273 Kingston Avenue
Brooklyn, NY 11213BBL 3-01258-0001Map
Owner of record: Lc, LLC
273 Kingston Avenue is a mixed residential and retail building built in 1904 in Brooklyn, 11213. It has 4 residential units across 3 floors. The owner of record is Lc, LLC. HPD has recorded 4 housing violations here, most recently on April 25, 2018. 3 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 41
- ECB violations
- 53
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 25, 2018
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches located at apt 2, 1st apartment from north at east
May 15, 2013 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of mice located at apt 2, 1st apartment from north at east
May 15, 2013 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of mice located at apt 2, 2nd story, 1st apartment from north at east
May 15, 2013 · Apt 2
Open — First no access to re- inspect violation
DOB building violations · 41
- Immediate emergency anythingoptional
Immedialtey install a minimum of 2 lines of shoring along the exp4 wal l along the full length & full building height from cell to roof. shor ing line to be connected & braced w/ transverse x-bracing (n-s directi on). shore below the exp 1/4 corner at the underside of the 2nd fl ove rhang. install lataral bracing at exp1 & exp4 walls back to the struct
Jul 10, 2024
Dob violation - dismissed - Construction other optional
Full vacate/failure to maintain bldg in a safe condition.exp1&exp4 had various step [email protected] severe vert crack@1stfl near 1/4 store windw crnr&step crack emanatng up towards 2ndfl.fully vacate bldg until hazardous cnditions have perm remedied undr prmt.ownr to rtain nyspe to eval ent bldg
Jul 9, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner . the occupied building structure with concrete framing observed to be in a state of disrepair .cracks , with cracks at various location.
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active
Show 31 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 17, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 2, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 13, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 20, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - active - Construction other optional
Stop all work make site safe contact dob
May 4, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
ECB violations · 53
- Class - 1
Failure to comply with commissioner's order in dob violation vi023-01897 dated 06/20/2023. responded was required to submit an engineer's report concerning structurally deficient conditions. as of 05/27/2026, a
May 27, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39518005z, file a certificate of correction
May 27, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39518154m., file a certificate of correction
May 27, 2026 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioner's order in dob violation vio23-01897,dated 6/20/2023.respondent was required to submit an engineer'sreport concerning structurally deficient conditions.as of 10/11/2023,a
Oct 11, 2023 · Penalty $12,500
Active - Class - 1
There are step cracks and a serious vertical crack at exp. 4 . the walls at both sides of entry door are clearly out of plumb. the awning structure could be covering more faults.
Jun 22, 2023 · Penalty $25,000
Active - Class - 1
Failure to maintain building in code-compliant manner. failure to maintqain building in code compliant manner. noted: observed at exposure # 4 there are vertical and horizontal cracks on the ground floor going
Jun 20, 2023 · Penalty $1,250
Active - Class - 1
Work with out permit. having erected a solid metal fence approx 10 high with roof, and roll down gate. at expo # 3, directly against the adjoining pronerty building wall, and at exposure 4, enclosing the fire e
Mar 29, 2022
Resolve - Class - 1
Failure to maintain building in code compliant manner.at this premise at kingston avenue side above 2nd floor stepping patterns crack at lincoln place side(exp4)several areas show minor bulging and stepping pat
Nov 22, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted observed during inspection facade has cracks throughout.at exp1 left hand side in between the 2nd and 3rd floor windows the bricks are bulging out and
Oct 1, 2021
Resolve - Class - 1
Failure to maintain bldg walls &/or appurtenances noted:@exps1&4 multiple cracks observed thruout in various locations prev ecb35557821n maintain exterior bldg
Aug 25, 2021
Resolve
Show 40 more ↓
- Class - 1
Failure to maintain bldg wall(s) or appurtenances.noted:bldg facade instate of disrepair w/multiple cracks@exp1&4.maintain exterior bldg wall.
Jun 7, 2021
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. at the time of inspection & observed at exp#4 facing lincoln place,below 2nd fl window & 1st fl sty windows vertical cracks approx 10'0 & stepping pettern bricks
Apr 24, 2021 · Penalty $25,000
Active - Class - 1
Reissue #35502907 issued on 09/14/2020:failure to maintain bldg walls or appurtenances at the time of inspection & observed at exp#4 facing lincoln place just below 2nd fl window vertical cracks approx. 10' at
Dec 15, 2020 · Penalty $25,000
Active - Class - 1
Reissue #35467891j date of issued 01-30-20 failure to maintain bldg walls or appuretannces observed at exp 1& exp 4 facing kingston ave side right side top window sillcracks & bottom of window sill crack in wal
Sep 14, 2020
Resolve - Class - 1
Failure to maintain buidling walls or appurtannces noted at exposure 1 + 4 with vertical and horizontal cracks throughout in various locations and stepcracks previous ecb #35459188h maintain exterior building w
Jan 30, 2020 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: observed at exp#4 on the right side of the bldg. the are vertical & horizontal cracks on the wall from the 1st fl to the 2nd fl. also at front of bldg at
Dec 9, 2019 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg exterior walls or appurtenances. note: at exp#4 there are vertical & horizontal cracks & seperations in the brick mortar. previous ecb#35422385m. remedy: maintain exterior bldg walls &
Oct 16, 2019 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#4 there are vertical & horizontal cracks & seperations in the bricks,brick mortar. previous ecb#35422385h. remedy: maintain exterior bldg walls.
Aug 20, 2019
Resolve - Class - 1
Failure to maintain building walls or appurtenances. noted: at exp.4 observed vertical and horizontal cracks/separation in brick/mortar wall. previous ecb #35422385h remedy: maintain exterior building walls
Jul 13, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. at the time of inspection noted: at exp#4(right side of bldg)horizontal & vertical cracks between mortar joints & running down the bricks. condition recurring.
May 2, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain building wall(s) on appurtenances. at exp#4 verti cal and horizontal cracks. rmdy: maintain building walls.
Mar 6, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg wall(s)or appurtenances at exp #4 vertical and horizontal cracks upto 2nd floor from ground level also 1 crack up by 2nd fl level right corner exp #2/rem:maintain bldg walls
Jan 8, 2019 · Penalty $25,000
Active - Class - 1
Failure to maintain building walls or appurtenance:note at exposure#4 from ground level up vertical and horizontal cracks to 2nd fl. also atexposure#1 entrance door leading to apts leaning to right. remedy:main
Nov 28, 2018 · Penalty $25,000
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: observed at exp#4 from around level vertical & horizontal cracks to 2nd fl. also at exp#1 the entrance door to the apt is leaning toward the right & is
Oct 15, 2018 · Penalty $6,250
Active - Class - 1
Reissue vio#35335499k failure to maintain bldg walls or appurtenances.note: at exp#4 ground level verticval & horizontal cracks 1/4(width approx). remedy: maintain exterior bldg wall.
Sep 8, 2018 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg walls or appurtenances. note at exp#4 ground level vertical & horizaontal crack(1/4" width approx) remedy: maintain exterior bldg wall.
Jul 23, 2018
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances, noted:@time insp observed @exp#3 & #4 vertical cracks from ground to (2nd) fl also exp#1 entrances door leading to (right) of apts,need to make repairs,rem:com
Jun 13, 2018
Resolve - Class - 1
Failure to maintain building walls and appurtenances:note:at exposure #3 and #4 vertical cracks from ground to 2nd floor also at exposure #1entrance door leading to apartments leaning to right.rem:maintain buil
Apr 12, 2018
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp34 thereare vertival cracks from the ground up to the 2nd fl. at exp#1 the entrance door to the apts is leaning towards the right & is not plumb.
Feb 9, 2018 · Penalty $10,000
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#4 thereare vertical cracks from the ground to the 2nd fl. at exp#1 the entrance door to the apt is leaning towards the right & is not plumb.
Dec 27, 2017 · Penalty $500
Active - Class - 1
Failure to maintain building wall(s) or appurtenances. noted: at exposure #4 there are vertical cracks from the ground to the second floor. at exposure #1 the entrance door to the apartments is leaning towards
Nov 3, 2017 · Penalty $2,500
Active - Class - 1
Failure to maintain bldg wall(s)or appurtenances.noted:vertical cracks from grd to 2nd fl at exp#4 and addtl cracks on exp#1 various locations.entrance door to apt at exp#1 is leaning towards right.rem:maintain
Sep 16, 2017 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: bldg has vertical cracks at exp#1 & 4 from 1st fl to 3rd fl(step cracks)also at parapet. remedy: comply w/the code.
Jul 26, 2017 · Penalty $1,250
Active - Class - 2
Failure to comply w/ the comm's order contained in summons/vio#35235992x issued on 4/12/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.no compliance recorded for failure to maintain bldg
Jun 11, 2017
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner: use of prohibited door &/or hardware per bc 1008.1.8 & 27-371(j). noted: metal fence doors at ext 4 have dead bolt locks w/latches installed that can be lock
May 31, 2017 · Penalty $500
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: bldg walls at exp#1 & 4 are shifing towards street corner,multiple continuous step cracks from 3rd to 1st fl at exp#1&4,step cracks at parapet corner of
May 31, 2017 · Penalty $2,500
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35209047m issued on 03/01/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply with commis
Apr 23, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances. noted: @ exp#1 & exp#2, step cracks & verticle cracks from 1st to 3rd flr. rem: comply w/code.
Apr 12, 2017
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#1 & 2,step cracks & verticle cracks from 1fl to 3fl at exp#2,loose masonry at window sill at 1st fl. remedy: comply w/code.
Apr 12, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35221675p issued on 10/21/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed passageway for exit.
Apr 12, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain walls or appurtenances.observed vertical crack from ground to 2nd flr on expo#4.also additional cracks on expo31 at 2nd level and at roof on expo#4.observed apt entrance door at expo#1 leani
Mar 1, 2017 · Penalty $500
Active - Class - 2
Failure to comply w/the comm's order contained in nov #35149045r issued on 08/24/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. for obstructed exit passageway at rear fire escape.
Oct 21, 2016 · Penalty $4,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: fire escape located along lincoln pl section of the bldg & terminates behind an erected fence approx 10feet higher totally obstructing a safe place of ref
Oct 21, 2016 · Penalty $2,500
Active - Class - 1
Failure to maintain. noted: exterior brick wall (kingston ave section)in disrepair w/step cracks at both 2nd & 3rd fl levels. sill at 3rd level also show displacement. 1st fl level of bldg,there is evidence of
Oct 21, 2016 · Penalty $1,000
Active - Class - 1
Failure to provide unobstructed exit passageway.observed fire escape on exposure 3 is enclosed behind a metal fence erected apprx 10'high.also behind same fence is large pile of combustibles including but not
Aug 24, 2016 · Penalty $6,000
Active - Class - 2
Work w/o a permit. work noted: at exp#4(lincoln pl)erected approx 50'long x 10'high x 3'wide steel enclosure w/entry doors & roll down gate.remedy: obtain all necessary permits.
Mar 18, 2016 · Penalty $800
Active - Class - 1
Splices made are not properly covered. basement. remedy: comply w/ec code.
Aug 7, 2013 · Penalty $8,000
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipment. apparatus, materials,devices,appliances or wiring in use. defective fixtures,outlets,bx not terminated and flex cord used as permanent wiring. entire basement
Aug 7, 2013 · Penalty $8,000
Active - Class - 2
Failure to provide/maintain sufficient access/work space about electrical equipment. min work space is not provided in front of electrical equipment basement. remedy: provide/maintain access/work space.
Aug 7, 2013 · Penalty $2,500
Active - Class - 2
Sec. ec 300.3b. raceway is not provided for open conductors, open wiring. raceway is not provided for physical protection of conductors basement. remedy: comply w/ec code.
Aug 7, 2013 · Penalty $4,000
Active
Complaints
- General
Cabinet
Dec 7, 2023 · Apt 2G
Close - Water leak
Heavy flow
Dec 7, 2023 · Apt 2G
Close - Door/window
Door
Dec 7, 2023 · Apt 2G
Close - Nonconst
Vermin
Mar 27, 2013 · Apt 2
Close - Nonconst
Vermin
Mar 27, 2013 · Apt 2
Close - Nonconst
Vermin
Mar 27, 2013 · Apt 2
Close - Nonconst
Vermin
Mar 27, 2013 · Apt 2
Close - Heating
Heat related
Mar 20, 2006 · Apt BLDG
Close - Heating
Heat related
Mar 20, 2006 · Apt 1FL
Close - Heating
Heat related
Feb 9, 2005 · Apt 2
Close
Show 5 more ↓
- Heating
Heat related
Dec 21, 2004 · Apt 3
Close - General
Windows
Apr 30, 2003 · Apt 2F
Close - Plumbing
Toilet
Apr 30, 2003 · Apt 2F
Close - Appliance
Electric/gas range
Apr 30, 2003 · Apt 2F
Close - Paint/plaster
Wall
Apr 30, 2003 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1904
- Floors
- 3
- Residential units
- 4
- Building area
- 3,675 ft²
- Lot area
- 1,960 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1258 / 1
- Assessed value
- $377,550
- Landmark / historic district
- Crown Heights North III Historic District
HPD registration #818310, last renewed Jun 25, 2025.
Questions about 273 Kingston Avenue
Who owns 273 Kingston Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Lc, LLC.
Does 273 Kingston Avenue have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 273 Kingston Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 273 Kingston Avenue built?
City records list 1904 as the year it was built.
How many apartments are in 273 Kingston Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.