66 Bergen Street
Brooklyn, NY 11201BBL 3-00384-0037Map
Owner of record: 68 Bergen LLC
66 Bergen Street is a store building built in 1931 in Brooklyn, 11201. It has 3 residential units across 2 floors. The owner of record is 68 Bergen LLC. HPD has recorded 30 housing violations here, most recently on May 8, 2026. 12 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 21
- ECB violations
- 11
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox that is missing at public hall, 1st story
May 8, 2026
Open — False certification - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings that is missing
May 8, 2026
Open — False certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
May 8, 2026
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
May 8, 2026
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story
May 8, 2026
Open — False certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 8, 2026
Open — False certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed
Show 20 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 21, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 7, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Jun 8, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 7, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2015
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes front of building (flower pots)
Oct 21, 2011
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 21, 2011 · Apt 2C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling(approx. 1 sq ft.) in the 3rd room from north located at apt 2c, 2nd story, 2nd apartment from east at south
Oct 21, 2011 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt 1, 2nd story, 1st apartment from north at east
Oct 2, 2010 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water 166 degrees to all water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Oct 2, 2010 · Apt 1
Open — Nov sent out - BHazardous
Section 27-2032, 2034 adnim. code: discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system ... in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Oct 2, 2010 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose handrail at public hall stairs, 1st story
Sep 9, 2010
Open — Nov sent out
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - active
Show 11 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
Stop all work,obtain a permit
Sep 2, 2010
Vw*-violation - work w/o permit dismissed - Construction other optional
Obtain a valid certificate of occupancy,discontinue illegal use
Sep 2, 2010
Vp*-violation unserved ecb- dismissed - Construction other optional
Failure to provide approved plans at site to show column footings, ste el connection details or existing joist modification, & repairs where bearing walls were removed remedy: stop all work, shore weakened structure, install guardrails, make site safe
Jul 30, 2009
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to have new or altered plumbing system tested i observed in super laundry store fist floor new gas fittings and gas pipe going to new hot water heater with out being inspected and tested also i observe
May 5, 2019 · Penalty $12,500
Active - Class - 1
Work without a permit i observed in super laundry first floor gas hot water heater installed and heater with no permits on file , obtain permit
May 5, 2019 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code-compliant manner i observed in super laundry store first floor having a future on gas line by the hot water heater area also on the heater using galvanize union on gas line
May 5, 2019 · Penalty $6,250
Active - Class - 3
Work w/o a permit. awning approx 12ft wide x 6ft overhang w.inscription numero 28 pizzeria & cucina installed w/o a permit. remedy: comply w/notice of violation.
Feb 2, 2016 · Penalty $500
Active - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob respondent failed to correct & certify correction the violatingconditions noted in nov#34888653n pursuant to 28-204.2 rem: file cert
Jan 19, 2011 · Penalty $400
Active - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob respondent failed to correct & file a cert of correction for nov#348886522 pursuant to 28-204.2 rem: file a cert of corrections
Jan 19, 2011 · Penalty $400
Active - Class - 1
Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov 34873837x for altered bldg occupied w/o a valid c/o, bldg altered under job #310220098
Nov 9, 2010 · Penalty $2,400
Resolve - Class - 1
Altered/changed bldg occupied w/o a valid c/o as per 28-116.3.1-28-118.3.2. noted: above premises altered under job #310220098, job not signed off. no new c/o issued. bldg currently occupied. remedy: obtain
Nov 9, 2010 · Penalty $1,000
Resolve - Class - 1
Altered bldg occupied w/o a valid cert of occupancy.bldg altered underalt #310220098 is now occupied as a laundromat & restaurant at 1st fl & 3 class "a" unit @ 3rd fl w/o a valid cert of of occupancy.rem:obtai
Sep 2, 2010 · Penalty $5,000
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid cofo as per 28-118.3.1-28-118.3.2 noted:@ 2nd flr observed apt '2' to be occupied w/o sign-off theappl#31022098 to converted 2nd flr to residential use from storage
Mar 2, 2010 · Penalty $500
Resolve
Show 1 more ↓
- Non-hazardous
Failure to maintain building defect is floor sagging in bathroom of second floor rear apartment, due to rotted joists. remedy: provide temporary shoring immediately file plans and obtain permits for joist repla
May 12, 1997 · Penalty $350
Resolve
Complaints
- Paint/plaster
Ceiling
Apr 27, 2026 · Apt 2A
Close - Water leak
Heavy flow
Apr 27, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Apr 27, 2026 · Apt 2A
Close - Water leak
Heavy flow
Jan 6, 2018 · Apt 2C
Close - General
Mold
Sep 15, 2011 · Apt 2C
Close - Plumbing
Water-leaks
Sep 15, 2011 · Apt 2C
Close - Heating
Heat related
Dec 3, 2010 · Apt 1
Close - Heating
Heat related
Dec 3, 2010 · Apt 1
Close - Heating
Heat related
Nov 9, 2010 · Apt 1
Close - Heating
Heat related
Nov 3, 2010 · Apt 1
Close
Show 10 more ↓
- Plumbing
Water-leaks
Sep 9, 2010 · Apt 1
Close - Plumbing
Water supply
Sep 9, 2010 · Apt 1
Close - General
Stairs
Sep 9, 2010 · Apt 1
Close - Paint/plaster
Ceiling
Sep 9, 2010 · Apt 1
Close - Plumbing
Water-leaks
Sep 9, 2010 · Apt 1
Close - General
Stairs
Sep 8, 2010 · Apt 1
Close - Plumbing
Water supply
Sep 7, 2010 · Apt 1
Close - Plumbing
Water-leaks
Sep 7, 2010 · Apt 1
Close - Paint/plaster
Ceiling
Sep 7, 2010 · Apt 1
Close - Plumbing
Water supply
Jul 17, 2010 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1931
- Floors
- 2
- Residential units
- 3
- Building area
- 8,579 ft²
- Lot area
- 4,029 ft²
- Zoning
- R6A
- Community board
- 302
- Council district
- 33
- Block / lot
- 384 / 37
- Assessed value
- $869,400
- Landmark / historic district
- No
HPD registration #383221, last renewed Sep 11, 2025.
Questions about 66 Bergen Street
Who owns 66 Bergen Street?
The owner of record in NYC Department of City Planning PLUTO data is 68 Bergen LLC.
Does 66 Bergen Street have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 66 Bergen Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 66 Bergen Street built?
City records list 1931 as the year it was built.
How many apartments are in 66 Bergen Street?
It has 3 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.