421 Crown Street
Brooklyn, NY 11213BBL 3-01292-0001Map
Owner of record: 421 Crown St HDFC
421 Crown Street is a walk-up apartment building built in 1923 in Brooklyn, 11213. It has 39 residential units across 4 floors. The owner of record is 421 Crown St HDFC. HPD has recorded 235 housing violations here, most recently on May 4, 2026. 31 of the 50 most recent violations are still open.
- HPD violations
- 235
- DOB violations
- 18
- ECB violations
- 8
- HPD complaints
- 143
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 235
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective faucets hot water faucet in the bathroom located at apt 12al, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 12AL
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter balance of the lower sash at the 3rd window from east at south in the 2nd room from east located at apt 12al, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 12AL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 12al, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 12AL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective the counter balance of the lower sash at the 2nd window from south at west in the 3rd room from east located at apt 12al, 3rd story, 1st apartment from east at south
Feb 19, 2025 · Apt 12AL
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Jan 3, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 3, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at 2nd fire door from east leading to center court at north at public hall, 1st story
Jan 3, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... (hinges) in the entrance located at apt 1r, 1st story, 1st apartment from east at south
Jan 3, 2025 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 2nd fire door from east leading to center court at north at public hall, 1st story
Jan 3, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective transom light glass pane at building entrance door , 1st story
Jan 3, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at 2nd fire door from east leading to center court at north at public hall, 1st story
Jan 3, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at 2nd fire door from east at north leading to center court at public hall, 1st story
Oct 28, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at 2nd fire door from east at north leading to center court, latch at public hall, 1st story
Oct 28, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective transom light glass pane at building entrance door , 1st story
Oct 28, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 28, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at fire door leading to roof at east, hinges, at bulkhead at public hall, 4th story, section ''east''
Oct 28, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at 2nd fire door from east at north leading to center court at public hall, 1st story
Oct 28, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at basement section east
Oct 28, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at fire door leading to basement at north, missing
Oct 28, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at fire door leading to roof at west, hinges, at bulkhead at public hall, 4th story, section ''west''
Oct 28, 2024
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser (1st from east at south) in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 11, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Oct 11, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 11, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Oct 11, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 11, 2024
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 11, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east and north walls in the private hallway located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallway located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective counterbalance at upper window sash (1st from north at east) in the 1st room from north located at apt 1r, 1st story, 1st apartment from east at south , section ''east''
Oct 11, 2024 · Apt 1R
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Oct 9, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing , 1st story
Oct 9, 2024
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing , 1st story
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 9, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Oct 9, 2024
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Oct 9, 2024
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Sep 27, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Sep 27, 2024 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Sep 27, 2024 · Apt 1R
Open — Defect letter issued - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixtures at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Sep 27, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Sep 27, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash, west 1 window in the kitchen located at apt 12l, 3rd story, 1st apartment from south at west , section ''west''
Aug 25, 2024 · Apt 12L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around escutchen plate at ceiling in the bathroom located at apt 12l, 3rd story, 1st apartment from south at west , section ''west''
Aug 25, 2024 · Apt 12L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around escutchen plates at ceiling in the kitchen located at apt 12l, 3rd story, 1st apartment from south at west , section ''west''
Aug 25, 2024 · Apt 12L
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash, west 1 window, 1st window from south. in the 1st room from north located at apt 12l, 3rd story, 1st apartment from south at west , section ''west''
Aug 25, 2024 · Apt 12L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective upper and lower refregerator door gaskets in the kitchen located at apt 12l, 3rd story, 1st apartment from south at west , section ''west''
Aug 25, 2024 · Apt 12L
Closed — Violation closed
DOB building violations · 18
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 26, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active
Show 8 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 8
- Class - 2
At the time of inspection. observed sidewalk shed in place installed at exp#1 and 2, but no shed parapet information panel was provided as required by the bc. this condition creates a hazardous condition by cau
Oct 15, 2026 · Penalty $1,250
Active - Class - 2
Active job permit # b01318430-i1-gc expires on 4/17/2026 observed at time of inspection permit not posted at the premises., post/properly post permit
Apr 15, 2026 · Penalty $300
Active - Class - 1
Atoi inspector observed swo that was issued on 10/11/2024 has been removed from apt 1r door and 2nd one next to intercom screen by the front entrance......, comply with code
Jul 25, 2025 · Penalty $25,000
Active - Class - 2
Ecb violation issued. atoi observed at exposure 1 on the facde a peace of metal supporting the concrete from falling failure to maintain, repair and/or replace
Jul 22, 2025 · Penalty $6,250
Active - Class - 2
Atoi observed electrical work being done in the kitchen of apartment 1r on the 1st floor without a permit or documentation on file with the department. observed new exposed electrical mc cable run on the ceilin
Oct 11, 2024 · Penalty $4,000
Active - Class - 1
Failure to maintain building in a code compliant. chimney located north center court yard missing mortar and cracked. missing bricks, repair and/replace
May 22, 2024 · Penalty $6,250
Active - Class - 1
Observed fire escape exit passageway at exp# to street obstructed by padlocked gate. exit door from court yard obstructed by bicycles. exit door from court yard to building not properly closing. at rear of the
Nov 1, 2023 · Penalty $6,250
Active - Class - 1
Work without a permit observed at the time on inspection on the fourth (4th) floor (apt 19l) the removal of wall, electric panel box, bx cable. electric outlet was observed dangling. no permit issued according
Jun 22, 2023 · Penalty $2,500
Resolve
Complaints
- Electric
Lighting
Nov 13, 2025 · Apt 1R
Close - Door/window
Window frame
Dec 26, 2024 · Apt 1R
Close - General
Cabinet
Dec 26, 2024 · Apt 1R
Close - Water leak
Slow leak
Dec 10, 2024 · Apt 12AL
Close - Water leak
Slow leak
Dec 3, 2024 · Apt 12AL
Close - Plumbing
Bathtub/shower
Nov 8, 2024 · Apt 12AL
Close - Plumbing
Basin/sink
Nov 8, 2024 · Apt 12AL
Close - Unsanitary condition
Mold
Oct 8, 2024 · Apt 1R
Close - Water leak
Slow leak
Oct 8, 2024 · Apt 1R
Close - Door/window
Window frame
Oct 8, 2024 · Apt 1R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Oct 8, 2024 · Apt 1R
Close - Electric
No lighting
Sep 23, 2024 · Apt 1R
Close - Water leak
Slow leak
Sep 23, 2024 · Apt 1R
Close - Door/window
Window frame
Jul 24, 2024 · Apt 12L
Close - Appliance
Refrigerator
Jul 24, 2024 · Apt 12L
Close - Paint/plaster
Cabinet
Jul 24, 2024 · Apt 12L
Close - Appliance
Electric/gas range
Jul 24, 2024 · Apt 12L
Close - Water leak
Heavy flow
Jul 24, 2024 · Apt 12L
Close - Water leak
Slow leak
Dec 19, 2023 · Apt 1RWATE
Close - Electric
Lighting
Dec 18, 2023 · Apt 16R
Close - Water leak
Slow leak
Dec 18, 2023 · Apt 16R
Close - Water leak
Heavy flow
Dec 18, 2023 · Apt 8R
Close - Electric
Wiring
Nov 17, 2023 · Apt 19L
Close - Water leak
Heavy flow
Oct 17, 2023 · Apt 2R
Close - Unsanitary condition
Pests
Oct 5, 2023 · Apt 14L
Close - Safety
Fire escape
Jun 10, 2023 · Apt BLDG
Close - General
Signage missing
Jan 3, 2023 · Apt 1R
Close - General
Signage missing
Jan 3, 2023 · Apt 1R
Close - Heat/hot water
Apartment only
Dec 27, 2022 · Apt 8R
Close - Heat/hot water
Entire building
Dec 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 15, 2022 · Apt 15L
Close - Heat/hot water
Apartment only
Dec 13, 2018 · Apt 16R
Close - Paint/plaster
Ceiling
Sep 12, 2016 · Apt 15L
Close - Plumbing
Basin/sink
Sep 12, 2016 · Apt 15L
Close - Water leak
Damp spot
Sep 12, 2016 · Apt 15L
Close - Unsanitary condition
Mold
Sep 12, 2016 · Apt 15L
Close - Plumbing
Water supply
Aug 18, 2015 · Apt 15L
Close - Plumbing
Basin/sink
Aug 18, 2015 · Apt 15L
Close - Plumbing
Bathtub/shower
Aug 18, 2015 · Apt 15L
Close - Heating
Heat related
Feb 18, 2013 · Apt 3B
Close - Plumbing
Water supply
Jun 1, 2012 · Apt 10L
Close - Plumbing
Water supply
Jun 1, 2012 · Apt 10L
Close - Plumbing
Water-leaks
May 8, 2012 · Apt 5L
Close - Paint/plaster
Ceiling
May 8, 2012 · Apt 5L
Close - Paint/plaster
Ceiling
May 8, 2012 · Apt 5L
Close - Paint/plaster
Ceiling
May 8, 2012 · Apt 5L
Close - Paint/plaster
Ceiling
May 8, 2012 · Apt 5L
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 27, 2026 | $570,000 | Coops - walkup apartments | — |
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1923
- Floors
- 4
- Residential units
- 39
- Building area
- 44,700 ft²
- Lot area
- 12,775 ft²
- Zoning
- R4
- Community board
- 309
- Council district
- 35
- Block / lot
- 1292 / 1
- Assessed value
- $1,184,400
- Landmark / historic district
- No
HPD registration #320188, last renewed Aug 15, 2025.
Questions about 421 Crown Street
Who owns 421 Crown Street?
The owner of record in NYC Department of City Planning PLUTO data is 421 Crown St HDFC.
Does 421 Crown Street have violations?
Yes. NYC HPD has recorded 235 housing violations at this property.
Is 421 Crown Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 421 Crown Street built?
City records list 1923 as the year it was built.
How many apartments are in 421 Crown Street?
It has 39 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.