212 3 Street
Brooklyn, NY 11215BBL 3-00978-0016Map
Owner of record: Wfm Properties Brooklyn LLC
212 3 Street is a store building built in 2013 in Brooklyn, 11215. The owner of record is Wfm Properties Brooklyn LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 13
- ECB violations
- 27
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 13
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2019
Dob violation - resolved - Construction other optional
Ftm.2 stry light gage detach steel truss framed mercantile bldg on gowanus canal 4th st basin waterfront.pavers in outdoor seat area settled in mult locs.immed adj to bldg at exp2,pavers settled exposing bldgs found.remedy:prov engr rpt to feu no later 4/20/18.own engage lic prof prep rpr dwgs&file w/dob no later 5/18/18
Apr 2, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2015
Dob violation - resolved
Show 3 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 27, 2014
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Construction other optional
Hazardous
May 17, 2001
Dob violation - dismissed
ECB violations · 27
- Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35272919m issued on 1/30/18, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certifica
Nov 20, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. noted: patio brickssurface at south side of supermarket and chnel sinking down, brick separated became loose and unstable. rmdy: repair and/or replace.
Jan 30, 2018 · Penalty $500
Resolve - Class - 1
Work w/o permit. observed at 5pm solar system installed throughout parking lot. feeding light poles in parking lot. remedy: obtain permit.
Feb 20, 2014 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. at time of inspection observed 2 sty construction site,site active,workers working.greenhouse has been erected on top of 1st
Dec 9, 2013 · Penalty $250
Resolve - Class - 1
Nb or open lot occupied w/o a valid c/o. at the time of inspection observed supermarket construction in progress, store shelves being stocked w/food.workers of store on site stacking shelves w/variousfood items
Dec 5, 2013 · Penalty $1,000
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection at exp 3 different type offence installed and missing some areas at same location; contrary to
Nov 27, 2013
Resolve - Class - 2
Job site fence not painted pursuant to subsection bc 3307.6/bc 3307.7.note:obs active jobsite approx 100' of jobsite fence not painted green as per code.fence permit #301923346-01-eq-fn renewed 07/31/13.rem:com
Oct 19, 2013
Resolve - Class - 2
Fail to provide construction fence viewing panels.note:obs active jobsite approx 100' of jobsite fence no viewing panels installed as per code.fence permit #301923346-01-eq-fn renewed 7/31/13.rem:comply w/code.
Oct 19, 2013
Resolve - Class - 2
Project information/construction sign not provided or not in compliance w/section. noted: construction site,fence erected under permit #301923346-01-eq-fn issued 7/24/08 does not comply with ll47/13. project in
Oct 11, 2013
Resolve - Class - 1
Work does not conform to approved construction documents and permits -upon inspection, construction work is in progress. the site is active.at time of inspection noted mobile crane w/cn #676/13 is in use for
Aug 17, 2013 · Penalty $4,800
Resolve
Show 17 more ↓
- Class - 1
3301.7 full *swo*design req fall protection.no design drawing provided.note:iron wrkrs laying out q-decking on stall mezz fl approx 25' height.no design drawing on site for fall protection.3 wrkrs injured in fa
Mar 18, 2013 · Penalty $400
Resolve - Class - 1
Failure to comply w/nyc fire code general no permit for oxygen,acetylene,propane,tar kettle, diesel,kerosene,etc. noted: one tank of oxygen and one of acetylene at expo 4 - two men cutting metal - no permit for
Jan 15, 2013
Resolve - Class - 1
3307.7 fences-when req'd by this code, fences shall be at least 8ft.high & constructed of wood or other suitable material.they shall be built solid for the entire length.noted @ time of inspec.approx.500 liner
Sep 22, 2010 · Penalty $400
Resolve - Class - 2
28-105.11 failure to post work permit on construction site.noted @ time of inspec.fence permit#301923346-01-eq-fn not posted issued 6/08/2010 expires 06/03/11.remedy:comply w/notice of violation post permit.
Sep 22, 2010 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. construction fence on 3 st and 3 ave fell onto public walk@ time of inspection. remedy: safeguard public & property.
Sep 17, 2010 · Penalty $1,200
Resolve - Class - 2
(misc)28-105.12.8work is not in accordance to approved site safety plan by best squad.note:@ time of inspection @ above site observed jobsite fence missing @ exposure 3 ground level along tue canal,nov work was
Jun 26, 2010 · Penalty $400
Resolve - Class - 2
Failure to comply w/nyc dob regulations smoking within construction site.note:@ time of inspection @ above site construction work in progress observed worker smoking within construction site in violation of nyc
Jun 8, 2010 · Penalty $6,000
Resolve - Class - 2
Fail to provide approved plans on site for inspection upon inspection foundation & earthwork permit issued work in progress,removing of earth & some (excavation) no approved plans on site for inspection.remedy:
Apr 7, 2010 · Penalty $250
Resolve - Class - 2
3310.3.site safty plan site safty program req.upon insp const site under block 978/lot 16 is approx 91,568 ft lot 23 part of site & being used as entrance,offices,& const (eqpt) & proposed parking area for new
Apr 7, 2010 · Penalty $400
Resolve - Class - 1
Sec. 3309.4. failure to provide 3'6" guard rail or solid enclosure around open and accessible side of excavation. noted at time of inspection contractor failed to provide guard rails around open contaminated
Apr 7, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 3304.3.1. failure to notify dob w/i 24-48 hrs of the start of excavation. noted: contractor excavated approx 6' and installed trench box and failed to notify dob prior to start. remedy: officially notify
Apr 7, 2010 · Penalty $400
Resolve - Class - 2
Sec. 3304.4.3. failure to provide required lot line construction fence(excavation) noted contractor failed to provide any construction fenceat exp 3 approx 800'. remedy: provide 8' code required construction
Apr 7, 2010 · Penalty $400
Resolve - Hazardous
Sec. 27-misc. miscellaneous demolition violation. fence not per code section 27-1021. upon insp at 192 3rd st bldg is down, slab & debris remain, demo site is wide open to the public approx 50' remedy: comply
Mar 14, 2008 · Penalty $400
Resolve - Hazardous
Failure to safeguard public & property affected by demo operations. upon inspection at 192 3rd st bldg is down to slab, debris remaining, demo site is in a condition of abandon w/approx 50' of this fence on the
Mar 14, 2008 · Penalty $1,500
Resolve - Non-hazardous
Expired permit:approx 150 linear feet of fence has been erected:under permit# 301961526 fence permit has expired on 12-31-05.remedy:renew permit
Jun 28, 2006 · Penalty $250
Resolve - Non-hazardous
Failure to maintain exterior building wall.defect is:buildig of front facade east to west over second floor window central to parapet.separation of front facade and east and west walls north end.remedy:make sit
May 17, 2001 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior building wall. defect is: building of front facade east to west over second fl window central to parapet. seperation of front facade and east and west walls north end. remedy: make
Nov 22, 1999 · Penalty $800
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K8)
- Year built
- 2013
- Floors
- 1
- Residential units
- —
- Building area
- 75,421 ft²
- Lot area
- 90,990 ft²
- Zoning
- M2-1
- Community board
- 306
- Council district
- 39
- Block / lot
- 978 / 16
- Assessed value
- $18,217,350
- Landmark / historic district
- No
Questions about 212 3 Street
Who owns 212 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is Wfm Properties Brooklyn LLC.
Does 212 3 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 212 3 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 212 3 Street built?
City records list 2013 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.