320 Court Street
Brooklyn, NY 11231BBL 3-00333-0038Map
Owner of record: Usd 320 Court LLC
320 Court Street is a mixed residential and retail building built in 1900 in Brooklyn, 11231. It has 4 residential units across 3 floors. The owner of record is Usd 320 Court LLC. HPD has recorded 19 housing violations here, most recently on April 13, 2010.
- HPD violations
- 19
- DOB violations
- 18
- ECB violations
- 28
- HPD complaints
- 47
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- ANon-hazardous
Replace with new the missing door lock at front areaway, 1st story
Apr 13, 2010
Closed — Violation closed - CImmediately hazardous
Provide seal up at 2 nd story east 1 apt.
Jan 26, 2006
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs landing and floors at all stories public hall
Jan 26, 2006
Closed — Violation closed - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 3l
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 3l, 3rd story, apartment at south
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical light fixture at ceiling in the 1st room from east at south located at apt 3l, 3rd story, apartment at south
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell/buzzer-intercom system from apt # 3l to panel at building front
Jan 3, 2006
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the 2nd room from east at north located at apt 3l
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures no volume, in the bathroom located at apt 3l, 3rd story, apartment at south
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures no volume in the bathroom located at apt 3l, 3rd story, apartment at south
Jan 3, 2006 · Apt 3L
Closed — Violation closed
Show 9 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt 3l, 3rd story, apartment at south
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair the broken or defective defective spark arrester, flue pipe at roof
Jan 3, 2006
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the dirt and grime all stories at public hall
Jan 3, 2006
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3l
Jan 3, 2006 · Apt 3L
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 1, 3rd story, apartment at west
Aug 19, 2005 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell from entrance to building to ... in the entire apartment located at apt 1, 3rd story, apartment at west
Aug 19, 2005 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1, 3rd story, apartment at west
Aug 19, 2005 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1, 3rd story, apartment at west
Aug 19, 2005 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 3rd story, apartment at west
Aug 19, 2005 · Apt 1
Closed — Violation closed
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
C-construction other optional
Jan 16, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed
Show 8 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2011
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction documents and/or approv al amendedments at time of inspection i did observe on 1st floor the a lteration of the doors & windows that being made wider shorter taller brick work instalation of brick work fence photos s-p 9140905,907,922, 904,906 conform to approval accepted plans or amendments provid struct
Sep 15, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 28
- Class - 2
Failure to sign off permitted job as required by department of building (dob). dob record shows that work under job # 321627174, 321942010, 310116816, 302257313, 302072842 not signed off.; 28-116.4.;; 28-116.4,
Jul 27, 2023 · Penalty $6,250
Active - Class - 2
As per class 2 (b265) 28-303.7 failure to file a complete boiler in spection report as per dob records. submit a current b09 report.
Feb 28, 2017
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at time of inspection fixed air condition window unit,at 3rd fl on sackett st side of bldg,blocking exit passageway for fire escape. remedy: remove obstru
Oct 3, 2013 · Penalty $2,000
Resolve - Class - 1
Work w/o a permit - work noted: at 2nd fl level (1) approx 90% of 2nd fl subfloor has been removed & replace w/metal deck & wire mesh. (2) 2steel support columns for 3rd fl subflooring has been cut & removed.
Aug 22, 2013 · Penalty $1,600
Resolve - Class - 1
Sec. 1001.1 failure to provide required means of egress. noted: 3 story mix use bldg w/fire escape located at rear section of exposures. however 3rd fl apt 3r room openings to fire escape window has been boarde
Aug 22, 2013 · Penalty $1,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted existing fire escape landing located at rear section of bldg exposure 2 for apt 3l. there is a room being used as sleeping quarters. however a fixed ac uni
Aug 22, 2013 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dept of building. construction plywood fence,approx 90ft long court sackett st w/o a permit & w/a notes of violation #061611cstfkk01 & ecb #34917651j.
Oct 1, 2011 · Penalty $800
Resolve - Class - 2
Failure to post"no smoking"signs at constrution/demo site in violation of n.y.c.fire code.at time of inspec.i did observe no "no smoking"signs posted at site.when brought to attention of forman he then posted 1
Sep 15, 2011 · Penalty $800
Resolve - Class - 3
Being used avio.failure to provide required flagman when intermittent operations on or across, areas open to public is occurring.@ time of inspec.i had reported to me by two pedestrians dangerious removal of s
Sep 15, 2011 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by constuction operations.at time of inspec.i did observe at the court st. exposure a hispanic male worker place a ladder that was approx. 6'ft. in height ag
Sep 15, 2011 · Penalty $1,200
Resolve
Show 18 more ↓
- Class - 1
Work w/o permit at time of inspec.i did observe a construction fence installed on the court st. & sackett st. exposures w/no permit obtainedby dob.this is a recurring condition ecb34917651j dated 06-16-2011 27-
Sep 15, 2011
Resolve - Class - 3
2109.7.3misc.vio.failure to provide anchorage of flr joist to masonary walls. at time of inspec. while viewing plans i did observe no indication of joist anchorage into the masonry wall. photo.remedy:provide pr
Sep 15, 2011
Resolve - Class - 2
Failure to post permit for work at premise.at time of inspec.i did observe no permit posted at any area of the enclosed site.remedy:post pemit.
Sep 15, 2011 · Penalty $800
Resolve - Class - 2
Failure to provide/post sign(s) at job site pursuant to subsection.@ time of inspec.i did observe a construction fence constructed on the court st. & sackett st. frontage, neither exposures had a construction s
Sep 15, 2011 · Penalty $800
Resolve - Class - 3
1704.1.1misc.vio.failure to file a special inspection statement of responsibility prior to permit issuance & prior to start of work under special inspection requirement.@ time of inspec.i did observe in dob fil
Sep 15, 2011 · Penalty $300
Resolve - Class - 1
Unsafe storage of combustible material & equipment.at time of inspec.i did observe at exp#2 behind osb(oriented stand board)combustible fence the storage of combustible debris & material.i asked forman what it
Sep 15, 2011 · Penalty $2,400
Resolve - Class - 3
Failure to provide 3'ft.6"inch guardrail or equivalent around all flr & perimeter openings.at time of inspection i did observe at 1st flr level a stair well approx.7-8' in depth without any guardrails photo.rem
Sep 15, 2011 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construciton operations.at time of inspec.i did observe no fire extingushers posted at any location on 1st flr & basement. this condition was reported to
Sep 15, 2011 · Penalty $1,200
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34917651j issued on6/16/11. remedy: comply w/the commissioner's order.
Aug 2, 2011 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit.noted:erected construction fence,approx 90lfx12fthigh along court st & sackett st w/o a permit.note:job is 100%complete.rem:obtain permit or restore premises to prior legal condition
Jun 16, 2011 · Penalty $1,600
Resolve - Hazardous
Filing a false certification w/the nyc dept of bldg.pursuant to section 26-126 respondent filed a certificate of correction for nov #34507892z on february 20,2008.an inspection conducted on march 18,2008 which
Mar 18, 2008
Resolve - Hazardous
B4b/50a/32a/50b. (50a)flue pipe not properly sealed to chimney. 50b holes in boiler room walls and ceiling.
Jan 30, 2006 · Penalty $800
Resolve - Hazardous
B4b/50a. (50a)illegal insterlation of a domestic hot water heater in the open kitchen (gas fired)
Jan 30, 2006 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. note: vertical crack in front facade wall, at 1st story north approximate one eight wide, from gradelevel to approximate 10 ft long; also hair line cracks observed over e
Jan 18, 2006 · Penalty $350
Resolve - Hazardous
Failure to comply with stop work order. noted stop work order # 123005c06mp02 for work w/o as permit at 1st flr stope and apt on 2nd flr. now the flr joist have been removed on 2nd flr apt. stop all work forthw
Jan 9, 2006 · Penalty $1,500
Resolve - Non-hazardous
Work contrary to stop work order. noted: work ongoing at 1st floor store front contrary to stop work order 123065c06mp02 for work without a permit and stop work order 010906c06mp01 for failure to comply with
Jan 3, 2006 · Penalty $5,000
Resolve - Hazardous
Work w/o a permit. noted: (1) 1st fl removal of firestopping from ceiling, demo. of fl & partitions. (2) 2nd fl installation of hotwater heater, baseboard heating, electrical panel & outlets. also noted bldg. i
Dec 30, 2005 · Penalty $800
Resolve - Hazardous
Occupancy contrary to that allowed by the certificate of occupancy #52012 of 08/08/1928. noted: the second floor now changed from office use, to two dwelling units each with kitchen with gas stove and full
Oct 19, 2005 · Penalty $800
Resolve
Complaints
- Plumbing
Water supply
Dec 5, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 8, 2018 · Apt 3L
Close - General
Mold
Sep 17, 2011 · Apt 3R
Close - Paint/plaster
Ceiling
Sep 17, 2011 · Apt 3R
Close - Paint/plaster
Ceiling
Sep 17, 2011 · Apt 3R
Close - Plumbing
Water-leaks
Sep 17, 2011 · Apt 3R
Close - Plumbing
Water supply
Jun 3, 2011 · Apt 3R
Close - Plumbing
Water supply
Jun 3, 2011 · Apt 3R
Close - Plumbing
Water supply
Jun 3, 2011 · Apt 3R
Close - General
Doors
Apr 12, 2010 · Apt 3L
Close
Show 37 more ↓
- General
Locks
Apr 12, 2010 · Apt 3L
Close - Plumbing
Water supply
Feb 24, 2007 · Apt 3L
Close - Heating
Heat related
Feb 24, 2007 · Apt 3L
Close - General
Stairs
Jul 25, 2006 · Apt 3L
Close - Nonconst
Vermin
Jul 25, 2006 · Apt 3L
Close - Nonconst
Rubbish
Jul 25, 2006 · Apt 3L
Close - Electric
Bell-buzzer/intercom
Jul 25, 2006 · Apt 3L
Close - General
Stairs
Jul 25, 2006 · Apt 3L
Close - Paint/plaster
Ceiling
Jul 25, 2006 · Apt 3L
Close - Plumbing
Water-leaks
Jul 25, 2006 · Apt 3L
Close - Plumbing
Water supply
Jan 20, 2006 · Apt 3L
Close - Heating
Heat related
Jan 12, 2006 · Apt 3L
Close - Electric
Bell-buzzer/intercom
Dec 28, 2005 · Apt 3L
Close - General
Doors
Dec 28, 2005 · Apt 3L
Close - Electric
Lighting
Dec 28, 2005 · Apt 3L
Close - Electric
Lighting
Dec 28, 2005 · Apt 3L
Close - Paint/plaster
Ceiling
Dec 28, 2005 · Apt 3L
Close - General
Floor
Dec 28, 2005 · Apt 3L
Close - Plumbing
Water supply
Dec 28, 2005 · Apt 3L
Close - Plumbing
Basin/sink
Dec 28, 2005 · Apt 3L
Close - Plumbing
Water supply
Dec 28, 2005 · Apt 3L
Close - Plumbing
Basin/sink
Dec 28, 2005 · Apt 3L
Close - Electric
Bell-buzzer/intercom
Dec 16, 2005 · Apt 1
Close - Electric
Lighting
Dec 16, 2005 · Apt 1
Close - Nonconst
Rubbish
Dec 16, 2005 · Apt 1
Close - General
Doors
Dec 16, 2005 · Apt 1
Close - Plumbing
Basin/sink
Dec 16, 2005 · Apt 1
Close - Paint/plaster
Wall
Aug 22, 2005 · Apt 2
Close - Paint/plaster
Ceiling
Aug 22, 2005 · Apt 2
Close - Heating
Heat-plant
Aug 10, 2005 · Apt 1
Close - Nonconst
Rubbish
Aug 10, 2005 · Apt 1
Close - Electric
Lighting
Aug 10, 2005 · Apt 1
Close - Electric
Bell-buzzer/intercom
Aug 10, 2005 · Apt 1
Close - Plumbing
Water supply
Aug 10, 2005 · Apt 1
Close - Electric
Wiring
Aug 10, 2005 · Apt 1
Close - Electric
Wiring
Aug 10, 2005 · Apt 1
Close - Heating
Heat related
Jul 29, 2004 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1900
- Floors
- 3
- Residential units
- 4
- Building area
- 6,000 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 39
- Block / lot
- 333 / 38
- Assessed value
- $1,580,850
- Landmark / historic district
- No
HPD registration #816413, last renewed Oct 2, 2025.
Questions about 320 Court Street
Who owns 320 Court Street?
The owner of record in NYC Department of City Planning PLUTO data is Usd 320 Court LLC.
Does 320 Court Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 320 Court Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 320 Court Street built?
City records list 1900 as the year it was built.
How many apartments are in 320 Court Street?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.