roofy

632 Sterling Place

Brooklyn, NY 11238BBL 3-01175-0047Map

Owner of record: 632 Sterling LLC

632 Sterling Place is a walk-up apartment building built in 1906 in Brooklyn, 11238. It has 10 residential units across 3 floors. The owner of record is 632 Sterling LLC. HPD has recorded 70 housing violations here, most recently on June 11, 2025. 1 of the 50 most recent violations are still open.

HPD violations
70
DOB violations
15
ECB violations
18
HPD complaints
37

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 11, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 70

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 11, 2025

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3c, 3rd story, 1st apartment from west at north

    Aug 5, 2023 · Apt 3C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north

    Aug 5, 2023 · Apt 3C

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories rear stack.

    Dec 3, 2020

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold articles 3rd story balcony rear stack.

    Dec 3, 2020

    Closed — Violation dismissed
  • B

    Provide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this department cellar.

    Nov 10, 2020

    Closed — Violation dismissed
  • B

    The premises formerly a vacant building are now occupied by other than a caretaker without obtaining a certificate of occupancy north apartment. located at apt 2a, 2nd story

    Nov 10, 2020 · Apt 2A

    Closed — Violation closed
  • B

    The premises formerly a vacant building are now occupied by other than a caretaker without obtaining a certificate of occupancy south east apartment. located at apt 1d, 1st story

    Nov 10, 2020 · Apt 1D

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story

    Nov 10, 2020

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor improper frame , 1st story

    Nov 10, 2020

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Paint or post a sign indicating floors public hall stairs. , 4th story

    Nov 10, 2020

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective brick and mortar joints from coping to 2nd to story lintel approx. 50 sq.ft. at south wall

    Aug 6, 2020

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors at boiler room at cellar

    Aug 6, 2020

    Closed — Violation dismissed
  • B

    Seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department .. at cellar

    Aug 6, 2020

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective brick and mortar joints at south building wall , 2nd story

    Aug 6, 2020

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors leading to roof from upper level of the duplex apartment in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from south at west

    Aug 6, 2020 · Apt 3C

    Closed — Violation closed
  • A

    Refit the door leading to roof from upper level of the duplex apartment in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from south at west

    Aug 6, 2020 · Apt 3C

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors leading to rear yard from kitchen located at apt 2b, 2nd story, apartment at south

    Aug 6, 2020 · Apt 2B

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jul 30, 2020

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors at builhead roof

    Jul 30, 2020

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jul 30, 2020

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold articles at public hall, 1st story

    Jul 30, 2020

    Open — Not complied with
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 30, 2020

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 30, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 30, 2020

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 30, 2020

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 29, 2017

    Closed — Violation dismissed
  • I

    Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since august . 16 . 2017

    Aug 16, 2017

    Closed — Violation closed
  • I

    The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.

    Aug 23, 2016

    Closed — Violation closed
  • C

    Replace with new the missing fire stopping material removed at all ceilings and all walls at all apartments at second and third story

    Aug 10, 2016

    Closed — Violation dismissed
  • C

    Replace with new the missing stairs from the second to third story at public hall stairs

    Aug 10, 2016

    Closed — Violation dismissed
  • B

    § 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling ...

    Aug 10, 2016

    Closed — Violation dismissed
  • C

    Provide temporary seal up of all accessible openings in the entire building

    Aug 10, 2016

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and walls. approx. 30 sq.ft. in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant sheetrock ceiling at cellar throughout

    Jul 27, 2016

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, apartment at east

    Jul 27, 2016 · Apt 1L

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tile at walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jul 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris at rear yard

    Jul 27, 2016

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris at cellar

    Jul 27, 2016

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ,, in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Jun 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    Jun 27, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... all walls and ceiling...approximately 4 sq. ft. in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    May 10, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl tile floor covering in the private hallway located at apt 1r, 1st story, 2nd apartment from east at south

    May 10, 2016 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door at north in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south

    May 10, 2016 · Apt 1R

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south

    May 10, 2016 · Apt 1R

    Closed — Violation dismissed

DOB building violations · 15

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Construction other optional

    Boro. comm. swo order/stop all work except to make site safe

    Mar 18, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2019

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately make site safe only contact borough comm office at 718 802-3677 for info

    Oct 10, 2018

    Dob violation - dismissed
  • Construction other optional

    Stop all work except make site safe contact dept. of buildings 718 802 -3677

    May 17, 2018

    Dob violation - dismissed
  • Construction other optional

    The borough comm. has issued and intent to revoke approval permit for appl3321110759./remedy; strop all work contact commissioners offic e

    Jan 10, 2017

    Dob violation - dismissed
  • Construction other optional

    Fm bldg during construct/alt of bldg,several load bearing timber relieving walls were removed,w/inadequate temp shoring in place.remedy owner immed engage nyspe prof engr eval cond&prep design/engineer report&make recommendation for reconstruct of stable relieve walls to prov adequate support at 2nd,3rd&roof level

    Jan 9, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
Show 5 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations · 18

  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. attime of inspection at an active alteration 4 story construction site,iobserved excessive garbage/debris on the 4th fl. there was garbage/deb

    Aug 2, 2019

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35315350y issued on 08/22/18,and to file a certificate of pursuant to 28-201.1 and 1rncy 102-01(d)(2).an acceptible certificate has

    Jul 10, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work w/o a permit.@time of inspection @am active altercation 2 sty construction site, i observed workers were framing vertical extension on the roof with an work permit that expired on 04-21-2019.according to

    Apr 30, 2019

    Resolve
  • Class - 2

    Temporary const equipment on site- expired permit-fence. @time of inspection @an active 4 sty alteration const site, i observed work was in progress and fence permit was expired on 04-23-19 according to the

    Apr 30, 2019

    Resolve
  • Class - 2

    Work does not conform to approved constuction documents or plans. noted: job#321100759 exp 4-21-19. approved plans do not show metal'c'joistgirder between 1st & 2nd fl. also not shown wood joist replacement at

    Aug 22, 2018 · Penalty $1,250

    Resolve
  • Class - 3

    Failure to maintain bldg in a code compliant manner. observed excessive construction debris & garbage bags located inside construction fencein front of property. also observed missing panel of construction fenc

    Oct 13, 2017 · Penalty $100

    Resolve
  • Class - 1

    Unsafe storage of combustible material & equipment. noted: piles of wood stored at cellar level adjacent to boiler room. wood is new & in closeproximity to the boiler while all fire stopping material has been

    Aug 10, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: excessive dust,nylon,debris,in hallways defective door at 1st fl. defective staircase at 2nd & 3rd flrs. defective joists at 1st fl to 2nd fl apt 2l,def

    Aug 10, 2016 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner: no fire stopping per bc712.3;27-345. fire stopping material has been removed from cellar,1st fl joists,2nd fl walls,ceilings,3rd fl walls,ceilings w/open floor

    Aug 10, 2016 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. noted: at 2nd & 3rd floors,piles of debris including bags w/latte plaster,timber,metal,radiators,dirt pipes,electrical lines,plumbing gas line

    Aug 10, 2016 · Penalty $800

    Resolve
Show 8 more ↓
  • Class - 1

    Work w/o a permit.@the time of my inspection @9:45am on 8/10/16 @the above address i observed on safety sweep removal plumbing fixtures,removal of sanitary stacks &toilet lead bend all on the second &third flrs

    Aug 10, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to carry out demolition operations as required by section. noted: at exp#3 2x4's were removed through upper floor window & being piled up in rear yard. proper shoring was not installed prior to removing

    Aug 10, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.@the time of my inspection @9:45am on 8/10/16 @the above address i observed a waste line leaking water into basement &flooding which is prohibited &not code co

    Aug 10, 2016 · Penalty $250

    Resolve
  • Class - 1

    Electrical work w/o a permit. throughout the entire bldg except the 1st fl. observed at 8am demo of electrical wires panel boxes switches outlets on the 3rd,2nd & basement area. remedy: obtain permit.

    Aug 10, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: at 1st,2nd,3rd fl removed relieving walls,stairwalls at several locations w/no shoring put in place to maintain load path.

    Aug 10, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to ground electrical system from the electrical service to the water pipe there is no bonding conductor. therefore the bldg is not grounded. remedy: provide grounding.

    Aug 10, 2016 · Penalty $4,800

    Resolve
  • Class - 2

    Sec. 3303.10 failure to carry out construction work in accordance w/the required tenant protection plan in a bldg w/at least one occupied dwelling unit. at the time of inspection it was observed that during dem

    Jul 25, 2016

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operation. at the time of inspection it was observed that there was construction debris all over the place w/o proper storage or disposal.

    Jul 25, 2016 · Penalty $5,000

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 6, 2025 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Apr 29, 2023 · Apt 3C

    Close
  • Water leak

    Slow leak

    Dec 4, 2020 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Jul 25, 2016 · Apt 1R

    Close
  • Plumbing

    Toilet

    May 5, 2016 · Apt 1R

    Close
  • Plumbing

    Toilet

    May 5, 2016 · Apt 1R

    Close
  • Door/window

    Door

    May 5, 2016 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    May 5, 2016 · Apt 1R

    Close
  • Paint/plaster

    Wall

    May 5, 2016 · Apt 1R

    Close
  • Flooring/stairs

    Floor

    May 5, 2016 · Apt 1R

    Close
Show 27 more ↓
  • Unsanitary condition

    Mold

    May 5, 2016 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    May 2, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2016 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2016 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2016 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2016 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2016 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2016 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2016 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2016 · Apt 1N

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2016 · Apt 1R

    Close
  • Water leak

    Slow leak

    Oct 14, 2015 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Oct 14, 2015 · Apt 1R

    Close
  • Plumbing

    Toilet

    Oct 14, 2015 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2015 · Apt ALL

    Close
  • Unsanitary condition

    Pests

    Aug 4, 2015 · Apt ALL

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 1, 2015 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Sep 8, 2012 · Apt 1R

    Close
  • General

    Mold

    Sep 8, 2012 · Apt 1R

    Close
  • General

    Mold

    Oct 3, 2007 · Apt 1R

    Close
  • General

    Mold

    Oct 3, 2007 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1906
Floors
3
Residential units
10
Building area
7,217 ft²
Lot area
3,537 ft²
Zoning
R6B
Community board
308
Council district
35
Block / lot
1175 / 47
Assessed value
$1,072,350
Landmark / historic district
No

HPD registration #313798, last renewed Jul 22, 2026.

Questions about 632 Sterling Place

Who owns 632 Sterling Place?

The owner of record in NYC Department of City Planning PLUTO data is 632 Sterling LLC.

Does 632 Sterling Place have violations?

Yes. NYC HPD has recorded 70 housing violations at this property.

Is 632 Sterling Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 632 Sterling Place built?

City records list 1906 as the year it was built.

How many apartments are in 632 Sterling Place?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.