541 8 Street
Brooklyn, NY 11215BBL 3-01089-0056Map
Owner of record: 541 Eighth Street Owners Corp
541 8 Street is a walk-up apartment building built in 1905 in Brooklyn, 11215. It has 8 residential units across 4 floors. The owner of record is 541 Eighth Street Owners Corp. HPD has recorded 79 housing violations here, most recently on April 30, 2026. 8 of the 50 most recent violations are still open.
- HPD violations
- 79
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 48
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 18, 2022
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 6th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door from east at south wall, 1st door frame from east at south wall, 1st door frame from south at west wall, south wall, west wall, 1st window frame from west at north wall in the 6th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall in the 4th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the 7th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door frame casing in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 6th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 7th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, baseboard at east wall, 1st closet from north at east wall door, 1st door frame from north at east wall, 1st door frame from west at north wall, 1st door from south at west wall, 1st door frame from south at west wall in the 7th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 7th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 6th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 4th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mortise lock at west door in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Sep 24, 2014 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, south wall, west wall in the 6th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 2, 2014 · Apt 4R
Closed — Violation closed - ANon-hazardous
Replace with new the missing electric switch cover at west wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Nov 1, 2013 · Apt 4R
Closed — Violation closed - ANon-hazardous
Replace with new the missing door knob in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Nov 1, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower sash window in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Aug 15, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st closet from north at east wall wall, 1st door from north at east wall in the 7th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) east wall in the 5th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the private hallway located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) east wall in the 1st room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - ANon-hazardous
Replace with new the missing wood casing at inside of 1st door jamb from east in the entrance located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Properly secure the loose electric light fixture at ceiling in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Properly secure the loose electric light fixture at ceiling in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Replace with new the missing electric outlet cover at west wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 6; in the entire apartment located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at 3rd window from west at north wall in the 1st room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balances at window in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Replace with new the missing bath tub in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Replace with new the missing sink and base cabinet in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - BHazardous
Replace with new the missing wash basin in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 5th room from north located at apt 4r, 4th story, 2nd apartment from west at north
Jun 28, 2013 · Apt 4R
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 2
- Class - 1
Electrical work without a permit. atoi observed new electrical work has been performed, hanging bx cables throughout ceiling and walls of apt 4r without dob approved permit for the scope of work., obtain permit
Aug 12, 2026 · Penalty $2,500
Active - Non-hazardous
50a boiler room not sealed holes in walls & ceiling.
Aug 21, 2006 · Penalty $180
Resolve
Complaints
- Paint/plaster
Radiator
Sep 22, 2014 · Apt 4R
Close - Door/window
Door
Sep 22, 2014 · Apt 4R
Close - General
Cabinet
Sep 22, 2014 · Apt 4R
Close - Paint/plaster
Wall
Sep 22, 2014 · Apt 4R
Close - Plumbing
Radiator
Oct 28, 2013 · Apt 4R
Close - Plumbing
Radiator
Oct 28, 2013 · Apt 4R
Close - Electric
Wiring
Oct 28, 2013 · Apt 4R
Close - Paint/plaster
Ceiling
Oct 28, 2013 · Apt 4R
Close - Paint/plaster
Wall
Jun 25, 2013 · Apt 4R
Close - Plumbing
Water supply
Jun 25, 2013 · Apt 4R
Close
Show 38 more ↓
- Plumbing
Water supply
Jun 25, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Jun 25, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Jun 25, 2013 · Apt 4R
Close - Plumbing
Shower-stall
Jun 25, 2013 · Apt 4R
Close - Plumbing
Bathtub/shower
Jun 19, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Jun 19, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Jun 19, 2013 · Apt 4R
Close - Plumbing
Bathtub/shower
Apr 8, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Apr 8, 2013 · Apt 4R
Close - Nonconst
Smoke detector
Apr 8, 2013 · Apt 4R
Close - Electric
Lighting
Apr 8, 2013 · Apt 4R
Close - Electric
Wiring
Apr 8, 2013 · Apt 4R
Close - General
Floor
Apr 8, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Apr 8, 2013 · Apt 4R
Close - Paint/plaster
Wall
Apr 8, 2013 · Apt 4R
Close - Plumbing
Toilet
Apr 8, 2013 · Apt 4R
Close - Paint/plaster
Wall
Apr 8, 2013 · Apt 4R
Close - Electric
Wiring
Apr 8, 2013 · Apt 4R
Close - Electric
Lighting
Apr 8, 2013 · Apt 4R
Close - Plumbing
Water-leaks
Apr 8, 2013 · Apt 4R
Close - Plumbing
Water-leaks
Apr 8, 2013 · Apt 4R
Close - Paint/plaster
Ceiling
Apr 2, 2013 · Apt 4R
Close - Paint/plaster
Wall
Apr 2, 2013 · Apt 4R
Close - Paint/plaster
Ceiling
Apr 2, 2013 · Apt 4R
Close - Paint/plaster
Wall
Apr 2, 2013 · Apt 4R
Close - General
Cabinet
Apr 2, 2013 · Apt 4R
Close - Plumbing
Toilet
Apr 2, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Apr 2, 2013 · Apt 4R
Close - General
Cabinet
Jan 11, 2013 · Apt 4R
Close - Nonconst
Vermin
Jan 11, 2013 · Apt 4R
Close - Plumbing
Shower-stall
Jan 11, 2013 · Apt 4R
Close - Paint/plaster
Wall
Jan 11, 2013 · Apt 4R
Close - Electric
Lighting
Jan 11, 2013 · Apt 4R
Close - General
Window guards
Jan 11, 2013 · Apt 4R
Close - Electric
Lighting
Jan 11, 2013 · Apt 4R
Close - General
Floor
Jan 11, 2013 · Apt 4R
Close - Appliance
Electric/gas range
Jan 11, 2013 · Apt 4R
Close - Plumbing
Basin/sink
Jan 11, 2013 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1905
- Floors
- 4
- Residential units
- 8
- Building area
- 12,432 ft²
- Lot area
- 3,783 ft²
- Zoning
- R7B
- Community board
- 306
- Council district
- 39
- Block / lot
- 1089 / 56
- Assessed value
- $2,225,250
- Landmark / historic district
- Park Slope Historic District
HPD registration #321937, last renewed Dec 11, 2023.
Questions about 541 8 Street
Who owns 541 8 Street?
The owner of record in NYC Department of City Planning PLUTO data is 541 Eighth Street Owners Corp.
Does 541 8 Street have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 541 8 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 541 8 Street built?
City records list 1905 as the year it was built.
How many apartments are in 541 8 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.