222 Court Street is a mixed residential and retail building built in 1854 in Brooklyn, 11201. It has 2 residential units across 3 floors. The owner of record is John Mc Fadden. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 10
- ECB violations
- 9
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Failure to comply w/the commissioner's order 340789(070822feu30608zt) dated 07/08/22 requiring the owner to start bldg repairs under permit for the facade damages. as of 09/16/22 there are no jobs filed in dob now or bis to repair the bldg. remedy: immed comply w/the comm order 340789(070822feu30608zt)to repair the bldg under permit
Sep 16, 2022
Dob violation - active - Immediate emergency anythingoptional
Please install 20'ft linear feet of sidewalk shed to serve as means of overhead protection for pedestrians using the sidewalk at the front of the building at exp#1
Jul 11, 2022
Dob violation - active - Construction other optional
Fail to maintain-exp1 facade face brcks loose,bulging outwrd& dtaching from back up walls(intrior wall).wndw frames svrly dtriortdexp3 wall spalling &crcks alng chmney.exp4 excessive mold due moisture ownr rtain nyspe-evalu entire bldg & prepare/file rpr dwgs rprs start undr prmt by 8/15/22 &cmplt/signd off by 10/19/22
Jul 8, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed
ECB violations · 9
- Class - 1
Pics taken 7/29/25 shown no brick work was done on the exterior wall expo#1. during reinspection i observed the exterior wall had a layer of bricks installed. ignoring the swo issued. respondent stated the engi
Aug 12, 2025 · Penalty $12,500
Resolve - Class - 2
At time of my inspection observed: sidewalk shed installed at expo# 1 with supported scaffold on top, no showing on drawings, creating an unsafe condition for pedestrians and negatively impact on structure. sto
Jul 28, 2025 · Penalty $3,125
Resolve - Class - 2
At time of inspection observed: sidewalk shed with equipment, materials, debris throughout contrary to code, creating unsafe condition for pedestrians. stop all work and use of sidewalk shed comply with bc 3307
Jul 28, 2025 · Penalty $5,000
Resolve - Class - 2
3301.6 at time of inspection observed: wood shoring supporting facade wall attached to temporary equipment (sidewalk shed and supported scaffolds) at exposure#1, upon request for design drawings, none was provi
Jul 28, 2025 · Penalty $5,000
Resolve - Class - 2
Failed to certify for correction for summons #39065528z, file a certificate of correction
Apr 16, 2025 · Penalty $1,250
Resolve - Class - 2
Failed to provide sidewalk shed parapet information panel contrary with bc-3301.9.2. creating hazardous for fdny to located in emergency. where a sidewalk shed is installed, a sidewalk shed parapet information
Jul 26, 2024 · Penalty $3,125
Resolve - Class - 1
At time of inspection, the brick veneer at exposure # 1/southeastern elevation exhibits bowing & separation at the 2nd floor window towards adjoining property 224 court street and poses a possibility of collaps
Jul 8, 2022 · Penalty $2,500
Resolve - Class - 1
*cease use* b154.4a,5a,19b,36,38,51,34,24.4a:hazardous.19b:burnham boiler is not regestered.38:not fixed only a window.51:cease use-do not operate boiler.repair or replace or install.hazardous conditions.call
Feb 20, 2016 · Penalty $1,000
Active - Non-hazardous
Work without a permit. new brich buneer jacape beurg installed at front of bldg. without first obtain a permit. remedy: obtain a permit
Aug 15, 1988
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1854
- Floors
- 3
- Residential units
- 2
- Building area
- 2,100 ft²
- Lot area
- 1,557 ft²
- Zoning
- R6
- Community board
- 306
- Council district
- 39
- Block / lot
- 307 / 32
- Assessed value
- $238,200
- Landmark / historic district
- Cobble Hill Historic District
Questions about 222 Court Street
Who owns 222 Court Street?
The owner of record in NYC Department of City Planning PLUTO data is John Mc Fadden.
Does 222 Court Street have violations?
NYC HPD has no housing violations on record for this property.
Is 222 Court Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 222 Court Street built?
City records list 1854 as the year it was built.
How many apartments are in 222 Court Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.