125 15 Street
Brooklyn, NY 11215BBL 3-01040-0058Map
Owner of record: Unavailable Owner
125 15 Street is a walk-up apartment building built in 1931 in Brooklyn, 11215. It has 4 residential units across 3 floors. The owner of record is Unavailable Owner. HPD has recorded 9 housing violations here, most recently on June 3, 2016. 9 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 19
- ECB violations
- 2
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations located at apt 3, 3rd story, 1st apartment from north at east
Jun 3, 2016 · Apt 3
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at public hall, 1st story
Jun 3, 2016
Open — Nov sent out - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 3, 2016
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 3, 2016
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 3, 2016
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 3, 2016
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Jun 3, 2016 · Apt 3
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door , 1st story
Jun 3, 2016
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3, 3rd story, 1st apartment from north at east
Jun 3, 2016 · Apt 3
Open — Nov sent out
DOB building violations · 19
- Construction other optional
Failure to maintain in a code-compliant manner. atoi, building in disrepair, step cracks from 2nd/3rd fl. windows running up towards the roof on left. vertical/horizontal cracks from 2nd fl. towards the roof on right, & step crack/split bricks, broken windowsills/lintels at 1st/2nd floors front. creating immediately hazardous conditions for
May 16, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 2
- Class - 1
Failure to maintain in a code-compliant manner. atoi, observed building in disrepair, step cracking from 2nd/3rd fl. windows running up towards the roof on left. vertical/horizontal cracks from 2nd fl. towards
May 16, 2025 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain:defect is portion of roof collapsed at west centerof one story remedy: obtain a permit and make all necessary repairs note: remove the debris and provide temp. shoring: file a structure st
Aug 17, 1993 · Penalty $800
Resolve
Complaints
- Appliance
Electric/gas range
Dec 21, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 21, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 29, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 2A
Close - Plumbing
Water supply
May 20, 2022 · Apt BLDG
Close - Plumbing
Water supply
May 26, 2016 · Apt 3
Close - Plumbing
Water supply
May 26, 2016 · Apt 3
Close - Plumbing
Water supply
Feb 15, 2016 · Apt 2FL
Close - Heat/hot water
Apartment only
Feb 15, 2016 · Apt 2FL
Close
Show 6 more ↓
- Water leak
Heavy flow
May 1, 2014 · Apt 3
Close - Unsanitary condition
Pests
May 1, 2014 · Apt 3
Close - Plumbing
Basin/sink
May 1, 2014 · Apt 3
Close - Water leak
Slow leak
May 1, 2014 · Apt 3
Close - Water leak
Heavy flow
May 1, 2014 · Apt 3
Close - Electric
Electric-supply
Aug 29, 2005 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 8,000 ft²
- Lot area
- 6,684 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 38
- Block / lot
- 1040 / 58
- Assessed value
- $962,100
- Landmark / historic district
- No
Questions about 125 15 Street
Who owns 125 15 Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 125 15 Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 125 15 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 125 15 Street built?
City records list 1931 as the year it was built.
How many apartments are in 125 15 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.