288 20 Street
Brooklyn, NY 11215BBL 3-00891-0032Map
Owner of record: Wong, Jon L.
288 20 Street is a walk-up apartment building built in 1931 in Brooklyn, 11215. It has 6 residential units across 3 floors. The owner of record is Wong, Jon L.. HPD has recorded 150 housing violations here, most recently on May 1, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 150
- DOB violations
- 8
- ECB violations
- 1
- HPD complaints
- 289
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 150
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at ceiling in the 3rd room from north located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at riser in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Aug 30, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective latch set at vestibule door , 1st story
May 15, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door , 1st story
May 15, 2024
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective door sagging at building entrance door , 1st story
May 15, 2024
Open — Nov sent out - BHazardous
Refit building entrance door , 1st story
May 15, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 12, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1l, 1st story, apartment at east
Sep 8, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north, east and west walls in the 2nd room from north located at apt 1l, 1st story, apartment at east
Sep 8, 2018 · Apt 1L
Open — Nov sent out - BHazardous
§ 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling .. at cellar
Aug 30, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 30, 2018
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 30, 2018
Open — Nov sent out - BHazardous
Properly repair the broken or defective frame at entrance door to building at public hall, 1st story
Aug 30, 2018
Open — Nov sent out - BHazardous
Replace with new the missing door at boiler room
Aug 30, 2018
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors secondary exit door in the 1st room from east located at apt 1l, 1st story, apartment at south
Jun 6, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3l, 3rd story, apartment at south
Jun 6, 2018 · Apt 3L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 3l, 3rd story, apartment at south
Jun 6, 2018 · Apt 3L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors secondary exit in the 1st room from east located at apt 3l, 3rd story, apartment at south
Jun 6, 2018 · Apt 3L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping wood floors in the entire apartment located at apt 2r, 2nd story, apartment at west
May 30, 2018 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping wood floors in the entire apartment located at apt 3r, 3rd story, apartment at west
May 30, 2018 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping floors and stairs at the public hall, stories 2 and 3
May 30, 2018
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors at the building entrance , 1st story
May 30, 2018
Open — Nov sent out - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also door chain guard in the entrance located at apt 1l, 1st story, apartment at east
Apr 12, 2018 · Apt 1L
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration : suspended ceiling / celotex tiles / in the kitchen located at apt 1l, 1st story, apartment at east
Apr 12, 2018 · Apt 1L
Open — Nov sent out - ANon-hazardous
Refit upper and lower window sashes in the kitchen located at apt 1l, 1st story, apartment at east
Apr 12, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wiring on east wall in the kitchen located at apt 1l, 1st story
Apr 12, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1l, 1st story, apartment at east
Apr 12, 2018 · Apt 1L
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors at entrance to building , 1st story
Mar 29, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Open — Second no access to re-inspect violation - BHazardous
Properly repair with similar material the broken or defective fire retardant ceilings at cellar
Nov 6, 2017
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Open — Second no access to re-inspect violation - ANon-hazardous
Replace with new the defective flush pipe of water closet .. in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective connection under sink at waste line in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, 1st apartment from south at west
Nov 6, 2017 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2017 · Apt 2R
Open — Not complied with - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling (4 sq. ft. ) in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Nov 6, 2017 · Apt 2R
Closed — Violation closed
DOB building violations · 8
- Emergency none
Egncy-emergency none
Dec 28, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active
ECB violations · 1
- Class - 2
Failure to maintain bldg in code compliant manner noted sloping fl at apt 2r and staircase approx 2 bulging size aprox 18ftx55ftx30fth remedy: obtain all applicable permits to repair maintain bldg flrs
Jul 17, 2009 · Penalty $500
Active
Complaints
- Plumbing
Toilet
Jan 2, 2026 · Apt 1L
Close - General
Cabinet
Jan 2, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Jan 2, 2026 · Apt 1L
Close - Electric
Lighting
Jan 2, 2026 · Apt 1L
Close - Door/window
Door
Jan 2, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Jan 2, 2026 · Apt 1L
Close - Plumbing
Toilet
Jan 2, 2026 · Apt 1L
Close - Paint/plaster
Wall
Jan 2, 2026 · Apt 1L
Close - Electric
Outlet/switch
Jan 2, 2026 · Apt 1L
Close - Plumbing
Bathtub/shower
Aug 21, 2024 · Apt 2L
Close
Show 40 more ↓
- Electric
Lighting
Aug 21, 2024 · Apt 2L
Close - Electric
Wiring
Aug 21, 2024 · Apt 2L
Close - Safety
Carbon monoxide detector
Aug 21, 2024 · Apt 2L
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt 1L
Close - Unsanitary condition
Pests
May 7, 2024 · Apt 2R
Close - Flooring/stairs
Floor
Oct 22, 2021 · Apt 1L
Close - Door/window
Door
Oct 22, 2021 · Apt 1L
Close - Electric
Wiring
Oct 22, 2021 · Apt 1L
Close - Paint/plaster
Radiator
Oct 22, 2021 · Apt 1L
Close - Unsanitary condition
Pests
Oct 22, 2021 · Apt 1L
Close - Unsanitary condition
Pests
Oct 22, 2021 · Apt 1L
Close - Unsanitary condition
Pests
Oct 22, 2021 · Apt 1L
Close - Unsanitary condition
Mold
Oct 22, 2021 · Apt 1L
Close - Electric
Wiring
Oct 22, 2021 · Apt 3R
Close - Unsanitary condition
Pests
Oct 22, 2021 · Apt 3R
Close - Door/window
Door
Oct 22, 2021 · Apt 3R
Close - Flooring/stairs
Floor
Oct 22, 2021 · Apt 3R
Close - Plumbing
Toilet
Oct 22, 2021 · Apt 3R
Close - Flooring/stairs
Stairs
Oct 22, 2021 · Apt BLDG
Close - Outside building
Skylight
Oct 22, 2021 · Apt BLDG
Close - Safety
Fire escape
Oct 22, 2021 · Apt BLDG
Close - Water leak
Damp spot
Oct 22, 2021 · Apt BLDG
Close - Paint/plaster
Door/frame
Oct 22, 2021 · Apt BLDG
Close - Safety
Fire escape
Oct 22, 2021 · Apt BLDG
Close - Door/window
Door
Oct 22, 2021 · Apt BLDG
Close - Flooring/stairs
Stairs
Feb 11, 2019 · Apt BLDG
Close - Door/window
Door
Feb 11, 2019 · Apt BLDG
Close - Safety
Smoke detector
Feb 11, 2019 · Apt 3L
Close - Safety
Carbon monoxide detector
Feb 11, 2019 · Apt 3L
Close - Safety
Window guard broken/missing
Feb 11, 2019 · Apt 1R
Close - Flooring/stairs
Floor
Aug 28, 2018 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 28, 2018 · Apt BLDG
Close - Door/window
Door frame
Aug 28, 2018 · Apt BLDG
Close - Door/window
Door frame
Aug 28, 2018 · Apt BLDG
Close - Door/window
Door frame
Aug 28, 2018 · Apt BLDG
Close - Outside building
Porch/balcony
Aug 28, 2018 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 28, 2018 · Apt 1L
Close - Paint/plaster
Wall
Aug 28, 2018 · Apt 1L
Close - Safety
Carbon monoxide detector
Aug 28, 2018 · Apt 3L
Close - Paint/plaster
Wall
Aug 28, 2018 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 3,750 ft²
- Lot area
- 2,504 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 39
- Block / lot
- 891 / 32
- Assessed value
- $688,950
- Landmark / historic district
- No
HPD registration #315087, last renewed Jul 30, 2026.
Questions about 288 20 Street
Who owns 288 20 Street?
The owner of record in NYC Department of City Planning PLUTO data is Wong, Jon L..
Does 288 20 Street have violations?
Yes. NYC HPD has recorded 150 housing violations at this property.
Is 288 20 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 288 20 Street built?
City records list 1931 as the year it was built.
How many apartments are in 288 20 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.