530 President Street
Brooklyn, NY 11215BBL 3-00448-0013Map
Owner of record: Pds Carroll Street LLC
530 President Street is an office building built in 1923 in Brooklyn, 11215. The owner of record is Pds Carroll Street LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 31
- ECB violations
- 29
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 31
- Construction other optional
The dob hereby orders you to stop all work under job #322011470 due to contractor withdrawal
May 18, 2020
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job #322011470 due to contractor withdrawal
May 18, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2008
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jul 2, 2008
Dob violation - resolved
Show 21 more ↓
- Construction other optional
C-construction other optional
Jan 23, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2004
Dob violation - resolved - Elevator elevatorrequired
3p7901
Aug 15, 2001
Dob violation - resolved - Elevator elevatorrequired
3p7902
Aug 15, 2001
Dob violation - resolved - Elevator elevatorrequired
3p7902
Jul 17, 2000
Dob violation - resolved - Elevator elevatorrequired
3p7901
Jul 17, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 28, 1993
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
May 18, 1993
Vp-violation unserved ecb-active - Boiler boiler optional
B-boiler boiler optional
May 18, 1993
Vp-violation unserved ecb-active - Boiler boiler optional
B-boiler boiler optional
May 18, 1993
Vp*-violation unserved ecb- dismissed
ECB violations · 29
- Class - 2
28-116.2.3;failure to provide an adequate inspection program tr-3 (concrete design misc)as noted :at time of inspection on an active job site observed ramp to the cellar about to be cast with concrete without a
Jun 21, 2019
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at time of inspection on an active jobsite,observed uncapped rebars at various locations throughout site,creating impacement haza
Apr 4, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to maintain/display on-site documents required by bc chapter 33(no design drawing for ramp/egress). at time of inspection on an active jobsite,observed makeshift ramp build of lumber & plywoods installe
Apr 4, 2019
Resolve - Class - 1
Failure to instutite/maintain safety equipment measures or temporary construction-no guardrails at time of inspection on an active jobsite,observed guardrails missing at 1st fl level,along the leading edge of
Apr 4, 2019 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time of inspection observed ramp installed at excavation/foundation area contrary to ssp-003.00 foundation plan of site safet
Apr 4, 2019 · Penalty $250
Resolve - Class - 1
Sec. 3304.7 required means of egress. at time of inspection on an active jobsite,observed worker present actively working in an excavated area between timber lagging(soe)& foundation wall at exp#1,approx 15ft
Apr 4, 2019 · Penalty $2,500
Resolve - Class - 1
Sec: bc 3313.1, 3301.1.2. failure to comply w/ nyc fire code- general:no permit for oxygen,acetylene- use & storage @ job site. @ time of insp of a new 8 story bldg under construction @ file during stage, activ
Jun 13, 2018 · Penalty $625
Resolve - Class - 2
Construction superintendent fails to maintain job site logs. @ time of insp of a 8 story new bldg under construction @ piles installation stage, active job site, upon request for the construction superintendent
Jun 13, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to provide unobstructed exit passageway. @ time of insp of a new 8 story bldg under construction @ pile drying stage, active job site, observed that there was an obstructed passageway from means of egre
Jun 13, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to provide guard rail system 3'-6' high @ open & accessible sides of excavation. @ time of insp of a new 8 story bldg @ pile drying stage, active job site, observed that there were no protection provide
Jun 13, 2018 · Penalty $2,500
Resolve
Show 19 more ↓
- Class - 1
Work does not conform to approved construction documents and or approved amendments as noted at time of inspection on an active constructionsite observed at exposure # 4 excavation below foundation of adjacent
Feb 13, 2018 · Penalty $400
Resolve - Class - 2
Work doe snot conform to approved construction documents and or apprved amendments.premises under alt 2 job#320127947 permit exp.03-28-14.attime of inspection found:1 layout of partition and or configuration of
Sep 15, 2017 · Penalty $500
Resolve - Class - 2
40m07,16m07. 40m/16m-provide keys for proper dob inspection.
Apr 7, 2015
Resolve - Class - 2
40m07,16m07 provide keys for proper dob inspection.
Apr 7, 2015
Resolve - Class - 2
17d06/ 12x10/ 37v02/ 32h11/ 08v01/ 71j01/ 70q03/ 70m07/ 10j01/ 40p16/ 17d secure where needed 32m worn car shoes 08v adjust where needed 71j mount switch at entrance to hatch 70q sump pump 70m ladder 10j adjust
Oct 21, 2011
Resolve - Class - 2
70m07/ 52b14/ 70q03/ 08v01/ 17h11/ 17d06/ 39y02/ 40p16/ 70m ladder 52bshorten 70q sump pump 08v where needed 17h,s where needed 40p provide immediate 24/7 access to all equipment
Oct 21, 2011
Resolve - Class - 3
Occupancy contrary to that allowed by the cert of occupancy or dob records.note:cert of occupancy#168724 dated 12/22/59 indicate bldg to be occupied as factory @ bsmnt factory & office @ 1st,2nd,3rd flr.@ time
Mar 8, 2011 · Penalty $200
Resolve - Non-hazardous
1b10/2b10/5j1/8j1/10m7/10h11/17h11/28m7/38m7/40m7/84l10/55y13/55e10/41g7/41n7/85m5/86m5/64x10/66o2/71x10/74b14/84x10/.1b-alarm bell inaudible.2b-stop switch inaudible.5j-adjust car door to reduce gap.8j-adjust
May 31, 2007 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is: bottom of water tank on the roof is leaking (water is dripping heavily). remedy- repair defect.
May 15, 2007 · Penalty $2,500
Resolve - Non-hazardous
50a 50b 32a cyclotherm 1984 n.b. 16309 50a reverse the valves on the bottom blowdown line so that the quick closing valve is closest to the boiler followed by the slow opening valve. 50b add a quick opening
Mar 23, 2005
Resolve - Non-hazardous
50a 50b 1984 cyclotherm natl bd 16270 50a pipe safety valve to a safe point. 50b add a quick closing valve to the glass drain and pipe into the drain line.
Mar 23, 2005
Resolve - Non-hazardous
50a 50b 50c 1984 cyclotherm natl bd 16311 50a install a quick opening valve to the glass drain and pipe into water column drain line 50b draft stat is loose. 50c seal flue pipe to chimney.
Mar 22, 2005
Resolve - Non-hazardous
75u,74t. provide city id in mr equiptment.
Nov 20, 1998
Resolve - Non-hazardous
18a,18b,
May 1, 1996 · Penalty $175
Resolve - Non-hazardous
6b, 6b boiler has steam generating capacity of 2070 ibs/hr where as existing safety valve has a relieving capacity of 1223 lbs/ hr the later be replaced by new one with at least the capacity of the boiler or mo
May 1, 1996 · Penalty $175
Resolve - Hazardous
Failure to maintain exterior building wall defect is brick parapet at front facade (located at east) is leaning and pulling away for approx 25'-0" feet in length, with defective cement stucco. remedy- provide a
May 5, 1994 · Penalty $800
Resolve - Non-hazardous
32 no blow down valves on boiler remove plug replace with pet cock valve sight glass.
May 18, 1993
Resolve - Non-hazardous
32.
May 18, 1993
Resolve - Non-hazardous
35o,53x
Mar 18, 1992
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 1923
- Floors
- 3
- Residential units
- —
- Building area
- 101,395 ft²
- Lot area
- 34,231 ft²
- Zoning
- M1-4
- Community board
- 306
- Council district
- 39
- Block / lot
- 448 / 13
- Assessed value
- $5,265,000
- Landmark / historic district
- No
Questions about 530 President Street
Who owns 530 President Street?
The owner of record in NYC Department of City Planning PLUTO data is Pds Carroll Street LLC.
Does 530 President Street have violations?
NYC HPD has no housing violations on record for this property.
Is 530 President Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 530 President Street built?
City records list 1923 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.