roofy

426 Clinton Street

Brooklyn, NY 11231BBL 3-00350-0028Map

Owner of record: Samperisi, Alba

426 Clinton Street is a walk-up apartment building built in 1920 in Brooklyn, 11231. It has 8 residential units across 4 floors. The owner of record is Samperisi, Alba. HPD has recorded 406 housing violations here, most recently on October 19, 2026. 39 of the 50 most recent violations are still open.

HPD violations
406
DOB violations
19
ECB violations
10
HPD complaints
301

What to know

Concern
25 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 406

  • C

    M/d law abate the nuisance consisting of scalding hot water of 147 degrees at the wash basin in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south

    Oct 19, 2026 · Apt 3L

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches at basement

    Oct 19, 2026

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at unalived rats at basement

    Oct 19, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls at basement

    Oct 19, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling and all walls at basement

    Oct 19, 2026

    Open — Nov sent out
  • B

    Properly repair the broken or defective paving concrete paving at basement

    Oct 19, 2026

    Open — Nov sent out
  • B

    Properly repair the broken or defective paving concrete paving at boiler room

    Oct 19, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Oct 19, 2026 · Apt 3L

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • B

    Replace with new the missing escutcheon plate at riser pipe in the bathroom located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective window balance lower sash, offset 1 window at east wall in the 1st room from east located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom system in the entrance located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south

    Oct 1, 2026 · Apt 1L

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroom located at apt 4l, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    May 19, 2026 · Apt 1L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar

    Jan 24, 2026

    Open — Nov sent out
  • C

    Repair the broken or defective connection riser pipe at ceiling at cellar

    Jan 24, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door entrace at public hall, 1st story

    Jan 24, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance at upper and lower window sash at south in the 5th room from east located at apt 1l, 1st story, 1st apartment from south at west

    Jan 17, 2026 · Apt 1L

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at upper and lower window sash at west in the 5th room from east located at apt 1l, 1st story, 1st apartment from south at west

    Jan 17, 2026 · Apt 1L

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 13, 2026

    Open — Nov certified late
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Jan 13, 2026 · Apt 2L

    Open — Nov certified late
  • C

    Provide ready access to buildings heating system door locked at basement

    Jan 12, 2026

    Open — Nov certified late
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Jan 12, 2026 · Apt 1L

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Jan 7, 2026 · Apt 1L

    Open — Invalid certification
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Jan 7, 2026 · Apt 1L

    Open — Invalid certification
  • C

    Provide ready access to buildings heating system door locked at cellar

    Jan 7, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Jan 6, 2026 · Apt 2L

    Open — Nov certified late
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 6, 2026

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. yard, section ''front''

    Jan 6, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective leaking shut-off valve at radiator at public hall, 1st story

    Jan 6, 2026

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Jan 2, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar

    Dec 29, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt 1L

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Dec 29, 2025 · Apt 1L

    Open — Nov sent out
  • B

    Refit door at building front entrance at public hall, 1st story

    Nov 14, 2025

    Open — Not complied with
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, all components, all stories at building front at fire escape

    Nov 14, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the fire escape at the front of the building

    Jul 20, 2023

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story

    Jul 19, 2023

    Closed — Violation closed
  • C

    Fire escape defective. properly secure the broken slat at 2nd story stacks at front of building

    Jul 18, 2023 · Apt 1R

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective masonry spalling from ground to 1st sty at front of building

    Jul 18, 2023 · Apt 1R

    Open — First no access to re- inspect violation
  • C

    Properly repair the broken or defective paving at front areaway

    Jul 18, 2023 · Apt 1R

    Open — First no access to re- inspect violation
  • B

    Remove all encumbrances consisting of bicycles locked up on hand rail at public hall, 2nd story

    Aug 5, 2022

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold iutems being stored at public hall, 1st story

    Aug 5, 2022

    Closed — Violation closed

DOB building violations · 19

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 14, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
Show 9 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - active
  • Plumbing none

    P-plumbing none

    May 31, 1989

    Dob violation - active

ECB violations · 10

  • Class - 1

    Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 39025856l issued on 7/24/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. (failur

    Feb 6, 2024

    Resolve
  • Class - 2

    Observed at 830 am on 7/24/20 electrical conduit was ran off of a hallway lighting fixture supplying power to a smoke detector and emergency lighting fixture on floors 1-4. dept records show no permit was filed

    Jul 24, 2020 · Penalty $400

    Active
  • Class - 1

    Observed at 830 am on 7/24 /20 floors 1-3 the hallway lighting fixtures were hanging down and unsecured due to unauthorized , unsafe , unsuitable electrical work in which a power source was taken from the light

    Jul 24, 2020 · Penalty $1,600

    Active
  • Class - 2

    Steam pipe leaking outside boiler room door-debris in boiler room-both hwh's are missing safety discharge pipes-unused oil tank not legally abandoned

    Mar 4, 2019

    Resolve
  • Class - 2

    As per class 2 (b254) 28-301.1 50. weil mclain boiler model #e6h 105, series 4, btu input 450,000 not registered with the dob register boiler nd submit a certificate of correction.

    Feb 28, 2017 · Penalty $1,250

    Resolve
  • Class - 2

    As per class 2 (b265) 28-303.7 failure to file a complete boiler in spection report as per dob records. submit a current b09 report.

    Feb 28, 2017 · Penalty $1,250

    Resolve
  • Hazardous

    3bd/50b/50c/b4b/50c/20ab/50d/51 50a ash accuncication at chimney base ocean out opening 50b-evidence of soot/ash congestion of flue pipe smokebox and chimney provide certified chimney sweep & inspection report

    Feb 26, 2004 · Penalty $2,500

    Active
  • Non-hazardous

    19b 32a 49 49)no draftshat on boiler.oil fired-fitzgibbons-steam boiler.

    Sep 11, 2000 · Penalty $2,500

    Active
  • Non-hazardous

    Failure to maintain. defects are: defective support columns supportingfloor joist at cellar area, rotted, split causing rear first floor of rear apartment to sag. open ceiling sections of cellar area thru out.

    Oct 21, 1999 · Penalty $2,500

    Active
  • Hazardous

    19b,21b,32a,34b/41a,36/48b,49/51. must provide r1 for welded patches, must install or filter on fuel or line, must install discharge pipe on safety valve, must install discharge pipe on low water cut off contro

    Oct 13, 1999 · Penalty $2,500

    Active

Complaints

  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt 3L

    Close
  • General

    Janitor/super

    Oct 18, 2026 · Apt 2L

    Open
  • Plumbing

    Toilet

    Oct 11, 2026 · Apt 1L

    Open
  • General

    Janitor/super

    Oct 6, 2026 · Apt 4R

    Open
  • Unsanitary condition

    Pests

    Oct 6, 2026 · Apt 4L

    Open
  • Water leak

    Damp spot

    Sep 27, 2026 · Apt 4L

    Close
  • Water leak

    Heavy flow

    Sep 26, 2026 · Apt 4L

    Close
  • Electric

    No lighting

    Sep 26, 2026 · Apt 4L

    Close
  • General

    Bell/buzzer/intercom

    Sep 26, 2026 · Apt 4L

    Close
  • Plumbing

    Bathtub/shower

    Sep 26, 2026 · Apt 4L

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Sep 17, 2026 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Sep 6, 2026 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Aug 20, 2026 · Apt 4L

    Close
  • Electric

    No lighting

    Aug 20, 2026 · Apt 4L

    Close
  • Water leak

    Damp spot

    Aug 20, 2026 · Apt 4L

    Close
  • General

    Janitor/super

    Jul 14, 2026 · Apt 1L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 1L

    Close
  • Door/window

    Window frame

    Jan 29, 2026 · Apt 1L

    Close
  • Water leak

    Damp spot

    Jan 29, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt 1L

    Close
  • Water leak

    Damp spot

    Jan 26, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt 1L

    Close
  • Door/window

    Window frame

    Jan 15, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2026 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 31, 2025 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2025 · Apt 4R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 7, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 13, 2023 · Apt 1R

    Close
  • Outside building

    Pavement

    Jul 13, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Feb 17, 2023 · Apt 4R

    Close
  • Electric

    Wiring

    Jul 28, 2022 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Jul 28, 2022 · Apt 1L

    Close
  • General

    Bell/buzzer/intercom

    Jul 28, 2022 · Apt 1L

    Close
  • Water leak

    Slow leak

    Jul 27, 2022 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jul 27, 2022 · Apt 1L

    Close
  • Water leak

    Heavy flow

    May 27, 2021 · Apt 3R

    Close
  • Unsanitary condition

    Mold

    Oct 23, 2020 · Apt 3L

    Close
  • Door/window

    Door

    Oct 19, 2020 · Apt 1L

    Close
  • Water leak

    Slow leak

    Dec 22, 2018 · Apt 4R

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2018 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
4
Residential units
8
Building area
8,664 ft²
Lot area
2,700 ft²
Zoning
R6A
Community board
306
Council district
39
Block / lot
350 / 28
Assessed value
$2,781,450
Landmark / historic district
No

HPD registration #344599, last renewed Aug 23, 2025.

Questions about 426 Clinton Street

Who owns 426 Clinton Street?

The owner of record in NYC Department of City Planning PLUTO data is Samperisi, Alba.

Does 426 Clinton Street have violations?

Yes. NYC HPD has recorded 406 housing violations at this property.

Is 426 Clinton Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 426 Clinton Street built?

City records list 1920 as the year it was built.

How many apartments are in 426 Clinton Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.