roofy

361 Henry Street

Brooklyn, NY 11201BBL 3-00296-0008Map

Owner of record: Brian M. Bizoza Trust Dated January 29, 2026

361 Henry Street is an one-family home built in 2013 in Brooklyn, 11201. It has 1 residential unit across 1 floor. The owner of record is Brian M. Bizoza Trust Dated January 29, 2026. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
1
ECB violations
17
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 1

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 27, 2011

    Vw*-violation - work w/o permit dismissed

ECB violations · 17

  • Class - 1

    Fail to institute/maintain safety equipment measures - no handrails.note:obs missing handrail @top of bldg stoop.drop to ground below over 8' (exp #1) potential for trip and fall.rem:provide handrail @bldg stoo

    Oct 23, 2013 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary contrustion - no handrails. noted: no handrails installed on stairwell @ various levels,throughout 4 story n.b. remedy: provide handrails on

    May 4, 2013 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction - no guard rails noted: @ 1st fl level stair opening from 1st fl to cellar level approx 9ft drop have no guard rails & @ roof

    May 4, 2013 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to maintain adequate house keeping persection requirements at above active jobsite the following was observed at exp3 construction debris such as concrete black black garbage bags wood pallets and vario

    Apr 17, 2012

    Resolve
  • Class - 2

    Stop all work note pursuant to section 28-207.2 of nyc a/c you are hereby ordered to immediately stop all work at above premise at time of insp observed stggl reinforcement for shoring installed at site that ha

    Sep 12, 2011 · Penalty $800

    Resolve
  • Class - 2

    Failure to file a special insp statement of responsibility prior to permit issuance & prior to start of work under special inspect requirements at time of insp no tr-1s on file rem: provide engineers report for

    Sep 12, 2011

    Resolve
  • Class - 2

    27-1032 bc3309.4 failure to pressure & protect adjoining structures affected by excavation operation at time of insp observe @ exp #1 the adjoining property slab being unexamined by excavation rem: backfill pro

    Sep 12, 2011 · Penalty $800

    Resolve
  • Class - 2

    Work w/o permit.at time of inspec. i did observe excavation & soe type work to have been done w/o the issuance of a permit by landmarks.remedy:obtain permit or restore premises to prior legal condition.

    Sep 12, 2011

    Resolve
  • Class - 3

    Sec. 27-04;3301.9.1 failure to provide sign with the wording "to anonynously report unsafe condition at this work site that endanger workers call 311" on new building or demo sites. at time of inspection i did

    Jul 6, 2011

    Resolve
  • Class - 2

    Failure to post "no smoking" sign at const/demo site in violation of nyc fire code. at time of inspection i did observe no "no smoking" sign posted. remedy: comply w/code.

    Jul 6, 2011

    Resolve
Show 7 more ↓
  • Class - 2

    Observed recent smoking refuse w/i const/demo site in violation of fire code. at time of inspection i did observe several cigarette butts w/i site. remedy: comply w/code.

    Jul 6, 2011 · Penalty $1,200

    Resolve
  • Class - 3

    Sec. 27-1021;3307.7 failure to provide an adequate construction fence.at time of inspection i did observe at exp #4 a 4' section of fence missing. remedy: comply w/notice of violation.

    Jul 6, 2011

    Resolve
  • Class - 3

    Sec. 27-1029 tppn 10/88 3309.6 failure to monitor adjoining structuresfor movement in all directions during excavation related activity thatmay adversely affects adjoining structures. at time of inspection i

    Jul 6, 2011

    Resolve
  • Class - 3

    Sec. 27-1026.3;3309.3 failure to perform inspection & document conditions of existing structures adjoining a construction or demo site in a pre construction survey at time of inspection no survey performed.

    Jul 6, 2011

    Resolve
  • Class - 2

    Failed to obtain permit for temporary construction. noted: plywood construction fence, 8'high x 50'long, erected at front of (vacant lot) site w/no application on file. remedy: obtain permit.

    Jul 9, 2010 · Penalty $500

    Resolve
  • Non-hazardous

    Work without a permit at time of inspection of above property edmolition commence and department records shows that no permit was issued. remedy: obtain permit.

    Dec 6, 2000 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to provide 24 hr notice at time of inspection of above property demolition had started and department records shows that no 24 hr notice was given as per requairement. remedy: provide 24 hr notice.

    Dec 5, 2000 · Penalty $2,500

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

DatePriceTypeUnits
Jan 29, 2026Non-market transferOne family dwellings1

Building details

Building type
One-family home (A4)
Year built
2013
Floors
1
Residential units
1
Building area
4,860 ft²
Lot area
1,743 ft²
Zoning
R6
Community board
306
Council district
39
Block / lot
296 / 8
Assessed value
$614,340
Landmark / historic district
Cobble Hill Historic District

Questions about 361 Henry Street

Who owns 361 Henry Street?

The owner of record in NYC Department of City Planning PLUTO data is Brian M. Bizoza Trust Dated January 29, 2026.

Does 361 Henry Street have violations?

NYC HPD has no housing violations on record for this property.

Is 361 Henry Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 361 Henry Street built?

City records list 2013 as the year it was built.

How many apartments are in 361 Henry Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.