1462 Atlantic Avenue
Brooklyn, NY 11216BBL 3-01203-0010Map
Owner of record: 1462 Maya Investors INC.
1462 Atlantic Avenue is a hotel built in 2018 in Brooklyn, 11216. It has 58 residential units across 5 floors. The owner of record is 1462 Maya Investors INC.. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 7
- ECB violations
- 53
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 16, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 18, 2020
Vp*-violation unserved ecb- dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 25, 1994
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Mar 17, 1993
Vp*-violation unserved ecb- dismissed
ECB violations · 53
- Class - 2
Bc 3307.4 bc 3307.5 dangerous areas(missing flagman) at time of my inspection on active site w/ concrete pour operation at exp#1. workers were using wheelbarrow to transport concrete to inside the site. no flag
May 4, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no handrails. at the time of inspection on active 5 sty new bldg work in progress,i observed missing handrails at stairs from 1s
Jul 15, 2020 · Penalty $2,500
Resolve - Class - 2
Const super failed to perform duties as per rule @time of inspection on an active 5 sty nb const site when request was made for the competent person i was inform that the competent person was not on site; after
Jun 26, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33. @time of inspection on an active 5 sty nb const site, when request was made for all approve const documents that by code have to remain on
Jun 24, 2020 · Penalty $2,500
Resolve - Class - 1
Failure maintain adequate housekeeping per section requirements on site @time of inspection on an active 5 sty no construction site notice alock of maintaining house keeping through-out the site. on each floor
Jun 24, 2020 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order. noted:attime of inspection at an active jobsite,upon reviewing bis observed a swo issued for exp#2. however observed worker working on scaffold at e
Mar 18, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.noted:at time of inspection of an active jobsite.observed on multiple floor and exp#1 and inadequate housekeeping which made up of construction
Mar 18, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain/display on site documents required by bc chapter 33. noted:at time of inspection of an active jobsite,upon request to see the daily inspection for sws and pipe scaffold for the beginning of
Mar 18, 2020
Resolve - Class - 1
Bc 3303.7.2 fire extinguisher. noted:at time of inspection of an active jobsite, observed on multiple floors fire extinguishers monthly inspection report was last done on 5/19/19. remedy:comply w/ nyc fire code
Mar 18, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to provide ground-fault interupter protection.at the time of my inspection,i observed that 2 workers on the job were using electric tools without using outlets or extensions cords with ground-fault inte
Feb 7, 2020 · Penalty $1,200
Resolve
Show 40 more ↓
- Class - 1
Inadequate lighting for sidewalk shed.at the time of my inspectio around 5:45pm,i observed that there were missing/burnt-out lights under the sidewalk shed at exposure 1.for public safety and per code,sidewalk
Feb 7, 2020 · Penalty $625
Resolve - Class - 1
Work contrary to plans{plans scaffolds at exp 2 and 3}at the time of my inspection,i observed that on exposure 2,there were missing pins in several of the support brackets and the working platform had missing e
Feb 7, 2020 · Penalty $2,500
Resolve - Class - 1
Work contrary to plans{needle beams at exposure 4}at the time of my inspection,i observed that the needle beams were not installed as designed.the drawings show 8 needle beams,but only 6 were constructed.also t
Feb 7, 2020 · Penalty $2,500
Resolve - Class - 1
Bc331084-site safety log {scaffolds}at the time of my inspection,i observed that the daily log books for the project and the scaffold log book did not record the inadequate installation of the scaffolds at expo
Feb 7, 2020 · Penalty $2,500
Resolve - Class - 2
Inadequate housekeeping.at the time of my inspection,i observed that the job site had accumilated debris and construction material on several levels of the job site and on/under the scaffolding.there were also
Feb 7, 2020 · Penalty $625
Resolve - Class - 1
Bc330772-gate left open at exposure 1 at 5:45pm when i went to post the stop work order,i observed that the construction gate at exposure i was left wide open with no one from the job site nearby.for public saf
Feb 7, 2020 · Penalty $625
Resolve - Class - 1
Inadequate roof protection {exposure 2}at the time of my inspection,i observed that the roof protection of the adjoining property at exposure 2 was not covered with flame-retardant plywood as stipulated by code
Feb 7, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3309.10/failure to provide roof protection of adjacent property.at time of inspection of a 5 story nb currently at roof level exterior work not completed i observed roof protection for adjacent property at ex
Oct 24, 2019 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documens.at time of inspection of a 5 story nb currently at roof level i observed installation of needle beam at exp#4 upon review of design drawing installation o
Oct 24, 2019 · Penalty $1,250
Resolve - Class - 1
Bc 3313.1 failure to properly handle and store flammable and combustible mixtures,compressed gases. at time of inspection i found oxygen,andacetylene canisters stored indoors at level 4. logs did not note hot w
Sep 24, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection on an active jobsite,observed inadequate housekeeping consisting of large amounts material,debris throughout entire site.
Aug 14, 2019
Resolve - Class - 2
Sec. 3301.2 failure to institute a fall protection plan. at time of inspection on an active 5 sty bldg at 5th fl level,observed workers plavcing cmu blocks along the perimeter & around an opening w/an approx 10
Mar 4, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3301.6.1 design-platform. at time of inspection of a 5 sty bldg at 5th fl level observed platforms in elevator shaft beginning on floors 1 through 4 at floor(4)observed a ladder a platform to access the 5
Mar 4, 2019 · Penalty $1,250
Resolve - Class - 1
Sec. 3301.2 failure to maintain/institute safety measures-no 2 means of egress. at time of inspection on a 5 sty bldg at 5th fl level,observed one ladder erected on a platform to access the 5th fl w/no other
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3308.5 failure to maiuntian/institute safety measures-inadequate vertical netting. at time of inspection on an active 5 sty jobsite at 5th fl level observed holes in the vertical netting & unsecured level
Mar 4, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3309.10 roof protection-inadequate. at time of inspection on an active 5 sty site at 5th fl level observed inadequate roof protection at exp#4 for adjacent property. skylight was not protected the mechanic
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection on a 5 sty bldg at 5th fl level observed inadequatehousekeeping from basement level through the 5th fl at basement level
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.6.1 design-pulley system. at time of inspection on a 5 sty bldg at 5th fl level,observed a pulley system at exp#1 of the bldg attached to a beam on the 4th fl. upon request for design drawing for the
Mar 4, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3301.2 failure to maintain safety measures-uncapped rebar. at time of inspection on an active 5 sty bldg at 5th fl level observed uncapped rebar at 5th fl level coming out of cmu wall. workers were observe
Mar 4, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to produce for inspection the daily log that is required by bc 3321.1 item 3.noted:at time of inspection competent person on site,malachi lambus stated there was no daily log book on site.e
Jan 22, 2019
Resolve - Class - 1
Property owner failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1 observed tacuri lewis at a building for which a construction superintendent ss
Jan 22, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1 observed tacuri lewis at a building for whcih a construction superintendent ssm
Jan 22, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc3321.1:observed a worker named alberto de la luz at a bld. site for which a constructio
Jan 22, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc3321.1:observed aworker named alberto de la luz at a bld.site,for which a construction
Jan 22, 2019
Resolve - Class - 1
Bc1704.1.1.failure to file a special inspection statement of responsibility prior to start of work under special inspection requirement.at the time of inspection it was observed that the contractors installed/p
Sep 27, 2018
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at the time of inspection it was observed that the contractors failed to maintain on site the soe reports as required. as per code inspectio
Sep 27, 2018
Resolve - Class - 2
28-104.7.1 nb structural plans are not adequate in that plans are not complete and of sufficient clarity to indicate entire nature&extent ofproposed work. at the time of inspection it was observed that the engi
Sep 27, 2018 · Penalty $620
Resolve - Class - 1
Bc 3304.7 failure to provide at least one safe means of egress from excavation. at the time of inspection it was observed that the contractors failed to have any egress to enter&exit the excavated area. no ladd
Sep 27, 2018 · Penalty $2,530
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection-noviewing panels. at time of inspection of an active job site,i observed that there were no viewing panels provided for job site fence as requ
May 29, 2018
Resolve - Class - 2
Failure to provide approved accepted construction documents at job site at time of inspection-no approved soe plans on job site. at time of inspection of a new 5 sty bldg under construction at excavation stage.
May 29, 2018
Resolve - Class - 2
Construction superintendent fails to perform duties as per rule. the following violating condition were observed on this job site on this date (pmd) stop. work order issued 1)no daily job site logs were provide
May 29, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.16 failure to provide job site monitor report as required. at time of inspection of a new 5 sty bldg under construction at excavation stage,active job site,upon request for the monitor report for the
May 29, 2018 · Penalty $1,250
Resolve - Class - 1
Construction superintendent fails to provide job site logs at time of inspection of a new 5 sty bldg under construction at(excavation)stage active job site,upon request for the construction superintendents dail
May 29, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.9.1 failure to provide information panel at job site fence as required. at time of inspection of a new 5 sty bldg under consrtruction at excavation stage,active job site,i observed that there were no
May 29, 2018 · Penalty $1,250
Resolve - Class - 2
Bc3314/failure to have supported scaffold build to code specification as per 3314.note:at time of inspection i observed supported scaffold in placee without 1)netting secured.2)guardrails missing.3)cross braces
Apr 5, 2017
Resolve - Class - 2
Sec. 3307.6.4.8.1 the underside of sidewalk shed shall be illuminated at all times. noted: at time of inspection 6:30am the underside of thesidewalk shed has no working lights. the underside of the shed is dark
Mar 29, 2017
Resolve - Non-hazardous
Sec.27-301.failure to comply w/area limitations of bldg occupancy classification.noted there exist a one story commercial garage combustiblegroup ii c w/unprotected ceiling wood joist.remedy:protect ceiling woo
Jan 31, 2007 · Penalty $400
Resolve - Non-hazardous
Altered bldg occupied w/o a valid c of o. bldg has converted from an motor vehicle storage to an auto repair shop & permit #301349510 had not been signed off. *insp requests to be present @ hearing.
Dec 5, 2006 · Penalty $180
Resolve - Hazardous
Failure to maintain roof defect are: (1) roof leaks severely through ceiling at various locations. north east, south west. so that rain water inundates floor' approx 2 inches of water settles on garage floor. (
Nov 2, 1995
Resolve - Hazardous
Failure to maintain entire ceiling defects are: (1) office & bath room flooded due to rain water infiltration through roof (2) entire floor inudated by rain water from roof;north; east; south,west. remedy: make
Nov 2, 1995
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2018
- Floors
- 5
- Residential units
- 58
- Building area
- 20,850 ft²
- Lot area
- 8,000 ft²
- Zoning
- C8-2
- Community board
- 308
- Council district
- 36
- Block / lot
- 1203 / 10
- Assessed value
- $3,083,850
- Landmark / historic district
- No
Questions about 1462 Atlantic Avenue
Who owns 1462 Atlantic Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1462 Maya Investors INC..
Does 1462 Atlantic Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 1462 Atlantic Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1462 Atlantic Avenue built?
City records list 2018 as the year it was built.
How many apartments are in 1462 Atlantic Avenue?
It has 58 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.