1102 President Street
Brooklyn, NY 11225BBL 3-01281-0025Map
Owner of record: President Arms
1102 President Street is an elevator apartment building built in 1915 in Brooklyn, 11225. It has 16 residential units across 4 floors. The owner of record is President Arms. HPD has recorded 45 housing violations here, most recently on May 5, 2026. 4 of the 45 most recent violations are still open.
- HPD violations
- 45
- DOB violations
- 24
- ECB violations
- 5
- HPD complaints
- 47
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of iron fence enclosure without exit gate obstructing exit from fire escape at building's front yard
Oct 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed
Show 35 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked marble door saddle at, entrance door ,east wall, in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door from west at north wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from north at east, the private hallway , the 3rd room from north, the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked marble door saddle in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, south wall, 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective reglaze with porcelain paint the bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Oct 16, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Dec 7, 2024 · Apt 3D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Dec 7, 2024 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 4th story, 2nd apartment from east at south
Oct 29, 2024 · Apt 4B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4b, 4th story, 2nd apartment from east at south original violation 17381662 issued 29-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 29, 2024 · Apt 4B
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 24, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door at wall cabinet at west wall in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 24, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective at sink counter top and base cabinet in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 24, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the 2nd bathroom from east located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 24, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets ... at sink in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Feb 22, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south
Mar 2, 2022 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 4th story
Mar 24, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materialc at ceiling at public hall, 4th story
Mar 24, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Mar 24, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west , section at west
Mar 29, 2019 · Apt 2C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west , section at west
Mar 29, 2019 · Apt 2C
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Feb 21, 2019 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, apartment at south , section at south
Jan 8, 2018 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door to cellar at boiler room
Jan 8, 2018
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at wall at public hall, 1st story
Aug 6, 2017
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department west wall in the kitchen located at apt 1a, 1st story
Apr 12, 2016 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal tread, 14th up from bottom, 3rd story, front of building at fire escape
Aug 7, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling bathroom 2 sty southeast apt 2g , section '' ''
Aug 26, 1999 · Apt 2G
Closed — Violation dismissed
DOB building violations · 24
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2005
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2003
Dob violation - resolved - Elevator elevatorrequired
3p7299
Mar 1, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 1994
Vpw*-violation unserved ecb-work without permit-dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed
ECB violations · 5
- Non-hazardous
2x11,37g12,35d6,57o2. 2-alarm not working. 37-wire on fuse. 35-smokehole grating. 57-pit dirty.
Mar 17, 1998 · Penalty $175
Resolve - Non-hazardous
02l,11q.
Feb 24, 1996 · Penalty $1,000
Resolve - Non-hazardous
08i,28h.
Mar 3, 1995
Resolve - Non-hazardous
08v 20l 37u 50u 54u 57o
Mar 12, 1993
Resolve - Non-hazardous
09h,08a,40#,73r,#40 provide date tag or perform 5 year test #73 provide proof of filing for elevator #7299
Oct 10, 1991 · Penalty $150
Resolve
Complaints
- Heat/hot water
Entire building
Nov 1, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Oct 15, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt 3D
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 21, 2024 · Apt 3B
Close - Appliance
Refrigerator
Mar 21, 2024 · Apt 3B
Close - Plumbing
Basin/sink
Mar 21, 2024 · Apt 3B
Close - Appliance
Refrigerator
Feb 19, 2024 · Apt 3B
Close - Plumbing
Bathtub/shower
Feb 19, 2024 · Apt 3B
Close
Show 37 more ↓
- Water leak
Slow leak
Feb 19, 2024 · Apt 3B
Close - Appliance
Electric/gas range
Jul 20, 2023 · Apt 3A
Close - Heat/hot water
Apartment only
Mar 1, 2022 · Apt 2A
Close - Heat/hot water
Entire building
Mar 23, 2021 · Apt 4C
Close - Heat/hot water
Apartment only
Dec 12, 2019 · Apt 3B
Close - Heat/hot water
Entire building
Dec 12, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2019 · Apt 3B
Close - Appliance
Electric/gas range
Oct 18, 2019 · Apt 3B
Close - Appliance
Electric/gas range
May 8, 2019 · Apt 2C
Close - Appliance
Electric/gas range
Mar 26, 2019 · Apt 2C
Close - Plumbing
Toilet
Feb 13, 2019 · Apt 2C
Close - Electric
No lighting
Feb 13, 2019 · Apt 2C
Close - Flooring/stairs
Floor
Feb 13, 2019 · Apt 2C
Close - Unsanitary condition
Pests
May 22, 2018 · Apt 2C
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 5, 2018 · Apt 4A
Close - Heat/hot water
Entire building
Jan 3, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt 1B
Close - Appliance
Electric/gas range
Jul 28, 2017 · Apt 2C
Close - Unsanitary condition
Mold
Apr 4, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt 4B
Close - Heat/hot water
Entire building
Oct 23, 2014 · Apt BLDG
Close - Safety
Fire escape
Aug 5, 2014 · Apt BLDG
Close - Heating
Heat related
Jan 4, 2014 · Apt NA
Close - Heating
Heat related
Nov 25, 2013 · Apt 4D
Close - Nonconst
Vermin
Jun 13, 2005 · Apt 1A
Close - Plumbing
Water-leaks
Jun 13, 2005 · Apt 1A
Close - Nonconst
Vermin
Nov 9, 2004 · Apt 2A
Close - Appliance
Refrigerator
Oct 11, 2004 · Apt 2A
Close - General
Cabinet
Oct 31, 2003 · Apt 2-B
Close - General
Windows
Oct 31, 2003 · Apt 2-B
Close - Electric
Bell-buzzer/intercom
Oct 31, 2003 · Apt 2-B
Close - General
Doors
Oct 31, 2003 · Apt 2-B
Close - General
Doors
Oct 31, 2003 · Apt 2-B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 1915
- Floors
- 4
- Residential units
- 16
- Building area
- 14,600 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1281 / 25
- Assessed value
- $982,800
- Landmark / historic district
- No
HPD registration #317332, last renewed Jul 9, 2026.
Questions about 1102 President Street
Who owns 1102 President Street?
The owner of record in NYC Department of City Planning PLUTO data is President Arms.
Does 1102 President Street have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 1102 President Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1102 President Street built?
City records list 1915 as the year it was built.
How many apartments are in 1102 President Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.