76 Court Street
Brooklyn, NY 11201BBL 3-00268-0046Map
Owner of record: 76-80 Court, LLC
76 Court Street is an elevator apartment building built in 1900 in Brooklyn, 11201. It has 25 residential units across 6 floors. The owner of record is 76-80 Court, LLC. HPD has recorded 38 housing violations here, most recently on September 2, 2026. 10 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 29
- ECB violations
- 14
- HPD complaints
- 83
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 2nd apartment from west at north
Sep 2, 2026 · Apt 6B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5b , 5th story, 2nd apartment from west at north
Sep 2, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6c, 6th story, 3rd apartment from west at north
Aug 1, 2026 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 3rd apartment from west at north
Aug 1, 2026 · Apt 6C
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 6th story, 1st apartment from north at east
Aug 1, 2026 · Apt 5D
Open — Invalid certification - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 6b, 6th story, 2nd apartment from west at north
Jul 29, 2026 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the entire apartment located at apt 6b, 6th story, 2nd apartment from west at north
Jul 29, 2026 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jul 29, 2026
Closed — Violation dismissed
Show 28 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Jul 29, 2026 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jul 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from east at south
Jul 29, 2026 · Apt 5E
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 3rd apartment from west at north
Jul 29, 2026 · Apt 6C
Open — Invalid certification - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jul 29, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at north
Jul 26, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jul 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 6a, 1st apartment from west at north
Jul 26, 2026 · Apt 6A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 2nd apartment from west at north
Jul 26, 2026 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 1st apartment from west at north
Jul 26, 2026 · Apt 6A
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e , 5th story, 1st apartment from east at south
Jul 19, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar at boiler room
Jul 19, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Jul 19, 2026 · Apt 4E
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 17, 2019
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3c, 3rd story, 3rd apartment from west at north
Feb 22, 2019 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3c, 3rd story, 3rd apartment from west at north
Feb 22, 2019 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3c, 3rd story, 3rd apartment from west at north
Feb 22, 2019 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 3c, 3rd story, 3rd apartment from west at north
Feb 22, 2019 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ... ceiling in the 1st room from north at west located at apt 3c, 3rd story, 3rd apartment from south at west
Dec 3, 2018 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ... ceiling in the 1st room from north at west located at apt 3c, 3rd story, 3rd apartment from south at west
Dec 3, 2018 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3c, 3rd story, 3rd apartment from south at west
Dec 3, 2018 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west located at apt 3c, 3rd story, 3rd apartment from south at west
Dec 3, 2018 · Apt 3C
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2018
Closed — Violation dismissed
DOB building violations · 29
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed
Show 19 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 30, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2002
Dob violation - resolved - Elevator elevatorrequired
3p4171
Dec 22, 1999
Dob violation - resolved - Elevator elevatorrequired
3p4171
Mar 16, 1999
Dob violation - resolved
ECB violations · 14
- Class - 2
Work does not conform to approved const docs &/or approved amendments premises under alt 2 job #321028614 log folder.@time of insp (found).@sub cellar level plan showed 3 domestic gas fired water heater storage
May 24, 2018 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at the time of inspection it was that the work does not confomr to the approved plans. the plan indicates that the new steel
Dec 28, 2015 · Penalty $250
Resolve - Class - 1
Sec. 3301.2 failure to provide 3foot 6inch guard rail or equipment around all floor & perimeter opening. at the time of inspection it was observed that there was missing guard rail throughout the 5 sty bldg.
Dec 28, 2015 · Penalty $1,630
Resolve - Class - 1
Sec. 28-207.2.2 failure to comply w/an order to stop work by dept. at the time of inspection it was observed that work had taken place whilestop work order in process. there was no view panel in the fence when
Dec 28, 2015 · Penalty $1,630
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction oeperations. at the time of inspection it was observed that the acetylen tank which contain flammable material was not property store.
Dec 28, 2015 · Penalty $2,430
Resolve - Class - 1
Sec. 3314.1 scaffold has not been erected & maintained in a safe manner so as not ot endanger public & property from falling materials,tools,debris or collapse of scaffold. at time of inspection it was observed
Dec 28, 2015 · Penalty $1,600
Resolve - Class - 2
Work w/o a permit. at time of inspection it was observed that there was no construction fence permit on file. however a construction fence was erected w/o a permit. remedy: obtain permit or restore premises to
Dec 28, 2015 · Penalty $830
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations.@ the time of inspection it was observed that concrete had spilled in the backyard of the adjoining property @ exp3 of the jobsite
Dec 24, 2015 · Penalty $1,200
Resolve - Class - 2
Bc3314.8.1 failure to provide required safety mesh around scaffold platform & time of inspection it was observed that there was no safety mesh @ the corner of exp2 & 3 for the jobsite.rem stop all work provide
Dec 24, 2015 · Penalty $400
Resolve - Class - 2
Failure to post dot permit for sidewalk closing.noted:at time of inspection respondent fail to post dot permit.on exposure #4 (livingston st) a shed was erected for storage of debris containers approx 6'hx4'wx
Feb 19, 2013 · Penalty $500
Resolve
Show 4 more ↓
- Class - 2
Failure to maintain bldg in code-compliant manner. noted: 1) hole 30" long x 24" wide in flr near elevator, 2) exposed electrical wires nearelevator and east side of basement and holes in fire proofing
Dec 8, 2009 · Penalty $500
Resolve - Class - 1
Cu53l11cu46m0742a1039m0756y1056y0259y0260q03100m0726d0621k1041t0741d0601l1002x10. 53l 46m cease use gov rope (rinhed) w/ numerous (repairs) no (plahksw) call 212 566 5539 for inspection appt 42a wiring 39m car
Jul 15, 2009 · Penalty $1,000
Resolve - Hazardous
Work w/o permit work noted ceiling of sidewalk vault removed new steel 3 inch steel beams installed with metal decking on top steel approx 3on center on north side of prop approx 100ft l no protection for pedes
Jun 18, 2003 · Penalty $800
Resolve - Non-hazardous
02l,52e,31q,10p,10-p-17 bsmt and sub bsmt reyed out.
Jan 16, 1998
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt 5C
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt 5C
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt 4B
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt 5B
Open - Heat/hot water
Entire building
Oct 21, 2026 · Apt 5E
Open - Plumbing
Water supply
Oct 21, 2026 · Apt 6B
Open - Heat/hot water
Entire building
Sep 27, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Sep 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 1, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt 5B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Aug 31, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Aug 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 3, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Aug 3, 2026 · Apt APT5C
Close - General
Cooking gas
Aug 3, 2026 · Apt APT5C
Close - General
Cooking gas
Aug 3, 2026 · Apt 5C
Close - General
Cooking gas
Aug 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 2, 2026 · Apt 5E
Close - General
Cooking gas
Aug 2, 2026 · Apt 5E
Close - Heat/hot water
Apartment only
Aug 1, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Aug 1, 2026 · Apt 6E
Close - Heat/hot water
Entire building
Jul 31, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 31, 2026 · Apt 5D
Close - Heat/hot water
Entire building
Jul 31, 2026 · Apt 5D
Close - General
Cooking gas
Jul 31, 2026 · Apt 6C
Close - General
Cooking gas
Jul 30, 2026 · Apt 6B
Close - Appliance
Electric/gas range
Jul 30, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt BLDG
Close - General
Cooking gas
Jul 30, 2026 · Apt BLDG
Close - General
Cooking gas
Jul 30, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt 5C
Close - General
Cooking gas
Jul 30, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt 6B
Close - General
Cooking gas
Jul 29, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Jul 29, 2026 · Apt 5C
Close - Heat/hot water
Entire building
Jul 28, 2026 · Apt 5E
Close - General
Cooking gas
Jul 28, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jul 28, 2026 · Apt 6B
Close - Appliance
Electric/gas range
Jul 28, 2026 · Apt 6B
Close - Heat/hot water
Entire building
Jul 27, 2026 · Apt 5E
Close - General
Cooking gas
Jul 27, 2026 · Apt 5E
Close - General
Cooking gas
Jul 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 25, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Jul 25, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Jul 24, 2026 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1900
- Floors
- 6
- Residential units
- 25
- Building area
- 29,846 ft²
- Lot area
- 4,390 ft²
- Zoning
- C6-2A
- Community board
- 302
- Council district
- 33
- Block / lot
- 268 / 46
- Assessed value
- $6,889,050
- Landmark / historic district
- No
HPD registration #387113, last renewed Sep 11, 2025.
Questions about 76 Court Street
Who owns 76 Court Street?
The owner of record in NYC Department of City Planning PLUTO data is 76-80 Court, LLC.
Does 76 Court Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 76 Court Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 76 Court Street built?
City records list 1900 as the year it was built.
How many apartments are in 76 Court Street?
It has 25 residential units and 26 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.