1585 Bedford Avenue
Brooklyn, NY 11225BBL 3-01281-0011Map
Owner of record: 1000 President Street Development Corpn
1585 Bedford Avenue is a walk-up apartment building built in 1905 in Brooklyn, 11225. It has 16 residential units across 4 floors. The owner of record is 1000 President Street Development Corpn. HPD has recorded 377 housing violations here, most recently on October 18, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 377
- DOB violations
- 22
- ECB violations
- 8
- HPD complaints
- 480
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 377
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information at public hall, 1st story
Oct 18, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Oct 18, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system lock door to boiler room at boiler room
Oct 18, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at south wall in the foyer located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north at east located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north at east located at apt 4d, 4th story, 1st apartment from west at north
Oct 18, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Oct 18, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and at all ceiling in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulk around at baseboard in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from north at east located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective marble saddle at floor in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at south wall in the entrance located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north
Oct 18, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass at vestibule door , 1st story
Aug 6, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective glasspane at building entrance door , 1st story
Aug 6, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west
Aug 6, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective glass pane at building entrance door
Aug 5, 2026
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landings at public hall stairs, 4th story
Aug 5, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at vestibule door
Aug 5, 2026
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the door frame in the entrance located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the window frame at south wall in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at window frame at south wall in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Violation will be reinspected - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Abate the nuisance consisting of pests. evidence of gnats in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 7, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Jun 4, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
Jun 4, 2026 · Apt 3D
Closed — Violation dismissed
DOB building violations · 22
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2017
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 26, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2015
Dob violation - resolved
Show 12 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2004
Dob violation - resolved - Elevator elevatorrequired
3p7279
Aug 14, 2001
Dob violation - resolved - Elevator elevatorrequired
3p7278
Jul 20, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 8
- Class - 2
1) cleaning of elevator pit. 2) properly secure facia in hoistway car door clutch scrapping between floors 2 and 3.
Jul 29, 2026
Resolve - Class - 2
Replace worn gibs where needed. secure gibs where needed. hall button and position indicators defective. clutch scraping during travel. provide designated lobby braille tags. piston leaking. provide return line
Apr 17, 2025 · Penalty $3,125
Active - Class - 2
Found burnham v9 steam cast iron boiler ftm
Mar 18, 2020 · Penalty $3,125
Active - Class - 1
97x17:the only elevator in bldg or section of bldg out of service.uponinspection the device is found to be out of service creating a hazardous condition as per 1rcny 11-02.rem:restore to service immediately and
Oct 23, 2017 · Penalty $1,000
Resolve - Class - 1
97x10. 97x10 the only elevator in building out of service.upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny1102.restore to service immediately & notify nycdob
Oct 13, 2017 · Penalty $1,000
Resolve - Class - 2
3l10,3d6,10h11,29j1,67l10. 3l10-toeguard rubbing repair; 3d6-car enclosure unsecured properly secure; 10h11-car door gibs worn replace; 29j1-door operator misaligned adjust; 67l10-communiation defective repair
Aug 21, 2017 · Penalty $250
Resolve - Class - 1
2l10,67l10
Jun 1, 2015 · Penalty $5,000
Resolve - Class - 2
15b07.24x10.05b01.61c09.15b provide location of cert. 24x repair indicator in car 05b adjust gap on car door
Feb 12, 2009 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - General
Bell/buzzer/intercom
Oct 23, 2026 · Apt 3D
Open - Paint/plaster
Cabinet
Oct 23, 2026 · Apt 3D
Open - Paint/plaster
Wall
Oct 23, 2026 · Apt 3D
Open - Paint/plaster
Ceiling
Oct 23, 2026 · Apt 3D
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 17, 2026 · Apt 3D
Open
Show 40 more ↓
- Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 11, 2026 · Apt 3D
Open - General
Bell/buzzer/intercom
Oct 10, 2026 · Apt 3D
Open - Door/window
Door
Oct 10, 2026 · Apt 3D
Open - Door/window
Window pane
Oct 10, 2026 · Apt 3D
Close - General
Bell/buzzer/intercom
Oct 10, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 3D
Close - Door/window
Door
Oct 6, 2026 · Apt 2D
Open - Door/window
Door
Jul 27, 2026 · Apt BLDG
Close - Door/window
Window frame
Jul 27, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Jul 27, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 3D
Close - Water leak
Slow leak
Jul 27, 2026 · Apt 3D
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Jul 27, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 26, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jun 26, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Jun 26, 2026 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
May 30, 2026 · Apt 3D
Close - Unsanitary condition
Mold
May 30, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt 3D
Close - Water leak
Slow leak
May 28, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt 3D
Close - Unsanitary condition
Mold
May 28, 2026 · Apt 3D
Close - Door/window
Door
May 28, 2026 · Apt 3D
Close - Door/window
Door
May 28, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt 3D
Close - General
Bell/buzzer/intercom
May 11, 2026 · Apt BLDG
Close - Door/window
Door
May 11, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Mar 23, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Mar 23, 2026 · Apt 4D
Close - Water leak
Slow leak
Mar 23, 2026 · Apt 3D
Close - Flooring/stairs
Floor
Mar 23, 2026 · Apt 4D
Close - Paint/plaster
Window/frame
Mar 23, 2026 · Apt 3D
Close - Water leak
Slow leak
Jan 29, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Nov 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Sep 13, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1905
- Floors
- 4
- Residential units
- 16
- Building area
- 13,200 ft²
- Lot area
- 4,698 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1281 / 11
- Assessed value
- $885,150
- Landmark / historic district
- No
HPD registration #365683, last renewed Aug 28, 2025.
Questions about 1585 Bedford Avenue
Who owns 1585 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1000 President Street Development Corpn.
Does 1585 Bedford Avenue have violations?
Yes. NYC HPD has recorded 377 housing violations at this property.
Is 1585 Bedford Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1585 Bedford Avenue built?
City records list 1905 as the year it was built.
How many apartments are in 1585 Bedford Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.