459 3 Avenue
Brooklyn, NY 11215BBL 3-01009-0007Map
Owner of record: 459 3rd Avenue LLC
459 3 Avenue is a mixed residential and retail building built in 1920 in Brooklyn, 11215. It has 2 residential units across 3 floors. The owner of record is 459 3rd Avenue LLC. HPD has recorded 31 housing violations here, most recently on March 12, 2004. 31 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 16
- ECB violations
- 1
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- BHazardous
Properly repair the broken or defective door bell, 1st story apt 1.
Mar 12, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3, 3rd story
May 1, 2002 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 3, 3rd story
May 1, 2002 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling in the 1st room from north located at apt 3, 3rd story
May 1, 2002 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3, 3rd story
May 1, 2002 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 29, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative light fixture at front areaway of the building
Apr 29, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out
Show 21 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling in the 2nd room from north located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tile floor in the 1st room from north located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection locknut at wasteline of washbasin in the bathroom located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe at bathtub in the bathroom located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak ceiling in the 1st room from north located at apt 3, 3rd story
Apr 29, 2002 · Apt 3
Open — Nov sent out - BHazardous
Provide adequate lighting for no light at 3rd sty at public hall
Aug 11, 2001
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at 3rd sty at public hall
Aug 11, 2001
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete floor in the bathroom from east located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plasterboard ceiling, south and east wall in the bathroom from west located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling, walls, and trim throughout in the entire apartment located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plasterboard ceiling at closet in the foyer located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in closet in the foyer located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection locknut at washbasin in the bathroom from east located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom from east located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the bathroom from west located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plasterboard ceiling in the bathroom from east located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 3, 3rd story
Jul 5, 2001 · Apt 3
Open — Nov sent out
DOB building violations · 16
- Construction other optional
The borough commissioner has issued a notice to revoke application #340496243 due to license(s) suspension of the general contractor and/or superintendent of construction. all work in connection with this application has been ordered stopped immediately
Jun 30, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Hazardous
Failure to maintain exterior building wall defects: front facade of building 2nd and 3rd floor south side brick are pulling away from wall approx. 3". brownstone lintel are cracked and spalling. remedy:maintain
Oct 15, 2004 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Jan 17, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2014 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 3,125 ft²
- Lot area
- 1,098 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 38
- Block / lot
- 1009 / 7
- Assessed value
- $200,940
- Landmark / historic district
- No
Questions about 459 3 Avenue
Who owns 459 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 459 3rd Avenue LLC.
Does 459 3 Avenue have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 459 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 459 3 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 459 3 Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.