roofy

454 3 Avenue

Brooklyn, NY 11215BBL 3-01002-0034Map

Owner of record: Rodriguez, Juan E

454 3 Avenue is a mixed residential and retail building built in 1899 in Brooklyn, 11215. It has 4 residential units across 3 floors. The owner of record is Rodriguez, Juan E. HPD has recorded 7 housing violations here, most recently on March 9, 2004. 7 of the 7 most recent violations are still open.

HPD violations
7
DOB violations
3
ECB violations
6
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 9, 2004

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 7

  • B

    Abate the nuisance consisting of double cylinder key operated lock entrance gate to building

    Mar 9, 2004

    Open — Nov sent out
  • B

    Provide hot water at all hot water fixtures kitchen & bathroom 3rd sty apt

    Jul 16, 2003

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin 3rd sty apt bathroom & kitchen - roaches & mice

    Jul 16, 2003

    Open — Nov sent out
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet 3rd sty apt bathroom

    Jul 16, 2003

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl 3rd sty apt bathroom

    Jul 16, 2003

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color 3rd sty apt bathroom wall and ceiling

    Jul 16, 2003

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls of all rooms 3rd sty apt

    Jul 16, 2003

    Open — Nov sent out

DOB building violations · 3

  • Plumbing none

    Commissioners request for immediate corrective action i observed in the basement hot water heater not installed correctly observed condition(s) does not comply with section 28-301.1 of the b102 and presents an imminent risk to public safety. correct the situation within 48 hours

    May 12, 2022

    Dob violation - active
  • Construction other optional

    Hazardous

    May 8, 2001

    Dob violation - active
  • Construction other optional

    Work without a permit. work noted: remove existing wood stairs and installed new metal and concrete stairs from cellar thru 3rd floor demolished partition walls at cellar remedy: obtain a permit forthwith

    May 8, 2001

    Vw-violation work without permit - active

ECB violations · 6

  • Class - 1

    I observed as per dob records an failure to comply with commissioners order for water heater that is non compliant with code and needs to be re-inspected; however there has not been any compliance from responde

    Sep 20, 2022

    Resolve
  • Class - 2

    Note: at cellar level wood flooring joints rotted/charred broken and separated from the concrete and mortar joints pocket embedded within the foundation wall, also the stairs to cellar in total disrepair the ri

    May 13, 2022 · Penalty $500

    Active
  • Class - 1

    Work without a permit i observed in cellar installed a pump and waste line .also installed hot water heater no permit on file work done 100 percent, obtain permit

    May 12, 2022 · Penalty $12,500

    Active
  • Class - 1

    I observed in cellar in boiler room temperature relief valve not piped out . hot water heater vent not installed correctly not using the right fitting and not tied into vent stack correctly. boiler room used as

    May 12, 2022 · Penalty $6,250

    Active
  • Non-hazardous

    Work without a permit work noted:remove existing wood stairs and installed new metal and concrete stairs from cellar thru 3rd floor.(2)demolish partition walls at cellar.remedy:obtain a permit forthwith.

    May 8, 2001

    Resolve
  • Non-hazardous

    Failure to maintain:defect is:missing ifre stop ceiling at cellar 2 missing fire stop ceiling,in various location at 1fl.rotten and defective cornice at 2 story repairs to the satisfaction of this department.

    May 8, 2001 · Penalty $800

    Active

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S4)
Year built
1899
Floors
3
Residential units
4
Building area
3,420 ft²
Lot area
1,488 ft²
Zoning
M2-1
Community board
306
Council district
39
Block / lot
1002 / 34
Assessed value
$738,900
Landmark / historic district
No

Questions about 454 3 Avenue

Who owns 454 3 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Rodriguez, Juan E.

Does 454 3 Avenue have violations?

Yes. NYC HPD has recorded 7 housing violations at this property.

Is 454 3 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 454 3 Avenue built?

City records list 1899 as the year it was built.

How many apartments are in 454 3 Avenue?

It has 4 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.