - 1

    Failure to maintain building in a code-complaint manner. atoi, observed the retaining wall at rear of the building exp3 in disrepair. noted wall approx. 6'ft.(h). 55 linear ft of retaining wall has vertical/dia

    Aug 27, 2025 · Penalty $12,500

    Active
  • Class - 2

    15,34a,36,50,50a,50b,50c,50d. 50-spill switch is missing; 50a-heat timer sensor is incorrectly located; 50b-coil relief valves are not piped down; 50c-oil tank sign is missing; 50d-oil tank room light is

    Aug 30, 2018 · Penalty $3,125

    Active
  • Class - 2

    B201.(b201)new hb smith boiler and carlin oil burner installed and running on arival with disapproved permit #320791602.

    Dec 16, 2015 · Penalty $4,000

    Active
  • Class - 3

    B354,48,32a,16,50a,b,c,d,e,f,g,h,i,j,6c,36. 50a- mixing valve missing on coil fittings. 50b- anti (phasom) valve missing on oil line. 50c- pipe hot water relief valve discharge down. no threaded end. 50d-

    Jul 12, 2010 · Penalty $200

    Active
  • Class - 1

    B101,51. 50a- work w/o a permit. 28-105.1. 50b- no work permit filed w/dob for the replacement boiler and sections.

    Jul 12, 2010 · Penalty $8,000

    Active

Complaints

  • Water leak

    Heavy flow

    Jul 18, 2026 · Apt A1

    Close
  • Water leak

    Heavy flow

    Jul 17, 2026 · Apt A1

    Close
  • Water leak

    Heavy flow

    Jul 13, 2026 · Apt A1

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2026 · Apt A1

    Close
  • Paint/plaster

    Wall

    Apr 28, 2026 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Apr 28, 2026 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Apr 21, 2026 · Apt A3

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 19, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Apr 19, 2026 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2026 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Feb 26, 2026 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Feb 21, 2026 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt 2C

    Close
  • Plumbing

    Bathtub/shower

    Feb 2, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Feb 2, 2026 · Apt 6B

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 6B

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt A4

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt 4C

    Close
  • Plumbing

    Bathtub/shower

    Feb 2, 2026 · Apt 6B

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BUILDI

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt A6

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt A6

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Jan 22, 2026 · Apt A6

    Close
  • Plumbing

    Basin/sink

    Jan 22, 2026 · Apt A6

    Close
  • Plumbing

    Basin/sink

    Jan 22, 2026 · Apt A6

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2026 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt C5

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt A6

    Close
  • Plumbing

    Basin/sink

    Dec 25, 2025 · Apt A6

    Close
  • Plumbing

    Basin/sink

    Dec 25, 2025 · Apt A6

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1923
Floors
4
Residential units
27
Building area
27,300 ft²
Lot area
8,250 ft²
Zoning
R7-1
Community board
309
Council district
35
Block / lot
1305 / 76
Assessed value
$982,350
Landmark / historic district
No

HPD registration #311407, last renewed Oct 16, 2023.

Questions about 227 Sullivan Place

Who owns 227 Sullivan Place?

The owner of record in NYC Department of City Planning PLUTO data is 227 Realty Group.

Does 227 Sullivan Place have violations?

Yes. NYC HPD has recorded 629 housing violations at this property.

Is 227 Sullivan Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 227 Sullivan Place built?

City records list 1923 as the year it was built.

How many apartments are in 227 Sullivan Place?

It has 27 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.