261 52 Street
Brooklyn, NY 11220BBL 3-00797-0049Map
Owner of record: Pan Brothers Management, INC.
261 52 Street is an office building built in 1999 in Brooklyn, 11220. The owner of record is Pan Brothers Management, INC.. HPD has recorded 31 housing violations here, most recently on April 15, 2004. 31 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 1
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- CImmediately hazardous
Abate the nuisance consisting of concealed water leak ceiling bathroom 1st story apt. #1. er-1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor 1st story apt 1, 2nd room from rear.
Apr 15, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling bathroom, and front room 1st story apt. #1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Replace with new the missing cover electric outlet wall bathroom 1st story apt.
Apr 15, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings 1st story apartment kitchen and front bedroom
Apr 15, 2004
Open — Nov sent out - ANon-hazardous
Refit 1st story apartment entrance door to apartment
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures kitchen stove 1st sty. apt. 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under water closet flush tank in bathroom 1st story apt. #1. er-1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings, throughout 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling kitchen, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out
Show 21 more ↓
- BHazardous
Abate the nuisance consisting of exposed electrical wires ceiling rear room, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbsih, sewage, water cellar throughout. er1 # 1723-611
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas shut off by b.u.g. 1st story apt 1. er1 # 1723-609
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet bathroom, 1st story apt 1. er1 # 1723-611
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom, 1st story apt 1. er1 # 1723-611
Apr 15, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster board at ceiling and wall, throughout 1st story apt 1, bathroom.
Apr 15, 2004
Open — Nov sent out - BHazardous
Replace with new the missing light fixtures at ceiling, 1st story apt 1, front room.
Apr 15, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective east base board at 2nd room from rear, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - BHazardous
§ 27-2032, 2034 adnim. code: discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system kerosene heater kitchen, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls, ceiling and trim, throughout 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range kitchen, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device, entrance doors street to building.
Apr 15, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wires ceiling bathroom, 1st story apt. #1.
Apr 15, 2004
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets shower head bathtub bathroom, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents kitchen and bathroom, 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plaster board at ceiling, 1st story apt 1 kitchen.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures 1st story apt 1.
Apr 15, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures 1st story apt 1, bathroom and kitchen.
Apr 15, 2004
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Hazardous
Failure to comply w/ an order of the commissioner to correct the condition cited in nov 34545268m for failure to comply w/ the commissionersorder to correct violation #3453588y issued on 10/04/06 for erecting
Aug 21, 2007 · Penalty $3,000
Active - Non-hazardous
Failure to comply w/commissioners order to correct violation #3453588yissued on 10/04/06 for work w/o a permit.work noted & completed:an entire 3fl was constructed at top of an existing 2 story bldg w/o a prior
Mar 4, 2007 · Penalty $1,500
Active - Non-hazardous
Work w/o a permit. work noted:3rd flr has been constructed. remedy: obtain a permit
Nov 15, 2006
Resolve - Hazardous
Work w/o a permit.hazardous.noted:a 3rd flr was built w/o a permit.approx.20ft x 12ft high x 45ft.the external walls were w/stucco & severalwindows approx. 6ft x 3ft.remedy:obtain permit or/to restore to prior
Oct 4, 2006 · Penalty $800
Active
Complaints
- Heat/hot water
Entire building
Oct 21, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1999
- Floors
- 3
- Residential units
- —
- Building area
- 4,940 ft²
- Lot area
- 1,903 ft²
- Zoning
- M1-2D
- Community board
- 307
- Council district
- 38
- Block / lot
- 797 / 49
- Assessed value
- $304,200
- Landmark / historic district
- No
Questions about 261 52 Street
Who owns 261 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is Pan Brothers Management, INC..
Does 261 52 Street have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 261 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 261 52 Street built?
City records list 1999 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.