1235 Pacific Street
Brooklyn, NY 11216BBL 3-01200-0069Map
Owner of record: 1235 Pacific Gardens LLC
1235 Pacific Street is a walk-up apartment building built in 1910 in Brooklyn, 11216. It has 4 residential units across 4 floors. The owner of record is 1235 Pacific Gardens LLC. HPD has recorded 181 housing violations here, most recently on August 31, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 181
- DOB violations
- 2
- ECB violations
- 3
- HPD complaints
- 281
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 181
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective bell return buzzer from building front to north wall in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window stool at 2nd from east at south in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft observed in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective gasket at refrigerator in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at west in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace with new the missing locking assembly in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - ANon-hazardous
Replace with new the missing ceramic floor tiles in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 31, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at vestibule door
Aug 31, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at vestibule door , 2nd story
Aug 26, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of observe evidence of flies in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood tread, 1st tread from bottom at public hall stairs, 3rd story
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from east located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3a, 4th story, 1st apartment from east at south
Aug 26, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood tread, 1st tread from bottom, up at public hall stairs, 3rd story
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 20, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 20, 2026 · Apt 2B
Open — Notice of issuance sent to tenant
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed
ECB violations · 3
- Class - 1
48a,48b,38,32a,51,50a,50b,50c,50d,50e,50f,50g,50h,36. 50a- safety or relief valve frozen hazardous. 50b- flue pipe corroded holes. 50c- fluepipe not properly sealed hazardous fuses. 50d- deck chimney for feasib
Oct 9, 2010
Resolve - Class - 1
51 48ab 38 32a 50abcdefgh 50a-safety or relief valve frozen hazardous 50b-flue pipe corroded holes hazardous fumes 50c-flue pipe hot property sealed to chimney hazardous 50d-check chimney for possible block aye
Oct 9, 2010 · Penalty $1,000
Active - Non-hazardous
Failure to maintain. defect is: window glass on the 1st floor has beenbroken (front elevation). remedy: repair defect.
Oct 19, 2007 · Penalty $180
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 30, 2026 · Apt BLDG
Close - General
Signage missing
Sep 30, 2026 · Apt BLDG
Close - General
Signage missing
Sep 30, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 30, 2026 · Apt BLDG
Close - Electric
No lighting
Sep 30, 2026 · Apt BLDG
Close - Plumbing
Water supply
Aug 25, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Aug 25, 2026 · Apt 3A
Close - General
Ventilation system
Aug 25, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Door/window
Door
Aug 25, 2026 · Apt 3A
Close
Show 40 more ↓
- Door/window
Door frame
Aug 25, 2026 · Apt 3A
Close - Paint/plaster
Wall
Aug 25, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Electric
Power outage
Aug 25, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Water leak
Heavy flow
Aug 25, 2026 · Apt 3A
Close - General
Bell/buzzer/intercom
Aug 25, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 3A
Close - Electric
Wiring
Aug 25, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Aug 25, 2026 · Apt 3A
Close - Plumbing
Toilet
Aug 25, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 3A
Close - Paint/plaster
Window/frame
Aug 25, 2026 · Apt 3A
Close - Door/window
Door frame
Aug 25, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Aug 25, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Aug 25, 2026 · Apt 3A
Close - Appliance
Refrigerator
Aug 25, 2026 · Apt 3A
Close - Water leak
Heavy flow
Aug 25, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Plumbing
Radiator
Aug 25, 2026 · Apt 3A
Close - Door/window
Window pane
Aug 25, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 3A
Close - Safety
Carbon monoxide detector
Aug 25, 2026 · Apt 3A
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 21, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 20, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 20, 2026 · Apt 3A
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 3A
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Aug 20, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 3A
Close - Flooring/stairs
Floor
Aug 20, 2026 · Apt 3A
Close - Electric
Wiring
Aug 20, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1910
- Floors
- 4
- Residential units
- 4
- Building area
- 5,201 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6A
- Community board
- 308
- Council district
- 36
- Block / lot
- 1200 / 69
- Assessed value
- $643,950
- Landmark / historic district
- No
HPD registration #325173, last renewed Nov 17, 2025.
Questions about 1235 Pacific Street
Who owns 1235 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is 1235 Pacific Gardens LLC.
Does 1235 Pacific Street have violations?
Yes. NYC HPD has recorded 181 housing violations at this property.
Is 1235 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1235 Pacific Street built?
City records list 1910 as the year it was built.
How many apartments are in 1235 Pacific Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.