roofy

423 Lincoln Place

Brooklyn, NY 11238BBL 3-01177-0047Map

Owner of record: John's Cannabis LLC

423 Lincoln Place is a walk-up apartment building built in 1907 in Brooklyn, 11238. It has 6 residential units across 3 floors. The owner of record is John's Cannabis LLC. HPD has recorded 114 housing violations here, most recently on May 5, 2026. 48 of the 50 most recent violations are still open.

HPD violations
114
DOB violations
63
ECB violations
19
HPD complaints
63

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 114

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of trash and construction material at public hall, 3rd story

    Feb 20, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the 2nd room from north located at apt 8, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 8

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the 2nd room from north located at apt 8, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 8

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls in the entire apartment located at apt 8, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 8

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Feb 20, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 8

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature at all hot water fixtures in the entire apartment located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above ceiling in the 1st room from north located at apt 9, 3rd story, 1st apartment from west at north

    Feb 20, 2026 · Apt 9

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder lock at bulkhead door at 1st public hall bulkhead from north, 3rd story

    Feb 20, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of washing machine and household items at 1st public hall bulkhead from north, 3rd story

    Feb 20, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Feb 20, 2026

    Open — Nov sent out
  • B

    Provide an acceptable heavy duty lock at vestibule door at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing hook and eye at building entrance door

    Feb 20, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Feb 20, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 20, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of a unacceptable electromagnetic locking device at vestibule door at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing hook and eye at vestibule door at public hall, 1st story

    Feb 20, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2025

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2023

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 23, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 14, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 25, 2022

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 25, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 9, 2021

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2021

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Jul 9, 2020

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 9, 2020

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jul 9, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 9, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 9, 2020

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 9, 2020

    Open — Nov sent out
  • C

    Properly repair the broken or defective lockset at building entrance door

    Jan 30, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Jan 28, 2020

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at 1st story public hall

    Jan 28, 2020

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 28, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jan 28, 2020

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at 1st story public hall

    Jan 28, 2020

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jan 28, 2020

    Open — Nov sent out

DOB building violations · 63

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 6, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Elevator elevatorrequired

    Cease use

    Jan 22, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 4, 2019

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - active

ECB violations · 19

  • Class - 1

    Repair and restore to service.

    Mar 25, 2020 · Penalty $6,250

    Active
  • Class - 2

    As per d.o.b. records the 9 gas boilers installed on job#300726392-were installed under an improper permit. they are all unregistered boilers., maintain boiler; obtain a boiler permit for their istallation & su

    Jul 11, 2019 · Penalty $3,125

    Active
  • Class - 1

    In apartment 1 the teledyne laars endurance boiler is not properly vented,boiler room is not fire rated,lack of fresh air& is inoperative, maintain boiler; cease use issued;do not operate boiler until all hazar

    Jun 14, 2019 · Penalty $6,250

    Active
  • Class - 1

    Fgc 408.2 misc vio.observed on 12/30/15 @ 3pm @ rear yard-commercial tenant gas line installed future gas connects on line to gas unit.rem comply w/ nov

    Dec 30, 2015 · Penalty $1,600

    Active
  • Class - 1

    Work w/o a permit. noted: at roof level erected metal perimeter wall,approx 5.5' tall. at roof bulkhead w/single room(occupied). remedy: obtain permit.

    Dec 30, 2015 · Penalty $1,600

    Active
  • Class - 1

    Occupancy contrary to that allowed by the c of o or bldg dept records.noted: as per c of o #300726392f,cellar is to be used as storage & medical offices. it is currently being used as a tutoring facility for

    Dec 30, 2015 · Penalty $2,400

    Active
  • Class - 2

    Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. also observed 2 head emergency lights not working. expose wiring in ground floor hallway outlets hangin

    Dec 30, 2015

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.exhaust vents for boilers discharge no closer than 10ft from bldg opening as per rs-2.2.1.4 & mc.discharges @ tenant windows.-outside space.rem comply w/ code

    Dec 30, 2015 · Penalty $800

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner.installation of plumbing materials/equipment pc pc102.3 & 27-902 observed on 12/30/15 @ 3pm in basement commercial space-handicap bath missing protective cover.

    Dec 30, 2015 · Penalty $500

    Active
  • Class - 2

    Electrical work w/o permit. observed at 2pm boilers installed in apt 1,2 & 4. no application on file for new boilers. remedy: obtain permit.

    Dec 30, 2015 · Penalty $800

    Active
Show 9 more ↓
  • Class - 2

    Fail to have new or altered plumbing system tested.install washing machine & electric dryer w/ vent,waste,water supplies-no filings for inspections work on top fl bulk head to roof area hallway.rem perform insp

    Dec 30, 2015 · Penalty $500

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner.service equipment boiler.observed 12/30/15 @ 330pm in apts boiler room/closet not having asource of fresh air to room regl.rem maintain boiler

    Dec 30, 2015 · Penalty $1,000

    Active
  • Class - 1

    Failure to maintain bldg walls or appurtenances. noted: at exp#3,fire escape at top floor has single scaffold platform hanging over fire escape 50% approx. rear fence (exp#3) are padlocked leady from fire escap

    Dec 30, 2015 · Penalty $1,000

    Active
  • Non-hazardous

    Failure to provide approved plans at time of inspection.remedy:provide plans

    May 31, 2001 · Penalty $250

    Resolve
  • Hazardous

    Failure to maintain note:at west side of bldg.varied construction debris scattered throughout.approximately 20 yards of gravel(piled) 20 yards of sand piled. over 100'of cast iron rusted drain pipes mounds of b

    Feb 3, 2001

    Resolve
  • Non-hazardous

    Work without permit. work noted: at front of premises a 8' high plywood construction fence erected approximately 30' accross st (bldg0 frontage. remedy: obtain permit or remove construction fence.

    Jan 23, 2001

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation.protection not provided:no shoring and under pinning under sidewalk in front of house.remedy:stop all work immediately except to provide protection.

    Oct 24, 2000

    Resolve
  • Hazardous

    Work without a permit work noted:partitions being erected on 1st floor excavation work being done in front of house 10"deep x 5"wide.no shoring on side of excavation.remedy:obtain permits.

    Oct 23, 2000

    Resolve
  • Non-hazardous

    Work contrary to approved plan #3007263925 exp 2/5/99. installation ofsteel girders & spandrels all fls. no structural steel details on planopen trench (5' deep approx) on east, west & north exposures for found

    Jun 4, 1999 · Penalty $500

    Resolve

Complaints

  • Electric

    Power outage

    Feb 20, 2026 · Apt 8

    Close
  • Unsanitary condition

    Mold

    Feb 20, 2026 · Apt 9

    Close
  • Water leak

    Slow leak

    Feb 20, 2026 · Apt 9

    Close
  • Electric

    Power outage

    Feb 20, 2026 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2026 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2026 · Apt 8

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2026 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Feb 16, 2026 · Apt 9

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 9, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    May 2, 2024 · Apt 9

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Mar 31, 2023 · Apt 7

    Close
  • Heat/hot water

    Apartment only

    Mar 31, 2023 · Apt 7

    Close
  • Electric

    No lighting

    Mar 20, 2020 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 9, 2020 · Apt BLDG

    Close
  • Door/window

    Door

    Jan 27, 2020 · Apt BLDG

    Close
  • Electric

    Power outage

    Jan 17, 2020 · Apt 6

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2020 · Apt 6

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2020 · Apt 6

    Close
  • Plumbing

    Water supply

    Jan 1, 2020 · Apt 6

    Close
  • Electric

    No lighting

    Jan 1, 2020 · Apt 6

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2020 · Apt 6

    Close
  • General

    Cooking gas

    Jun 13, 2019 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jun 13, 2019 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Jan 17, 2017 · Apt 9

    Close
  • Water leak

    Damp spot

    Jan 17, 2017 · Apt 9

    Close
  • Electric

    Wiring

    Jan 17, 2017 · Apt 9

    Close
  • Water leak

    Slow leak

    Jan 17, 2017 · Apt APT9

    Close
  • Unsanitary condition

    Mold

    Jan 17, 2017 · Apt APT9

    Close
  • Water leak

    Slow leak

    Dec 30, 2016 · Apt 9

    Close
  • Water leak

    Slow leak

    Dec 30, 2016 · Apt 9

    Close
  • Unsanitary condition

    Mold

    Jul 14, 2016 · Apt 9

    Close
  • Unsanitary condition

    Mold

    Jul 14, 2016 · Apt 9

    Close
  • Safety

    Carbon monoxide detector

    Jul 14, 2016 · Apt 9

    Close
  • Plumbing

    Toilet

    Aug 11, 2015 · Apt 7

    Close
  • Plumbing

    Toilet

    Aug 11, 2015 · Apt 7

    Close
  • Plumbing

    Toilet

    Aug 11, 2015 · Apt 7

    Close
  • Plumbing

    Toilet

    Aug 11, 2015 · Apt 7

    Close
  • Paint/plaster

    Ceiling

    Apr 12, 2015 · Apt 9

    Close
  • Paint/plaster

    Ceiling

    Apr 12, 2015 · Apt 9

    Close
  • Plumbing

    Water supply

    Apr 12, 2015 · Apt 9

    Close
  • Water leak

    Slow leak

    Apr 12, 2015 · Apt 9

    Close
  • Water leak

    Slow leak

    Apr 12, 2015 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Apr 12, 2015 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jun 11, 2014 · Apt 9

    Close
  • Electric

    Power outage

    Jun 11, 2014 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Jun 11, 2014 · Apt 9

    Close
  • Electric

    Outlet/switch

    Apr 21, 2014 · Apt 9

    Close
  • Paint/plaster

    Ceiling

    Apr 21, 2014 · Apt 9

    Close
  • Water leak

    Slow leak

    Apr 21, 2014 · Apt 9

    Close
  • Heat/hot water

    Apartment only

    Apr 21, 2014 · Apt 9

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1907
Floors
3
Residential units
6
Building area
5,799 ft²
Lot area
2,850 ft²
Zoning
R7A
Community board
308
Council district
35
Block / lot
1177 / 47
Assessed value
$738,900
Landmark / historic district
No

HPD registration #355148, last renewed Aug 13, 2019.

Questions about 423 Lincoln Place

Who owns 423 Lincoln Place?

The owner of record in NYC Department of City Planning PLUTO data is John's Cannabis LLC.

Does 423 Lincoln Place have violations?

Yes. NYC HPD has recorded 114 housing violations at this property.

Is 423 Lincoln Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 423 Lincoln Place built?

City records list 1907 as the year it was built.

How many apartments are in 423 Lincoln Place?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.