roofy

171 34 Street

Brooklyn, NY 11232BBL 3-00684-0047Map

Owner of record: 165-167 Realty Corp

171 34 Street is a walk-up apartment building built in 1930 in Brooklyn, 11232. It has 6 residential units across 3 floors. The owner of record is 165-167 Realty Corp. HPD has recorded 47 housing violations here, most recently on May 1, 2026. 15 of the 47 most recent violations are still open.

HPD violations
47
DOB violations
6
ECB violations
14
HPD complaints
131

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 47

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • C

    Provide approved one-hour fire resistance rated self-closing door at all openings to public hall other than apt main entrance door from, 1st story

    Aug 9, 2023

    Open — Not complied with
  • C

    Provide approved one-hour fire resistance rated self-closing door with key-operated dead bolt & latch set, peep hole & chain guard at main entrance to , in the entrance located at apt 2l, 2nd story, 1st apartment from south at west

    Aug 9, 2023 · Apt 2L

    Open — Not complied with
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at window in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west

    Aug 9, 2023 · Apt 2L

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear at fire escape

    Aug 9, 2023

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at window in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Aug 9, 2023 · Apt 1L

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Aug 2, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 2, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 2, 2023

    Closed — Violation dismissed
Show 37 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 2, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Aug 2, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 2, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Jan 31, 2023 · Apt 2L

    Open — Nov sent out
  • C

    § 27-2056.4(a-1) - certify compliance with the requirement to perform one investigation for the presence of lead-based paint through xrf testing in a dwelling unit within one year after a child under age six has come to reside after august 9, 2020 by submitting the required supporting documentation for apartment located at in the entire apartment located at apt 2l

    Jan 31, 2023 · Apt 2L

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Jan 24, 2023 · Apt 2L

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Jan 24, 2023 · Apt 2L

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Jan 24, 2023 · Apt 2L

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Jan 24, 2023 · Apt 2L

    Open — Not complied with
  • B

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Jan 24, 2023 · Apt 2L

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 14, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 22, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 12, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2016

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Nov 5, 2015

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 6, 2015

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required , light fixture present

    Nov 20, 2013

    Closed — Violation closed
  • C

    Properly repair the broken or defective door lock at vestibule at public hall, 1st story

    Oct 30, 2013

    Closed — Violation closed
  • C

    Properly repair the broken or defective mortise lock at vestibule door at public hall, 1st story

    Jun 6, 2013

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required..(fixture present)

    Apr 11, 2013

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, west wall in the 5th room from east located at apt 3l, 3rd story, 1st apartment from west at north

    Apr 17, 2009 · Apt 3L

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 3rd room from east, the 4th room from east located at apt 3l, 3rd story, 1st apartment from west at north

    Apr 17, 2009 · Apt 3L

    Closed — Violation closed
  • B

    Properly repair the broken or defective lock device at front entrance door to building

    Nov 19, 2008

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 1st room from east located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 18, 2008 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 2nd room from east located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 18, 2008 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 18, 2008 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 18, 2008 · Apt 3R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the private hallway located at apt 1l, 1st story, 1st apartment from west at north

    Jan 3, 2006 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st door frame from south at west wall, north wall, south wall in the 1st kitchen from east located at apt 1l, 1st story, 1st apartment from west at north

    Jan 3, 2006 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from north at east wall, north wall, south wall, east wall, west wall in the 3rd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Jan 3, 2006 · Apt 1L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 3rd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Nov 29, 2005 · Apt 1L

    Open — Defect letter issued
  • B

    Remove all encumbrances consisting of household items scuttle closet 3 sty public hall

    Jan 20, 1999

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items 3 sty public hall

    Jan 20, 1999

    Closed — Violation closed

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2011

    Dob violation - dismissed
  • Construction other optional

    Work without a permit. work noted: having constructed partition walls and ceilings throughout cellar, rooms created at various locations at cellar, a total of 5 rms erected with wood & metal stud & sheetrock remedy: stop all work, obtain a permit if feasible or restore premises to prior legal condition

    Aug 17, 1999

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 22, 1998

    Dob violation - dismissed

ECB violations · 14

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for notice of violation #34874206y issued on 090711 pursuant to 28-204.4 & 1rcny 102-01 for

    Nov 15, 2011 · Penalty $800

    Resolve
  • Class - 1

    Failure to provide unobstructed exitr passageway.noted:@ 3rd flr of the premises 2nd exit for apt 3r blocked by boxes, hanging clothes,shopping carts,creating unsafe condition.remedy:remove obstructions.

    Sep 7, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. improper exit/exit access doorway arrangement per bc 1014.2;27-361. noted: at the 3rd fl level apt 3l side. egress is being obstructed due to public hallway

    Jan 29, 2009 · Penalty $1,200

    Resolve
  • Hazardous

    Exit door total obstruction. note at 3rd flr public hallway storage of garbage bags & furniture stored up against exit door of apartment 3l & 3r obstructing 2nd means of egress, from room or space where require

    Mar 18, 2008 · Penalty $2,500

    Resolve
  • Hazardous

    Exist passageway or corridor total obstruction note stair corridor at 3rd fl between apt 3l and 3r obstructed with construction materials and full black plastic bags blocking egress from the front of apts 3l

    Mar 3, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Eixt passageway partially obstructed. noted: bags, shoes, bicycle, & misc debris stored at 3rd fl passageway adj to apt entrance doors. remedy: remove obstruction forthwith.

    Jan 18, 2007 · Penalty $480

    Resolve
  • Hazardous

    Exit passageway/corridor: total obstruction noted: @ 3fl there were house goods placed along the corridor blocking the way going on the roofthere were 1 bicycle ,boxes, bags with shoes & clothes, chairs, etc.

    Aug 14, 2006 · Penalty $480

    Resolve
  • Hazardous

    Corridor total obstruction note:@ 3fl level the corridor is obstructedwith clothes,shoes,garage,etc blocking the 2nd means of egress for thetenant on 3rd flr.remedy:remove oobstruction & clear passageway

    Aug 3, 2006 · Penalty $480

    Resolve
  • Hazardous

    Corridor total obstruction.note:on the 3rd fl of above premise the corridor passageway which lends to the roof is totally obstructed with clothes,chair,and bags of garbage. remedy:remove obstruction.

    Jul 17, 2006 · Penalty $480

    Resolve
  • Non-hazardous

    Failure to maintain building. defect is first floor joist rotten and hanging due to water leak at bathrrom. wood floor joist rotten at cellar rear section of building at bathroom area. make all necessary

    Aug 17, 1999

    Resolve
Show 4 more ↓
  • Non-hazardous

    Work without a permit. work noted having constructed partition walls and ceilings throughout cellar rooms created at various location at cellar, a total of five rooms erected with wood and metal stud and she

    Aug 17, 1999

    Resolve
  • Non-hazardous

    32a,24a,34,49a,4b,49c,49d. no red plate, no drafstat, no relief value on tankless coil, no pigtail on presurtrol, relief must be piped down.

    Dec 19, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    36,49, (bq9)(27-147) boiler installed without permit.

    Dec 19, 1998 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain building. defect noted: inoperative dumbwaiter shaft, unsealed as per building department requirement. at third floor dumbwaiter shaft door open at time of inspection, first and second fl

    Sep 22, 1998

    Resolve

Complaints

  • Safety

    Carbon monoxide detector

    Jan 23, 2023 · Apt 2L

    Close
  • Safety

    Window guard broken/missing

    Jan 23, 2023 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jan 23, 2023 · Apt 2L

    Close
  • Safety

    Smoke detector

    Jan 23, 2023 · Apt 2L

    Close
  • Heating

    Heat related

    Jan 22, 2014 · Apt 1R

    Close
  • Heating

    Heat related

    Oct 26, 2013 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 13, 2011 · Apt 2R

    Close
  • Electric

    Electric-supply

    Oct 6, 2010 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 21, 2009 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 7, 2009 · Apt 2R

    Close
Show 40 more ↓
  • Heating

    Heat related

    Nov 30, 2009 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Nov 30, 2009 · Apt 2R

    Close
  • General

    Floor

    Nov 30, 2009 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Nov 30, 2009 · Apt 2R

    Close
  • Heating

    Heat related

    Oct 16, 2009 · Apt 1L

    Close
  • Heating

    Heat related

    Apr 14, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 13, 2009 · Apt 1L

    Close
  • Heating

    Heat related

    Mar 24, 2009 · Apt 1L

    Close
  • General

    Windows

    Mar 24, 2009 · Apt 1L

    Close
  • Plumbing

    Water supply

    Mar 1, 2009 · Apt 3R

    Close
  • Plumbing

    Water supply

    Mar 1, 2009 · Apt 3R

    Close
  • General

    Floor

    Mar 1, 2009 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Mar 1, 2009 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Windows

    Feb 28, 2009 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Cooking gas

    Feb 28, 2009 · Apt 3R

    Close
  • Electric

    Wiring

    Feb 28, 2009 · Apt 3R

    Close
  • Electric

    Wiring

    Feb 28, 2009 · Apt 3R

    Close
  • Electric

    Lighting

    Feb 28, 2009 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Floor

    Feb 28, 2009 · Apt 3R

    Close
  • Plumbing

    Water supply

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Doors

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Floor

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Cabinet

    Feb 28, 2009 · Apt 3R

    Close
  • Plumbing

    Radiator

    Feb 28, 2009 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Feb 28, 2009 · Apt 3R

    Close
  • Plumbing

    Radiator

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Doors

    Feb 28, 2009 · Apt 3R

    Close
  • General

    Doors

    Feb 28, 2009 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    Feb 27, 2009 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Feb 27, 2009 · Apt 3R

    Close
  • General

    Windows

    Feb 27, 2009 · Apt 3R

    Close
  • Plumbing

    Water supply

    Feb 27, 2009 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Feb 27, 2009 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Feb 27, 2009 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Feb 27, 2009 · Apt 3R

    Close
  • General

    Floor

    Feb 27, 2009 · Apt 3R

    Close
  • General

    Mold

    Feb 27, 2009 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1930
Floors
3
Residential units
6
Building area
4,600 ft²
Lot area
2,504 ft²
Zoning
M1-2D
Community board
307
Council district
38
Block / lot
684 / 47
Assessed value
$569,700
Landmark / historic district
No

HPD registration #328577, last renewed Sep 24, 2025.

Questions about 171 34 Street

Who owns 171 34 Street?

The owner of record in NYC Department of City Planning PLUTO data is 165-167 Realty Corp.

Does 171 34 Street have violations?

Yes. NYC HPD has recorded 47 housing violations at this property.

Is 171 34 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 171 34 Street built?

City records list 1930 as the year it was built.

How many apartments are in 171 34 Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.