100 16 Street
Brooklyn, NY 11215BBL 3-01051-0030Map
Owner of record: 100 Jc Coin Realty LLC
100 16 Street is a walk-up apartment building built in 2018 in Brooklyn, 11215. It has 4 residential units across 4 floors. The owner of record is 100 Jc Coin Realty LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 4
- ECB violations
- 12
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
Stop all work immediately except tomake site safe, contact borough commissioner 718 802-3685
Jul 26, 2019
Dob violation - dismissed - Construction other optional
Stop all work immediately except tomake site safe contact borough comm issioner office 718 802-3677
Jul 26, 2019
Dob violation - dismissed - Construction other optional
Inadequate lateral-force system provided.under ceu audit per review of the latest structural drawing issued dated 2/4/19. the lateral force resisting system if the structure is inadequate in lateral direction the bldg. remedy: comply with code. stop all stuctural work. provide adequate recognized lateral force resisting system in lateral direct
Jul 15, 2019
Dob violation - dismissed
ECB violations · 12
- Class - 1
At time of inspection of nb 4 story building active jobsite observed all exterior work 100% completed at exp1 upon review the dob records observed that the jobsite under partial stop work order with complaint #
Jul 6, 2023 · Penalty $5,000
Resolve - Class - 2
Sec. bc 3301.6.1 no design drawing for temporary stairs. at the time of inspection on a 4 sty new bldg site,observed temporary stairs located from the cellar floor to the 1sst fl. upon request for design drawin
Jan 13, 2022
Resolve - Class - 1
Failure to institute/maintain safety equipment no guardrails. at time of inspection on a 4 sty new bldg construction site observed guardrails at exp#3 on the 1st fl not maintained. failure to maintain guardrail
Jan 13, 2022 · Penalty $2,500
Resolve - Class - 2
Temporary constructoin equipment on site-expired permit.as noted:at time of inspection observed site was closed.upon reviewing permits posted saw that fence permit #321185150-01 eq-fn issued 07/22/19 expired on
Jun 16, 2021 · Penalty $1,250
Resolve - Class - 2
Sws does not meet code specification.at time of inspection i observed the sidewalk shed not extended out far enough at exposure#2 pedestrians must be protect at all time.entering and exiting buildings and const
Feb 12, 2020 · Penalty $2,400
Resolve - Class - 1
Installed supported scaffold without permit.at time of inspection the contractor did not have a permit to erect a scaffold at exposure#1.stop all work at exposure#1 exterior scaffold.remedy:remedy:obtain a perm
Feb 12, 2020
Resolve - Class - 2
Unsafe supported scaffold not plum.at time inspection i observed scaffold leaning and not plum,as the code said.scaffold's utilized in conjunction with construction or demolition of a building or structure shal
Feb 12, 2020 · Penalty $1,250
Resolve - Class - 1
Rcny 101.06 (b) failure to perform special inspection duties: at time of inspection, observed following discrepancies between as built structures approved by the special inspector and the construction documents
Jul 17, 2019 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction docs.and/or approved amendments.as noted:at time of inspection on an active construction siteobserved at fls#3,#4;exp#1,#3 balconies beam-beam movement plate insta
Jun 5, 2019
Resolve - Class - 2
3307.2.3 sidewalk shed netting. at the time of inspection of a new building 4 stories under construction in the framing/superstructure phase i observed missing debris netting between the sidewalk shed and
May 15, 2019
Resolve
Show 2 more ↓
- Class - 2
Job site fence not maintained. at the time of my inspection,i observed fence for the construction site grounded at various location not maintained properly. nails are facing up can injured pedestrian walk by. a
Jul 3, 2018 · Penalty $400
Resolve - Class - 1
Bc3303.4.1.1/failure to maintain-sidewalk at time of inspection observed,jobsite not active.the sidewalk has not been adequately maintained.cracks are observed and deep foot imprints are creating tripping hazar
Apr 12, 2017 · Penalty $1,600
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 2018
- Floors
- 4
- Residential units
- 4
- Building area
- 5,312 ft²
- Lot area
- 2,557 ft²
- Zoning
- —
- Community board
- 307
- Council district
- 38
- Block / lot
- 1051 / 30
- Assessed value
- $562,950
- Landmark / historic district
- No
Questions about 100 16 Street
Who owns 100 16 Street?
The owner of record in NYC Department of City Planning PLUTO data is 100 Jc Coin Realty LLC.
Does 100 16 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 100 16 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 100 16 Street built?
City records list 2018 as the year it was built.
How many apartments are in 100 16 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.