37 9 Street
Brooklyn, NY 11215BBL 3-00990-0050Map
Owner of record: Gowanus 9th Street Holdings LLC,
37 9 Street is a warehouse built in 1930 in Brooklyn, 11215. The owner of record is Gowanus 9th Street Holdings LLC,. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 12
- ECB violations
- 27
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 12
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2014
Dob violation - resolved - Construction other optional
Work does not conform to approved construction documents and/or approv ed amendments the entire 3rd floor layout is contrary to plans they do not show 3 pc bathrooms, kitchens, and egress there are some partitio ns @ the 2nd floor also not on plans and no drawings for 301330236a2 remedy: conform to apporved documents or amendments show all changes &
Oct 27, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 14, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 25, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 20, 2007
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Dec 17, 2003
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Plumbing none
P-plumbing none
Dec 20, 1989
Dob violation - active
Show 2 more ↓
- Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
Must file for removal of freight elev. with this dept
Aug 31, 1988
Dob violation - resolved
ECB violations · 27
- Class - 2
Observed 1/2 gas pipe being supported by wire which is prohibited by code see fuel gas code 407.2, repair and/or replace
Apr 12, 2024 · Penalty $625
Active - Class - 2
Observed at time of inspection new gas pipe ran to heating equipment connected to existing gas pipe having no permit filed gas work., obtain all permits
Apr 12, 2024 · Penalty $1,250
Active - Class - 2
At the time of inspection of an active job site i observed a construction fence at exp#1 that is missing an information panel. all job sites are required to have a project inforation panels on the construction
Sep 1, 2022 · Penalty $625
Resolve - Class - 2
At the time of inspection of an active interior renovation job site, i requested for approved construction documents to be seen while work was being done, none were provided.
Sep 1, 2022 · Penalty $312
Resolve - Class - 2
Failure to file a final inspection for completed work within 1 year of permit expiration.premises under alt 2 #320356324 which permit expired 05/18/2013 application filed for facade repairs and brick pointing
Oct 15, 2018 · Penalty $620
Resolve - Class - 1
Failure to maintain exterior bldg wall(s) or appurtenances. at time ofinspection observed at front of premises, exp 1, brick parapet closestto adjacent bldg, 3 sty bldg (65 9th st) is cracked, missing mortar
Mar 3, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to maintain exterior bldg wall(s) or appurtenances. at time ofinspection observed at rear of premises at exps 2 & 3 along driveway masonry brick facade is severely deteriorated partially due to older
Mar 3, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to maintain interior. on inspection shaft openings from 2nd to3rd flr has no protection in place to prevent 20' to 30' ft drop to ground flr at rear of bldg. remedy: provide protection or locks at all
Feb 9, 2009 · Penalty $1,000
Resolve - Class - 1
Plumbing work w/o a permit in manufacturing district for residential use observed(modine) gas heaters hung in apts 3c,3b,& 300which are for commercial use. apt 3c had illegal fitting dresser couplings & unions.
Feb 5, 2009
Resolve - Class - 1
Plumbing work w/o a permit in manufacturing district for residential use. observed modine gas heaters hung in apts 3c, 3b and 300. which arefor commercial use. apts 3v has illegal fittings on gas line (dresser
Feb 5, 2009 · Penalty $2,400
Resolve
Show 17 more ↓
- Class - 1
Work w/o a permit. on inspection partitions have been erected on 2nd flr to create 11 rooms w/ steel fire rated doors sheet rock and metal studs. as per dob records shows no permit has been issued for above
Feb 5, 2009 · Penalty $8,000
Resolve - Class - 1
Construction or alteration work w/o a permit in manufacturing districtfor residential use. partitions, kitchens, bthrms (3pc) have been added on entire 3rd flr creating 4 class a apts. bldg marked 53 kitchen an
Feb 5, 2009 · Penalty $2,400
Resolve - Class - 2
Maintain or permit conversion of industrial/manufacturing bldg to residential use w/o c of o code compliance. 11 rooms in place w/ 1 occupied studio on 2nd flr. 4 class a apt in place on 3rd flr and 1 class a
Feb 5, 2009 · Penalty $12,000
Resolve - Class - 2
Illegal use in a manufacturing district. 4 lofts created on 3rd flr ofmanufacturing bldg apts on 3rd flr. 11 room created on 2nd flr and 1 class a apt in rear bldg marked 53 on 2nd flr. in a m1-2 zoning distric
Feb 5, 2009 · Penalty $800
Resolve - Class - 1
Prohibited door hardware. steel gate doors with illegal double,cylinder dead bolt lock device on rear doors on 2nd & 3rd fl. remedy: remove illegal hardware immediately.
Feb 5, 2009 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit. work noted: erected metal multi-level (3 levels) parking garage approx: 30 feet high x 10 feet width x 40 feet lengthwith stored vehicle at 2nd level of structure. noted location: rear
Apr 18, 2006
Resolve - Hazardous
Failure to maintain-work noted-rotten and decayed timbers supports in roof, some of which are starting or have already fallen.charred supports in so. west corner of building.the result of a fire, nothing has be
May 23, 2001
Resolve - Hazardous
No secondary means of egress-throughout warehouse.all steel gates & metal door are permanantly sealed,some are concrete solid.walking to all these exits are completely blocked.remedy:supply secondary means od e
May 23, 2001
Resolve - Hazardous
Failure to maintain-at front of bldg.structural stability of parapit walls has cracks & is leaning onto roof.at front right of bldg. cracks from 1st flr.to roof line.rem:maintain bldg.hazardous
May 23, 2001
Resolve - Non-hazardous
Failure to maintain.note:entire roof is weak sagging and in possible danger of collaspsing note:the majority of roof joist are cracked and rotten a few are twisted and out of plumb.one main girder running from
Apr 24, 2000 · Penalty $800
Resolve - Non-hazardous
Failure to provide panic hardware where required by law.note:west rear door has no panic device and has multiple dead bolt latches which impedes egress in case of an emergency.remedy:provide panic hardware as
Apr 24, 2000 · Penalty $350
Resolve - Hazardous
Failure to maintain : entire roof is weal sagging and in possible danger of collapsing ,the majority of the ceiling joist are cracked the main girders are sagging and the wood post are out of plumb under the we
Apr 24, 2000
Resolve - Hazardous
Failure to maintain note at 71 9th street entrance led to 59th street so. west corner their exist fire damage creating bldg. timber supports and wood frame wall out of plumb note:at ceiling level chard rafters
Feb 17, 2000 · Penalty $800
Resolve - Hazardous
Failure to maintain . note: at front of building the structural stab- ily of the parapet wall has cracks and its leaning into the roof. at front right there are step cracks from from floor to roof line.
Dec 27, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain building exterioe wall defect, loose and missing brickwork at the soouth west corner of the building, remedy, repair defective brickwork
Jan 22, 1997
Resolve - Non-hazardous
Failure to maintain bldg interior defects are:cracked rotted roof beams columns and grinders at varios locations thru-out the bldg cracked brickwork at center rear.remedy:obtain a permit make all necessary repa
Dec 28, 1995 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain bldg interior defects is:cracked wood columns at various locations thru-out cracked brickwork at east rear.remedy:make all necessary repairs.
Dec 12, 1995 · Penalty $1,000
Resolve
Complaints
- Heating
Heat related
Oct 28, 2005 · Apt 370
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 13, 2026 | $37,500,000 | Warehouses | 7 |
Building details
- Building type
- Warehouse (E1)
- Year built
- 1930
- Floors
- 1
- Residential units
- —
- Building area
- 118,367 ft²
- Lot area
- 126,067 ft²
- Zoning
- M2-1
- Community board
- 306
- Council district
- 39
- Block / lot
- 990 / 50
- Assessed value
- $6,557,400
- Landmark / historic district
- No
Questions about 37 9 Street
Who owns 37 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is Gowanus 9th Street Holdings LLC,.
Does 37 9 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 37 9 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 37 9 Street built?
City records list 1930 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.