632 Sterling Place
Brooklyn, NY 11238BBL 3-01175-0047Map
Owner of record: 632 Sterling LLC
632 Sterling Place is a walk-up apartment building built in 1906 in Brooklyn, 11238. It has 10 residential units across 3 floors. The owner of record is 632 Sterling LLC. HPD has recorded 70 housing violations here, most recently on June 11, 2025. 1 of the 50 most recent violations are still open.
- HPD violations
- 70
- DOB violations
- 15
- ECB violations
- 18
- HPD complaints
- 37
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 70
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3c, 3rd story, 1st apartment from west at north
Aug 5, 2023 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north
Aug 5, 2023 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories rear stack.
Dec 3, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold articles 3rd story balcony rear stack.
Dec 3, 2020
Closed — Violation dismissed - BHazardous
Provide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this department cellar.
Nov 10, 2020
Closed — Violation dismissed - BHazardous
The premises formerly a vacant building are now occupied by other than a caretaker without obtaining a certificate of occupancy north apartment. located at apt 2a, 2nd story
Nov 10, 2020 · Apt 2A
Closed — Violation closed - BHazardous
The premises formerly a vacant building are now occupied by other than a caretaker without obtaining a certificate of occupancy south east apartment. located at apt 1d, 1st story
Nov 10, 2020 · Apt 1D
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Nov 10, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor improper frame , 1st story
Nov 10, 2020
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint or post a sign indicating floors public hall stairs. , 4th story
Nov 10, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective brick and mortar joints from coping to 2nd to story lintel approx. 50 sq.ft. at south wall
Aug 6, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at boiler room at cellar
Aug 6, 2020
Closed — Violation dismissed - BHazardous
Seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department .. at cellar
Aug 6, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective brick and mortar joints at south building wall , 2nd story
Aug 6, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors leading to roof from upper level of the duplex apartment in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from south at west
Aug 6, 2020 · Apt 3C
Closed — Violation closed - ANon-hazardous
Refit the door leading to roof from upper level of the duplex apartment in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from south at west
Aug 6, 2020 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors leading to rear yard from kitchen located at apt 2b, 2nd story, apartment at south
Aug 6, 2020 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 30, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at builhead roof
Jul 30, 2020
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 30, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold articles at public hall, 1st story
Jul 30, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 30, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 30, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 30, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 30, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2017
Closed — Violation dismissed - IInformation / order
Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since august . 16 . 2017
Aug 16, 2017
Closed — Violation closed - IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.
Aug 23, 2016
Closed — Violation closed - CImmediately hazardous
Replace with new the missing fire stopping material removed at all ceilings and all walls at all apartments at second and third story
Aug 10, 2016
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing stairs from the second to third story at public hall stairs
Aug 10, 2016
Closed — Violation dismissed - BHazardous
§ 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling ...
Aug 10, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide temporary seal up of all accessible openings in the entire building
Aug 10, 2016
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and walls. approx. 30 sq.ft. in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant sheetrock ceiling at cellar throughout
Jul 27, 2016
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, apartment at east
Jul 27, 2016 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Jul 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris at rear yard
Jul 27, 2016
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction debris at cellar
Jul 27, 2016
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ,, in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Jun 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Jun 27, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... all walls and ceiling...approximately 4 sq. ft. in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
May 10, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile floor covering in the private hallway located at apt 1r, 1st story, 2nd apartment from east at south
May 10, 2016 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door at north in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south
May 10, 2016 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
May 10, 2016 · Apt 1R
Closed — Violation dismissed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Boro. comm. swo order/stop all work except to make site safe
Mar 18, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Construction other optional
Stop all work immediately make site safe only contact borough comm office at 718 802-3677 for info
Oct 10, 2018
Dob violation - dismissed - Construction other optional
Stop all work except make site safe contact dept. of buildings 718 802 -3677
May 17, 2018
Dob violation - dismissed - Construction other optional
The borough comm. has issued and intent to revoke approval permit for appl3321110759./remedy; strop all work contact commissioners offic e
Jan 10, 2017
Dob violation - dismissed - Construction other optional
Fm bldg during construct/alt of bldg,several load bearing timber relieving walls were removed,w/inadequate temp shoring in place.remedy owner immed engage nyspe prof engr eval cond&prep design/engineer report&make recommendation for reconstruct of stable relieve walls to prov adequate support at 2nd,3rd&roof level
Jan 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2016
Dob violation - dismissed
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 18
- Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection at an active alteration 4 story construction site,iobserved excessive garbage/debris on the 4th fl. there was garbage/deb
Aug 2, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35315350y issued on 08/22/18,and to file a certificate of pursuant to 28-201.1 and 1rncy 102-01(d)(2).an acceptible certificate has
Jul 10, 2019 · Penalty $625
Resolve - Class - 1
Work w/o a permit.@time of inspection @am active altercation 2 sty construction site, i observed workers were framing vertical extension on the roof with an work permit that expired on 04-21-2019.according to
Apr 30, 2019
Resolve - Class - 2
Temporary const equipment on site- expired permit-fence. @time of inspection @an active 4 sty alteration const site, i observed work was in progress and fence permit was expired on 04-23-19 according to the
Apr 30, 2019
Resolve - Class - 2
Work does not conform to approved constuction documents or plans. noted: job#321100759 exp 4-21-19. approved plans do not show metal'c'joistgirder between 1st & 2nd fl. also not shown wood joist replacement at
Aug 22, 2018 · Penalty $1,250
Resolve - Class - 3
Failure to maintain bldg in a code compliant manner. observed excessive construction debris & garbage bags located inside construction fencein front of property. also observed missing panel of construction fenc
Oct 13, 2017 · Penalty $100
Resolve - Class - 1
Unsafe storage of combustible material & equipment. noted: piles of wood stored at cellar level adjacent to boiler room. wood is new & in closeproximity to the boiler while all fire stopping material has been
Aug 10, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: excessive dust,nylon,debris,in hallways defective door at 1st fl. defective staircase at 2nd & 3rd flrs. defective joists at 1st fl to 2nd fl apt 2l,def
Aug 10, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: no fire stopping per bc712.3;27-345. fire stopping material has been removed from cellar,1st fl joists,2nd fl walls,ceilings,3rd fl walls,ceilings w/open floor
Aug 10, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. noted: at 2nd & 3rd floors,piles of debris including bags w/latte plaster,timber,metal,radiators,dirt pipes,electrical lines,plumbing gas line
Aug 10, 2016 · Penalty $800
Resolve
Show 8 more ↓
- Class - 1
Work w/o a permit.@the time of my inspection @9:45am on 8/10/16 @the above address i observed on safety sweep removal plumbing fixtures,removal of sanitary stacks &toilet lead bend all on the second &third flrs
Aug 10, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to carry out demolition operations as required by section. noted: at exp#3 2x4's were removed through upper floor window & being piled up in rear yard. proper shoring was not installed prior to removing
Aug 10, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.@the time of my inspection @9:45am on 8/10/16 @the above address i observed a waste line leaking water into basement &flooding which is prohibited ¬ code co
Aug 10, 2016 · Penalty $250
Resolve - Class - 1
Electrical work w/o a permit. throughout the entire bldg except the 1st fl. observed at 8am demo of electrical wires panel boxes switches outlets on the 3rd,2nd & basement area. remedy: obtain permit.
Aug 10, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: at 1st,2nd,3rd fl removed relieving walls,stairwalls at several locations w/no shoring put in place to maintain load path.
Aug 10, 2016 · Penalty $10,000
Resolve - Class - 1
Failure to ground electrical system from the electrical service to the water pipe there is no bonding conductor. therefore the bldg is not grounded. remedy: provide grounding.
Aug 10, 2016 · Penalty $4,800
Resolve - Class - 2
Sec. 3303.10 failure to carry out construction work in accordance w/the required tenant protection plan in a bldg w/at least one occupied dwelling unit. at the time of inspection it was observed that during dem
Jul 25, 2016
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation. at the time of inspection it was observed that there was construction debris all over the place w/o proper storage or disposal.
Jul 25, 2016 · Penalty $5,000
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 6, 2025 · Apt 1A
Close - Water leak
Heavy flow
Apr 29, 2023 · Apt 3C
Close - Water leak
Slow leak
Dec 4, 2020 · Apt 1A
Close - Unsanitary condition
Mold
Jul 25, 2016 · Apt 1R
Close - Plumbing
Toilet
May 5, 2016 · Apt 1R
Close - Plumbing
Toilet
May 5, 2016 · Apt 1R
Close - Door/window
Door
May 5, 2016 · Apt 1R
Close - Flooring/stairs
Floor
May 5, 2016 · Apt 1R
Close - Paint/plaster
Wall
May 5, 2016 · Apt 1R
Close - Flooring/stairs
Floor
May 5, 2016 · Apt 1R
Close
Show 27 more ↓
- Unsanitary condition
Mold
May 5, 2016 · Apt 1R
Close - Heat/hot water
Apartment only
May 2, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Apr 6, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Apr 5, 2016 · Apt 1L
Close - Heat/hot water
Apartment only
Mar 28, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Mar 19, 2016 · Apt 1R
Close - Heat/hot water
Apartment only
Mar 4, 2016 · Apt 3R
Close - Heat/hot water
Entire building
Mar 3, 2016 · Apt 1L
Close - Heat/hot water
Entire building
Mar 3, 2016 · Apt 3R
Close - Heat/hot water
Entire building
Feb 27, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Feb 18, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Feb 12, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2016 · Apt 1L
Close - Heat/hot water
Entire building
Feb 8, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Feb 8, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2016 · Apt 1N
Close - Heat/hot water
Entire building
Feb 2, 2016 · Apt 1R
Close - Water leak
Slow leak
Oct 14, 2015 · Apt 1R
Close - Plumbing
Basin/sink
Oct 14, 2015 · Apt 1R
Close - Plumbing
Toilet
Oct 14, 2015 · Apt 1R
Close - Unsanitary condition
Pests
Aug 4, 2015 · Apt ALL
Close - Unsanitary condition
Pests
Aug 4, 2015 · Apt ALL
Close - Unsanitary condition
Garbage/recycling storage
Jul 1, 2015 · Apt BLDG
Close - Plumbing
Water-leaks
Sep 8, 2012 · Apt 1R
Close - General
Mold
Sep 8, 2012 · Apt 1R
Close - General
Mold
Oct 3, 2007 · Apt 1R
Close - General
Mold
Oct 3, 2007 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1906
- Floors
- 3
- Residential units
- 10
- Building area
- 7,217 ft²
- Lot area
- 3,537 ft²
- Zoning
- R6B
- Community board
- 308
- Council district
- 35
- Block / lot
- 1175 / 47
- Assessed value
- $1,072,350
- Landmark / historic district
- No
HPD registration #313798, last renewed Jul 22, 2026.
Questions about 632 Sterling Place
Who owns 632 Sterling Place?
The owner of record in NYC Department of City Planning PLUTO data is 632 Sterling LLC.
Does 632 Sterling Place have violations?
Yes. NYC HPD has recorded 70 housing violations at this property.
Is 632 Sterling Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 632 Sterling Place built?
City records list 1906 as the year it was built.
How many apartments are in 632 Sterling Place?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.