245 21 Street
Brooklyn, NY 11215BBL 3-00891-0075Map
Owner of record: 245 21st Street LLC
245 21 Street is a walk-up apartment building built in 2025 in Brooklyn, 11215. It has 4 residential units. The owner of record is 245 21st Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 1
- ECB violations
- 16
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed
ECB violations · 16
- Class - 1
Failure to maintain adequate housekeeping per section requirements. asnoted: at time of inspection of jobsite of a proposed 4 story buildingalready at the rooftop level, observed at 2nd floor to the basement fa
Jun 16, 2026 · Penalty $12,500
Active - Class - 1
Landing from 1st floor to cellar missing gaurdrail. potential for 6' fall and serious injury or death. gaurdrails at additional landings missing toe boards. potential for falling objects and injury., provide gu
Mar 9, 2026 · Penalty $5,000
Resolve - Class - 1
Missing improper loose handrails from cellar to rooftop. handrials to cellar from loose and falling over. at fl 4 to roop handrails fully missing. fl 1-2 handrial does not fully extend the length of stair., pro
Mar 9, 2026 · Penalty $2,500
Resolve - Class - 1
Workers on site could not provide a log of worker orientations. also daily huddle log last entry was 6/30/2025. no record of workers training or who/how many workers are onsite, provide/maintain required docume
Mar 9, 2026 · Penalty $5,000
Resolve - Class - 1
Observed two full 5 gallon jugs of gasoline inside the jobsite. lifted both full cans to check. also opened spout to verify smell of gasoline. gas is not in a cage, onfloor with other const matls. potential to
Mar 9, 2026 · Penalty $2,500
Resolve - Class - 1
Loose wood blocks at steel pan stairs from cellar to roof creating potential for trip and falls. also orange neeting loose throughout and laying on stairs also creating a serious trip hazard., maintain adequate
Mar 9, 2026 · Penalty $2,500
Resolve - Class - 2
I observed a supported scaffold over 40ft erected with several violating conditions.not maintained per code bc 3314.4.2 scaffold planks not secured(tied down) bc 3314.12.6 missing toe boards bc 3314.8.10 damag
Dec 6, 2025 · Penalty $2,530
Resolve - Class - 1
At exposure#3 rear of structure there were piles of debris,material,and combustibles mixed together while generator is running to supply temp power. this can cause fire and pest hazards for public and property
Dec 6, 2025 · Penalty $2,530
Resolve - Class - 2
I observed an open perimeter on roof with no fall protection(guardrail system)violating bc 3308.7 in place. worker was stepping on to supported scaffold from open roof perimeter which can become a fatal hazard.
Dec 6, 2025 · Penalty $2,530
Resolve - Class - 2
3314.3.4 active jobsite 4 story nb. observed supported scaffold installed on top of sidewalk shed at expo 1. upon request for required loads imposed letter, competent person on site was unable to provide. stop
Oct 15, 2025 · Penalty $2,500
Resolve
Show 6 more ↓
- Class - 2
Active jobsite 4 story nb. observed sidewalk shed installed at expo 1 with materials and supported scaffold built on top. upon request for required approved sidewalk shed drawings, none were provided on site. s
Oct 15, 2025 · Penalty $1,250
Resolve - Class - 2
Inactive jobsite, upon inspection, observed supported pipe scaffold left unsecured with multiple loose components & make-shift connections posing a threat to the public. stop all exterior work & use of scaff
Oct 13, 2025
Resolve - Class - 2
Bc3314.01. supported pipe scaffold connections between frames contrary to plans-observed supported scaffold at building perimeter not erected and or maintained as per code requirements. scaffold with multiply l
Oct 13, 2025
Resolve - Class - 1
Failure to institute or maintain safety equipment or temporary construction-"no guardrail". as noted: at time of inspection at an active jobsite for a proposed 4 story building on the soe foundation phase. obse
Jul 10, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to maintain display onsite documents as required by bc chapter33. as noted: at time of inspection at an active jobsite for a proposed 4 story building on the foundation or soe level. observed on the fou
Jul 10, 2025 · Penalty $6,250
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 2025
- Floors
- —
- Residential units
- 4
- Building area
- 4,771 ft²
- Lot area
- 1,703 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 39
- Block / lot
- 891 / 75
- Assessed value
- $35,100
- Landmark / historic district
- No
Questions about 245 21 Street
Who owns 245 21 Street?
The owner of record in NYC Department of City Planning PLUTO data is 245 21st Street LLC.
Does 245 21 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 245 21 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 245 21 Street built?
City records list 2025 as the year it was built.
How many apartments are in 245 21 Street?
It has 4 residential units.