230 St Johns Place
Brooklyn, NY 11217BBL 3-01059-0032Map
Owner of record: Piazza 26 LLC
230 St Johns Place is a walk-up apartment building built in 1884 in Brooklyn, 11217. It has 8 residential units across 3 floors. The owner of record is Piazza 26 LLC. HPD has recorded 105 housing violations here, most recently on October 7, 2026. 27 of the 50 most recent violations are still open.
- HPD violations
- 105
- DOB violations
- 31
- ECB violations
- 9
- HPD complaints
- 281
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 105
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the other located at sro 3d, 3rd story, 1st single room occupancy from south at west
Sep 23, 2026 · Apt 3D
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Sep 22, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at apt 2e, 2nd story, 2nd apartment from south at west
Sep 22, 2026 · Apt 2E
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2e, 2nd story, 2nd apartment from south at west
Sep 15, 2026 · Apt 2E
Open — Nov certified late - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 1, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 1, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper sign at public hall, 1st story
Jul 1, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 1, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper sign
Jul 1, 2026
Open — Nov certified on time
Show 40 more ↓
- BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Jun 15, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Jun 15, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system lock door to boiler room in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Jun 15, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Jun 15, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west
May 25, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 25, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
May 25, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 24, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system lock door at cellar at boiler room
May 24, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked leading to cellar at boiler room
May 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
May 22, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at b-room 3d, 3rd story, 1st b-room from south at west
May 12, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
May 10, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
May 10, 2026
Open — Nov certified late - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed elictrical wire at ceiling at basement
May 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
May 7, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door at basement at boiler room
May 5, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
May 5, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at vestibule door
Dec 16, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counterbalance at upper sash at south window in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Dec 16, 2025 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counterbalance at upper sash at 2nd window from east at south in the 2nd room from east located at b-room 3d, 3rd story, 1st b-room from east at south
Dec 16, 2025 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob at south in the kitchenette located at b-room 3d, 3rd story, 1st b-room from east at south
Dec 16, 2025 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Replace with standard wire glass the present glass at building entrance door
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Jul 2, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door , 1st story
Jul 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jul 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 1st apartment from east at south
Jul 2, 2025 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective locking device at door in the entrance located at apt 3d, 3rd story, 1st apartment from east at south
Jul 2, 2025 · Apt 3D
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 2, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [ missing notice ] at public hall, 1st story
Jul 2, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 2, 2025
Open — First no access to re- inspect violation - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Jul 2, 2025
Open — First no access to re- inspect violation - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.
Jul 2, 2025
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Jul 2, 2025 · Apt 3D
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Jul 2, 2025 · Apt 3D
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 2, 2025
Open — First no access to re- inspect violation - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 2, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at building front , 1st story
Jun 28, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door at building entrance
Jun 12, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door at basement entrance door
Jun 12, 2025
Closed — Violation closed
DOB building violations · 31
- Landmark none
Landmk-landmark none
Mar 26, 2026
Dob violation - active - Landmark none
Landmk-landmark none
Mar 26, 2026
Dob violation - active - Landmark none
Landmk-landmark none
Mar 26, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed
Show 21 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 16, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Landmark none
Landmrk-landmark none
Mar 15, 1990
Dob violation - dismissed - Landmark none
Landmk-landmark none
Mar 15, 1990
Dob violation - dismissed
ECB violations · 9
- Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. observed c of o # 182183 to have 4 furnished rms on 3rd fl. now 3rd fl has 3 furnished rms. furnished rm 3d an
Sep 21, 2026 · Penalty $2,500
Active - Class - 2
Observed on roof chimney cap replaced and flashing missing around cap. water able to access building., repair and/or replace; repair as per code.
May 21, 2026
Resolve - Class - 2
Atoi, permit b01332678-i1-gc expired on 04/11/2026 posted on window at 1st floor at front of building., post/properly post permit
May 7, 2026
Resolve - Class - 2
At time of inspection observed failure to post and distribute notice to occupants of tpp under job b01332678-i1-gc which expires on 6/02/2026 no tpp posted at the front door or floors., post/distr. notice
Apr 2, 2026 · Penalty $3,125
Resolve - Class - 2
At time of inspection observed active job permit #b01332678-i1-gc expires on 6/02/26 are not posted at the premises., post/properly post permit
Apr 2, 2026
Resolve - Class - 2
At time of inspection observed active job permits #b01364414-i1-la expires on 7/01/26 are not posted at the premises., post/properly post permit
Apr 2, 2026
Resolve - Class - 2
Found burnham(model#sin 7) gas fired boiler in cellar not registered correct violating condition submit certificate of correction
Jan 9, 2026 · Penalty $1,280
Active - Class - 2
As per class 2ýb265¨28-303.7 failure to file a complete boiler inspection report for 2024 as per dob records;correct violation+submit certificate of correction
Feb 3, 2025 · Penalty $3,125
Active - Class - 2
Work without a permit. at time of inspection, observed new wood posts and floor/ceiling joist for reinforcement installed in the cellar/basement(ground floor) levels, at the rear of the building. floorboards we
May 16, 2024 · Penalty $620
Resolve
Complaints
- General
Cooking gas
Oct 10, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 7, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 5, 2026 · Apt APT3D
Close - Heat/hot water
Entire building
Oct 1, 2026 · Apt 3D
Close - General
Cooking gas
Oct 1, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt 3D
Close - Appliance
Electric/gas range
Sep 23, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BUILDI
Close
Show 40 more ↓
- Heat/hot water
Entire building
Sep 20, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Jul 14, 2026 · Apt 3DANDA
Close - General
Cooking gas
Jul 14, 2026 · Apt 2F
Close - Plumbing
Water supply
Jun 30, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Jun 30, 2026 · Apt 3D
Close - Safety
Smoke detector
Jun 30, 2026 · Apt 3D
Close - General
Janitor/super
Jun 25, 2026 · Apt 3D
Close - General
Signage missing
Jun 25, 2026 · Apt 3D
Close - General
Signage missing
Jun 24, 2026 · Apt BLDG
Close - Safety
Smoke detector
Jun 24, 2026 · Apt 3D
Close - General
Janitor/super
Jun 24, 2026 · Apt 3D
Close - Plumbing
Water supply
Jun 18, 2026 · Apt 3D
Close - General
Cooking gas
Jun 16, 2026 · Apt 2F
Close - Plumbing
Water supply
Jun 8, 2026 · Apt 3D
Close - Plumbing
Water supply
Jun 8, 2026 · Apt 3D
Close - Plumbing
Water supply
Jun 5, 2026 · Apt 3D
Close - Electric
Wiring
May 31, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
May 30, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 29, 2026 · Apt 3D
Close - General
Janitor/super
May 29, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 29, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 29, 2026 · Apt BLDG
Close - General
Janitor/super
May 29, 2026 · Apt LOBBY
Close - General
Cooking gas
May 28, 2026 · Apt BLDG
Close - General
Cooking gas
May 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 28, 2026 · Apt BLDG
Close - General
Cooking gas
May 27, 2026 · Apt BLDG
Close - General
Cooking gas
May 27, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 27, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 26, 2026 · Apt 3D
Close - General
Cooking gas
May 25, 2026 · Apt BLDG
Close - General
Cooking gas
May 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 25, 2026 · Apt 3D
Close - Heat/hot water
Entire building
May 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 24, 2026 · Apt BLDG
Close - General
Cooking gas
May 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 24, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1884
- Floors
- 3
- Residential units
- 8
- Building area
- 3,905 ft²
- Lot area
- 1,875 ft²
- Zoning
- R7B
- Community board
- 306
- Council district
- 39
- Block / lot
- 1059 / 32
- Assessed value
- $834,300
- Landmark / historic district
- Park Slope Historic District
HPD registration #309294, last renewed Jul 23, 2025.
Questions about 230 St Johns Place
Who owns 230 St Johns Place?
The owner of record in NYC Department of City Planning PLUTO data is Piazza 26 LLC.
Does 230 St Johns Place have violations?
Yes. NYC HPD has recorded 105 housing violations at this property.
Is 230 St Johns Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 230 St Johns Place built?
City records list 1884 as the year it was built.
How many apartments are in 230 St Johns Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.