268 Albany Avenue
Brooklyn, NY 11213BBL 3-01251-0035Map
Owner of record: Albany Estates LLC
268 Albany Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11213. It has 8 residential units across 4 floors. The owner of record is Albany Estates LLC. HPD has recorded 308 housing violations here, most recently on May 17, 2026. 34 of the 50 most recent violations are still open.
- HPD violations
- 308
- DOB violations
- 13
- ECB violations
- 2
- HPD complaints
- 620
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 308
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective subfloor in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical sub panel at west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective subfloor in the private hallway located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective apartment entrance door in the entrance located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at apartment entrance door 1st from north at west wall in the entrance located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at north wall in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at 1st window frame from north at east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft at window frame from north at east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west original violation 18935862 issued 17-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 17, 2026 · Apt 2L
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose washbasin cabinet in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective subfloor in the 5th room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective subfloor in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 5th room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, 1st window frame from south at west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling, north wall, baseboard at north wall, ceiling in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, ceiling, ceiling, ceiling in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 5th room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the private hallway located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall in the 5th room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of uncapped radiator pipe at north wall in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door, 1st closet from north at east wall door frame in the 5th room from east located at apt 2l, 2nd story, 1st apartment from south at west
May 17, 2026 · Apt 2L
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 1l, 1st story, 1st apartment from east at south
Jul 29, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Jul 29, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 12, 2024 · Apt 2L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 12, 2024 · Apt 2L
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Jun 2, 2024 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Jun 2, 2024 · Apt 2R
Closed — Violation closed - BHazardous
Properly secure the loose wash basin in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
May 21, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
May 21, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 5th room from east located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4r, 4th story, 1st apartment from west at north
Jan 22, 2024 · Apt 4R
Closed — Violation dismissed
DOB building violations · 13
- Plumbing none
The dept of buildings intends to revoke laa #340557178 on all plumbing work. stop all work immediately and make site safe
May 2, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 2
- Non-hazardous
Failue to maintain. defects are cracked stucco and open corner at north east of bulkhead, broken and cracked plaster at various location throughout the public hall. remedy: make all necessary repairs.
Dec 20, 2002
Resolve - Hazardous
Failure to maintain hazardous defects are: sagging sloping interior steps. detached worped loose plastic step covers tripping hazard on steps missing spindles (balisters) at banisters problems exist throughout
Jun 19, 2002 · Penalty $800
Resolve
Complaints
- Door/window
Door frame
Oct 4, 2026 · Apt 4L
Open - Door/window
Door
Oct 4, 2026 · Apt 4L
Open - Plumbing
Radiator
May 5, 2026 · Apt 2L
Close - Electric
Wiring
May 5, 2026 · Apt 2L
Close - Paint/plaster
Wall
May 5, 2026 · Apt 2L
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 2L
Close - Electric
Wiring
May 5, 2026 · Apt 2L
Close - General
Cabinet
May 5, 2026 · Apt 2L
Close - Unsanitary condition
Pests
May 5, 2026 · Apt 2L
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 2L
Close
Show 40 more ↓
- General
Cabinet
May 5, 2026 · Apt 2L
Close - Door/window
Door frame
May 5, 2026 · Apt 2L
Close - Door/window
Window frame
May 5, 2026 · Apt 2L
Close - Paint/plaster
Wall
May 5, 2026 · Apt 2L
Close - Plumbing
Basin/sink
May 5, 2026 · Apt 2L
Close - Unsanitary condition
Mold
May 5, 2026 · Apt 2L
Close - Paint/plaster
Wall
May 5, 2026 · Apt 2L
Close - Paint/plaster
Ceiling
May 5, 2026 · Apt 2L
Close - Electric
Wiring
May 5, 2026 · Apt 2L
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 2L
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 2L
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 2L
Close - Paint/plaster
Ceiling
Jul 28, 2024 · Apt 1L
Close - Heat/hot water
Apartment only
May 31, 2024 · Apt 2R
Close - Heat/hot water
Apartment only
May 21, 2024 · Apt 1L
Close - Heat/hot water
Apartment only
May 21, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 22, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 22, 2024 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 1L
Close - Heat/hot water
Apartment only
Jan 20, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 20, 2024 · Apt 1L
Close - Electric
Lighting
Dec 21, 2023 · Apt 4R
Close - Electric
Lighting
Dec 21, 2023 · Apt 4R
Close - Water leak
Heavy flow
Dec 21, 2023 · Apt 4R
Close - Appliance
Refrigerator
Apr 3, 2023 · Apt 1L
Close - Unsanitary condition
Pests
Mar 1, 2023 · Apt 2L
Close - Flooring/stairs
Floor
Mar 1, 2023 · Apt 2L
Close - Flooring/stairs
Floor
Mar 1, 2023 · Apt 2L
Close - General
Cabinet
Mar 1, 2023 · Apt 2L
Close - Plumbing
Basin/sink
Mar 1, 2023 · Apt 2L
Close - Door/window
Window frame
Mar 1, 2023 · Apt 2L
Close - Unsanitary condition
Pests
Mar 1, 2023 · Apt 2L
Close - Electric
Outlet/switch
Mar 1, 2023 · Apt 2L
Close - Electric
Wiring
Mar 1, 2023 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 8
- Building area
- 8,428 ft²
- Lot area
- 3,075 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 35
- Block / lot
- 1251 / 35
- Assessed value
- $656,100
- Landmark / historic district
- No
HPD registration #323744, last renewed Sep 12, 2025.
Questions about 268 Albany Avenue
Who owns 268 Albany Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Albany Estates LLC.
Does 268 Albany Avenue have violations?
Yes. NYC HPD has recorded 308 housing violations at this property.
Is 268 Albany Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 268 Albany Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 268 Albany Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.