roofy

1055 Bergen Street

Brooklyn, NY 11216BBL 3-01212-0065Map

Owner of record: 1055 Bergen Street Housing Development Fund Corp

1055 Bergen Street is a walk-up apartment building built in 1905 in Brooklyn, 11216. It has 16 residential units across 4 floors. The owner of record is 1055 Bergen Street Housing Development Fund Corp. HPD has recorded 1,880 housing violations here, most recently on September 11, 2026. 49 of the 50 most recent violations are still open.

HPD violations
1,880
DOB violations
20
ECB violations
18
HPD complaints
949

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,880

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall, east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, and east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wood door frame 1st door from south at west wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Sep 11, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallway located at apt 4c, 4th story, 1st apartment from west at north

    Aug 23, 2026 · Apt 4C

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at west wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north

    Aug 23, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at south wall in the 5th room from north located at apt 4c, 4th story, 1st apartment from west at north

    Aug 23, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 5th room from north located at apt 4c, 4th story, 1st apartment from west at north

    Aug 23, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north

    Aug 23, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north

    Aug 6, 2026 · Apt 3D

    Open — Nov sent out
  • B

    § 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of april 2026

    Jul 9, 2026

    Open — Nov sent out
  • B

    § 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of may 2026

    Jul 9, 2026

    Open — Nov sent out
  • B

    § 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of march 2026.

    May 20, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at east and west wall at vestibule at public hall, 1st story

    Apr 29, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors and stairs at public hall

    Apr 29, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at west and east walls at vestibule at public hall, 1st story

    Apr 29, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the west yard

    Apr 29, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective metal landing leading to west yard

    Apr 29, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective counterbalance at lower window sash, 2nd window at south in the 5th room from north at west located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the north wall in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Apr 7, 2026 · Apt 2B

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and south and west walls in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from north at west located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at east located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 4th room from north at west located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 4a, 4th story, 2nd apartment from east at south

    Apr 1, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, the south wall and the west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 11, 2026 · Apt 2B

    Open — Nov sent out

DOB building violations · 20

  • Construction other optional

    Failure to maintain.the bathroom floor@unit 1c is open &saggng bathroom@2c floor open&saggng.roofng has deteriorated.owner to engage nys pe&contractor floor framing@all floors & repair under permit obtain prmt by 10/1/25.finish by 12/1/25

    Sep 5, 2025

    Dob violation - active
  • Construction other optional

    Requesting an engineer report due to wood joists deteriorating & bowing inwards at 1fl and cellar level bathroom and kitchen from water leakage. please provide status/pictures of kitchen, bathroom floors, walls, and ceiling of apts: 1a,1b, 1d, 2a,2b,2d,3a,3b,3d,4a,4b,4c & 4d.

    Sep 3, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
Show 10 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2012

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 18

  • Class - 1

    Apt 1c in state of disrepair launch gaping holes through through floor. wooden joist have collapsed in the bathroom / kitchen area. severe sagging of floor visible in apt 2c and 3c. waterleak for upper floors t

    Sep 3, 2025 · Penalty $2,500

    Active
  • Class - 1

    Fire stopping has been compromised at basement level underneath apartment 1c. large opening visible from the basement level and inside apartment 1c. due to structural defects. creating hazardous conditions for

    Sep 3, 2025

    Resolve
  • Class - 2

    Failure to provide key for access to boiler room as per-hmc-27-2033. super,porter and key no available upon arrival.; 27-misc, comply with code; correct violatiing condition and submit a certificate of correcti

    Jul 25, 2024 · Penalty $6,250

    Active
  • Class - 2

    Boiler is inoperable. pit where boiler is located is flooded. boiler hb smith, mod #19he-7, 1106000 btus,

    May 26, 2023 · Penalty $3,125

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway.noted:at time of inspection obsurvation was made at exposure(1) front of above property garbage consisting of 10 to 15 black bags with debris/demo materials block

    Mar 7, 2020 · Penalty $6,250

    Active
  • Class - 2

    Work without a permit.noted:at time of inspection observation was made in apt 1a of above property new exposed ceiling and returned wall with new4"elbow with coupling attached to tiser for plumbing drainage use

    Mar 7, 2020 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a cert of correction with the dept of building oath/ecb violation number 320715382 served on 11-21-2011 for no work permit filed with the dob for the

    Mar 3, 2020 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35304142x issued on 11/9/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain buildi

    Aug 20, 2019

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/ violation#35304142x issued on 11/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failrue to maintain

    Jul 5, 2019

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35304142x issued on 11/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain build

    May 4, 2019

    Resolve
Show 8 more ↓
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35304142x issued on 11/9/18 & to file a cert of correction pursuantto 28-201.1.failure to maintain bldg in code compliant manner.no fire

    Feb 25, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/ violation # 35304142x issued on 11/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no firestopping bc

    Dec 27, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.no fire stoppingper bc 712.3; 27-345. observed: debris accumulation and evidences of fire damages, observed at the rear of he apt 1c, ceiling and wll surfa

    Nov 9, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. noted: drainage leaders are disconnected & defective at rear of bldg & alley way. remedy: maintain exterior/repair.

    Dec 2, 2015 · Penalty $500

    Active
  • Class - 2

    Unapproved unsafe unsuitable elctrical equipment apparatus materials devices appliances or wiring in use.on 12/02/15 @ 12:30pm i observed:defective wiring in use.outlets box are not covered 1st fl @ mail box.de

    Dec 2, 2015 · Penalty $800

    Active
  • Class - 2

    Failure to comply w/comm's order to file a c of c w/the dob's. noted: ecb #35000902r reflects "no compliance recorded" remedy: file c of c.

    Dec 2, 2015 · Penalty $400

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner.note: at roof level 5'section of exhaust duct is missing/broke off and holes in approx 2'section at roof level.rmdy:repair and/or replace.

    Dec 10, 2012 · Penalty $2,500

    Active
  • Class - 1

    B101,50a,50b, 50a-no work permit filed with d.o.b for the replacement boiler. 50b-work without a permit 28-105.1

    Nov 9, 2011 · Penalty $8,000

    Active

Complaints

  • Water leak

    Slow leak

    Aug 21, 2026 · Apt 3D

    Close
  • Water leak

    Damp spot

    Aug 21, 2026 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Aug 21, 2026 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Aug 13, 2026 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Aug 1, 2026 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Jul 21, 2026 · Apt 4C

    Close
  • Plumbing

    Bathtub/shower

    Jul 21, 2026 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Jun 28, 2026 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Jun 28, 2026 · Apt 4C

    Close
  • Water leak

    Heavy flow

    Apr 2, 2026 · Apt 1A

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Mar 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 30, 2026 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Feb 25, 2026 · Apt 2A

    Close
  • Plumbing

    Water supply

    Feb 18, 2026 · Apt APT2D

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt BLDG

    Close
  • General

    Mailbox

    Dec 1, 2025 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Nov 30, 2025 · Apt 4C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 30, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Nov 30, 2025 · Apt 4C

    Close
  • Water leak

    Slow leak

    Nov 9, 2025 · Apt 2B

    Close
  • Water leak

    Damp spot

    Nov 9, 2025 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Nov 9, 2025 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Cabinet

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Cabinet

    Nov 9, 2025 · Apt 2B

    Close
  • Water leak

    Heavy flow

    Nov 9, 2025 · Apt 2B

    Close
  • Door/window

    Window frame

    Nov 9, 2025 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Nov 9, 2025 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Janitor/super

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Mailbox

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • Door/window

    Door

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Mailbox

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Nov 9, 2025 · Apt 2B

    Close
  • General

    Mailbox

    Nov 6, 2025 · Apt 1A

    Close
  • General

    Mailbox

    Nov 6, 2025 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Oct 13, 2025 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Oct 13, 2025 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Oct 13, 2025 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Oct 13, 2025 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2025 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1905
Floors
4
Residential units
16
Building area
12,628 ft²
Lot area
4,447 ft²
Zoning
R6B
Community board
308
Council district
36
Block / lot
1212 / 65
Assessed value
$566,550
Landmark / historic district
No

HPD registration #362002, last renewed Aug 14, 2025.

Questions about 1055 Bergen Street

Who owns 1055 Bergen Street?

The owner of record in NYC Department of City Planning PLUTO data is 1055 Bergen Street Housing Development Fund Corp.

Does 1055 Bergen Street have violations?

Yes. NYC HPD has recorded 1,880 housing violations at this property.

Is 1055 Bergen Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1055 Bergen Street built?

City records list 1905 as the year it was built.

How many apartments are in 1055 Bergen Street?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.