210 Joralemon Street
Brooklyn, NY 11201BBL 3-00266-7501Map
Owner of record: 210 Muni, LLC
210 Joralemon Street is a condominium built in 1926 in Brooklyn, 11201. The owner of record is 210 Muni, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 164
- ECB violations
- 34
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 164
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 16, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 16, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved
ECB violations · 34
- Class - 2
At time of inspection observed: at expo# 4 stair tower with inadequate loose netting debris and tear apart not maintained contrary to bc 3314.8.2 creating unsafe conditions, debris or other elements could fall
Sep 27, 2026 · Penalty $2,500
Active - Class - 2
Sidewalk shed installed at expos 1 & 4 contrary to code. multiple beams at expos 1 placed within 18in from the face of the curb (3307.6.4.4. 8). 8ft minimum height not maintained in pathway at multiple location
Jul 24, 2026 · Penalty $2,430
Active - Class - 1
Upon inspection of a facade/roof alt i observed work contrary to the approved site safety plan. no 20ft sidewalk shed extension provided at expos 1 and 4. no overhead protection provided for the adjoining prope
Jul 24, 2026 · Penalty $2,500
Active - Class - 2
Upon inspection i observed a sidewalk shed installed at expos 1&4 with an inadequate size (not 3ftx6ft) sidewalk shed project info panel installed at expos 1&4 contrary to code 3301.9.2.4 sidewalk shed parapet
Jul 24, 2026 · Penalty $1,250
Resolve - Class - 1
At the time of inspection it was observed, that the contractor failed to submit report within 3 business days of required 16 items to code 28-103.21 per-28-103.21.1 by via web incidents, which occurred on 05/2/
Jun 12, 2025 · Penalty $10,030
Resolve - Class - 1
At time of inspection in respond to an incident that occurred on 05-02-2025 where a worker injured his finger during construction activities around 1 pm and was taken to hospital for treatment, inspection revea
May 5, 2025
Resolve - Class - 1
At time of inspection observed storage zones at the buildings exposure 4, not following manufacturers specifications plastic barricades on the sidewalk not filled with water or sand to add weight to the plastic
Jan 24, 2023 · Penalty $2,500
Resolve - Class - 1
At the time of inspection, observed storage zones at the buildings exposure 3 & 4. cyclone fence panels installed on too of the plastic barricades. upon request to review the design drawing for the cyclone fenc
Jan 24, 2023 · Penalty $2,500
Resolve - Class - 1
Inspection were a worker was performing elevated demolition operation via a ladder while not maintaining three points of contact and without a work platform and there were no demolition sequence for operation
Jan 24, 2023
Resolve - Class - 2
At the time of my inspection of a 15 story building, i observed sidewalk shed in place at exposure #1 and with the following objection inoperable light bulbs. this creates hazardous condition for pedestrian usi
Oct 27, 2022
Resolve
Show 24 more ↓
- Class - 1
Failure to notify dept of accident/incident that resulted in fatality or injury.noted:worker fell towards hatch of hoist suffered laceration to left arm & bruise to right arm went to urgent care.as per check de
Sep 8, 2022 · Penalty $5,000
Resolve - Class - 2
At time of inspection responding to complaint that one worker got injurie his hand while installing temporary hoist installation. review pre shift safety meeting specific content and scope of work did not provi
Aug 29, 2022 · Penalty $5,000
Resolve - Class - 1
At time of my inspection responding to complaint that one worker got injurie his hand during temporary hoist installation operation. i observed failure to notify to the department immediately as required. incid
Aug 29, 2022 · Penalty $5,000
Resolve - Class - 1
At time of my inspection responding to complaint that one worker got injurie his hand during temporary hoist installation operation. i observed failure to notify to the department immediately as required. incid
Aug 29, 2022 · Penalty $5,000
Resolve - Class - 2
Shorten gov rope. repair emergency lighting. self resetting escape hatch switches prohibited.
Apr 19, 2022
Resolve - Class - 2
Shorten gov rope. shorten comp ropes. self resetting escape hatch switches prohibited.
Apr 19, 2022
Resolve - Class - 2
Shorten gov rope. repair emergency lighting. self resetting escape hatch switches prohibited.
Apr 19, 2022
Resolve - Class - 2
Shorten gov rope. repair emergency lighting. self resetting escape hatch switches prohibited. shorten comp ropes. eliminate gap at bottom of right brake pad.
Apr 19, 2022
Resolve - Class - 2
Self resetting escape hatches prohibited.
Apr 19, 2022
Resolve - Class - 2
Shorten gov rope. repair emergency lighting. self resetting escape hatch switches prohibited. shorten comp ropes. car shut down during inspection.
Apr 19, 2022
Resolve - Class - 2
Work does not conform to approved construction documents and/or amendments-pipe scaffold expo 3 & setbacks plans e4 & e5.004 & e-9 & e10.006not conforming(trusses)at time of inspection of a 15 story alteration
Apr 12, 2022
Resolve - Class - 1
Failure to comply/maintain to manufacturer specifications-cut/modifiedpipe scaffold frames expo 3.at time of inspection at a 15 story alteration site,i observed workers repairing facade expo 3 approx 3rd floor
Apr 12, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#809154. remedy: file acceptable report.
Oct 8, 2021
Resolve - Class - 2
Unapproved,unsafe,unsuitable electrical equipment,devices,apparatus,appliances,materials or wiring in use.deteriorated deep pan above 1000 kva service in basement.remedy:comply with code.
Oct 7, 2021
Resolve - Class - 2
Failure to maintain building in a code-compliant manner.at time of inspection,observed evidence of leaking at exposure 3 stairwell to restaurant basement.paint,crummed ceiling time and other debris has fallen t
Aug 25, 2021
Resolve - Class - 2
A.c 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/2019,in an office bldg 100 ft or
Nov 15, 2019
Resolve - Class - 2
Failure to fill acceptable amended cycle 8a report indicating correct on of unsafe conditions described in intial report required by 28-302 5 for control #809154.file acceptable report
Aug 1, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg facade.north elevation (north/east corner) exp#1, observe vertical hair line cracks at 4th flr and up atmasonry facade; (ii)south elevation,exp#3 spalling/cracks/damage,stone
Aug 4, 2016
Active - Class - 2
05b10,97x10. 05b10-door will not open on the 6th flr and others; 97x10-repair this device and restore to service.
May 16, 2016 · Penalty $500
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices appartus materials appliances or wiring in use. expose wiring in lobby next to security desk wire molding missing el covers ducts tape used at 90 ell.
Mar 12, 2015 · Penalty $4,000
Active - Class - 2
Failure to maintain bldg in code-compliant manner. note: 2 revolving doors at front entrance to bldg, glass broken & missing & is patch up with cardboard & duct tape observed at 1st floor front entrance to bldg
Jun 2, 2014
Resolve - Class - 2
Sidewalk shed does not meet bldg code specifications. sidewalk shed lighting not operating on joralemon street & court street side of bldg @ inspection time 9:30pm on 04/12/13. rem: conform shed to code specifi
Apr 12, 2013
Resolve - Class - 2
Work after hours w/o variance permit contrary to 28-105.12.5 in that wrkrs in process of demolishing interior partitions on 2nd flr after permitted hrs w/o an after hours variance permit.rmdy:stop all after hrs
Oct 24, 2012 · Penalty $400
Resolve - Class - 2
Sidewalk shed does not meet code specifications in that lighting fixtures that were installed underneath have a section that had come loose and is hanging down. also lights are not illuminated. remedy: conform
Nov 19, 2008 · Penalty $10,000
Resolve
Complaints
- Nonconst
Rubbish
Jun 13, 2012 · Apt 1
Close - Plumbing
Water-leaks
Jun 13, 2012 · Apt 1
Close - General
Stairs
Jun 13, 2012 · Apt 1
Close - General
Doors
Jun 13, 2012 · Apt 1
Close - General
Mailbox
Jun 13, 2012 · Apt 1
Close - General
Doors
Jun 13, 2012 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 1926
- Floors
- 13
- Residential units
- —
- Building area
- 550,966 ft²
- Lot area
- 62,930 ft²
- Zoning
- C5-2A
- Community board
- 302
- Council district
- 33
- Block / lot
- 266 / 7501
- Assessed value
- $56,359,800
- Landmark / historic district
- Borough Hall Skyscraper Historic District
Questions about 210 Joralemon Street
Who owns 210 Joralemon Street?
The owner of record in NYC Department of City Planning PLUTO data is 210 Muni, LLC.
Does 210 Joralemon Street have violations?
NYC HPD has no housing violations on record for this property.
Is 210 Joralemon Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 210 Joralemon Street built?
City records list 1926 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.