41 Grace Court is an elevator apartment building built in 1960 in Brooklyn, 11201. It has 33 residential units across 6 floors. The owner of record is Grace Court Owners Corp. HPD has recorded 52 housing violations here, most recently on April 10, 2024. 42 of the 50 most recent violations are still open.

HPD violations
52
DOB violations
49
ECB violations
5
HPD complaints
79

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 10, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 10, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2023

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective door knob in the entrance located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • A

    Repair leaky water closet flush pipe connection in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • B

    Repair the broken or defective connection at waste line at sink in the kitchen located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair the broken or defective intercom system from building entrance to return buzzer at south wall in the foyer located at apt 3d, 3rd story, 1st apartment from south at west

    Nov 3, 2022 · Apt 3D

    Open — Nov sent out
  • A

    Repair leaky water closet flush pipe connection .. in the bathroom located at apt 3d, 3rd story, apartment at west

    Dec 9, 2019 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3d, 3rd story, apartment at west

    Dec 9, 2019 · Apt 3D

    Open — Nov certified late
Show 40 more ↓
  • B

    Fire egress defective. remove the obstruction in fireproof passageway plywood sheets at east front section

    Aug 28, 2018

    Open — Nov certified late
  • B

    Arrange and make self-closing the doors 2nd at east, public hall at cellar, section at east

    Aug 28, 2018

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Dec 26, 2017 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Dec 26, 2017 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair the broken or defective and make operative the mechanical ventilation at east wall at public hall, 4th story

    Jul 19, 2017

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 17, 2016

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 2nd story, 1st apartment from east at south

    Jan 26, 2013 · Apt 1D

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door lock to cellar at public hall, 1st story

    Jan 26, 2013

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west

    Jan 22, 2013 · Apt 3D

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st sty public hall , 1st story

    Jan 22, 2013

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system access locked at 1st sty public hall , 1st story

    Jan 22, 2013

    Open — Nov sent out
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Sep 11, 2012 · Apt 3D

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin waterbugs and roaches thru out lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall and floor tiles bathroom lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    Properly secure the loose door knob entrance door lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    Replace with new the missing washbasin bathroom lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls bathroom lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing lobby apt d cohen

    Mar 9, 1994

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floors thru out lobby apt d

    Mar 9, 1994

    Open — Nov sent out
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective concrete clg boiler room basement.

    Mar 11, 1987

    Open — Nov sent out
  • B

    D26-10.01 adm code & 309 m/d law abate the nuisance consisting of stuffed furniture boiler room cellar center.

    Mar 11, 1987

    Open — Nov sent out
  • B

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the boiler room cellar center.

    Mar 11, 1987

    Open — Nov sent out
  • B

    D26-10.01 adm code properly repair the broken or defective make balance window east room 3 sty east apt 3b. located at apt 3b

    Mar 11, 1987 · Apt 3B

    Open — Nov sent out
  • A

    D26-10.01 adm code refit door pub hall bulkhead to roof.

    Mar 4, 1987

    Open — Nov sent out
  • B

    D26-20.08,20.09 adm code provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 4 sty northwest apt 4e. located at apt 4e

    Mar 4, 1987 · Apt 4E

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls & clgs thruout 3 sty south apt 3c. located at apt 3c

    Mar 4, 1987 · Apt 3C

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 4 sty west apt 4d. located at apt 4d

    Mar 4, 1987 · Apt 4D

    Open — Nov sent out
  • B

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color clgs front & bathroom 5 sty northwest apt 5e. located at apt 5e

    Mar 4, 1987 · Apt 5E

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department clg 5 sty east apt 5b kitchen. located at apt 5b

    Mar 4, 1987 · Apt 5B

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls & clg east room 6 sty south apt 6c. located at apt 6c

    Mar 4, 1987 · Apt 6C

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department clg foyer 6 sty south apt 6c. located at apt 6c

    Mar 4, 1987 · Apt 6C

    Open — Nov sent out
  • B

    D26-20.08,20.09 adm code provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 6 sty south apt 6c. located at apt 6c

    Mar 4, 1987 · Apt 6C

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code arrange and make self-closing the doors hopper 4 sty pub hall.

    Mar 4, 1987

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots etc 6 sty balcony front west.

    Mar 4, 1987

    Open — Nov sent out
  • B

    D26-10.01, 10.05 adm code arrange and make self-closing the doors fire stairs 2 sty.

    Mar 4, 1987

    Open — Nov sent out
  • A

    D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls 4 sty fire stairs.

    Mar 4, 1987

    Open — Nov sent out
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective plaster walls bulkhead to roof 6 sty public hall.

    Mar 4, 1987

    Open — Nov sent out
  • C

    D26-17.10 adm code provide ready access to building's heating system cellar door locked.

    Mar 4, 1987

    Open — Nov sent out
  • C

    D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on door to heating plant.

    Mar 4, 1987

    Open — Nov sent out
  • A

    D26-10.01 adm code refit 6 sty fire stairway door.

    Mar 4, 1987

    Open — Nov sent out

DOB building violations · 49

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2021

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 6, 2016

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
Show 39 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 28, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 22, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 30, 2011

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Vcat1-elevator annual inspection / test elevatorrequired

    Oct 8, 2010

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 17, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 12, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 23, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 29, 2003

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to maintain exterior bldg roof southeast corner.stucco defective,broken off @ parapet interior side.elev.1-main entrance.returning wall missing mortar & coping dislodged rear-northern.exp.3 rusting out

    Mar 24, 2015 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain exterior bldg north elevator, exp.3 rear of bldg 1story metal stairs ( west side ) landing & stairs rusting & stringer rusted out ground fl to 2nd story. rear fire escape ( west side ) 1st f

    Oct 1, 2014 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain facade and appurtenances. noted: at facade @ the southeast corner at the approx 5th flr, 2 bricks were observed to be bulging and are loose w/pcs in danger of falling. also at #1/south exp

    May 22, 2013 · Penalty $250

    Resolve
  • Class - 2

    08v01.42g11.62g11.69m07.100m07.17h11.17d06.52m07.34o02.08 adjsut fl stops 42.62g unreadable fuses 69.100 provide soce plate & prints 17hd replace or secuere where needed 52m anti-spin device 34o clean build up

    Feb 3, 2009

    Resolve
  • Non-hazardous

    35p,22d,36t,55q,75u,

    Feb 16, 1998 · Penalty $2,500

    Resolve

Complaints

  • Plumbing

    Toilet

    Oct 17, 2022 · Apt 3D

    Close
  • Plumbing

    Toilet

    Oct 17, 2022 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Oct 17, 2022 · Apt 3D

    Close
  • Water leak

    Slow leak

    Oct 17, 2022 · Apt 3D

    Close
  • Plumbing

    Toilet

    Oct 4, 2022 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Oct 4, 2022 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Oct 4, 2022 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Oct 4, 2022 · Apt 4D

    Close
  • Plumbing

    Toilet

    Oct 4, 2022 · Apt 4D

    Close
  • Door/window

    Door

    Oct 4, 2022 · Apt 4D

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Oct 4, 2022 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Dec 4, 2019 · Apt 3D

    Close
  • Plumbing

    Toilet

    Dec 3, 2019 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Dec 3, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Nov 9, 2019 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2019 · Apt 6D

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2019 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2018 · Apt 3D

    Close
  • Plumbing

    Toilet

    Aug 24, 2018 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Mar 13, 2018 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2018 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Jan 3, 2018 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Jan 3, 2018 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Jan 3, 2018 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Jan 3, 2018 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2018 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Jan 3, 2018 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Dec 21, 2017 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Dec 21, 2017 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Dec 21, 2017 · Apt 3D

    Close
  • Plumbing

    Toilet

    Dec 21, 2017 · Apt 3D

    Close
  • General

    Ventilation system

    Jul 18, 2017 · Apt 4B

    Close
  • Appliance

    Refrigerator

    Jul 10, 2017 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Jul 8, 2017 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Jul 7, 2017 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Mar 5, 2017 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2017 · Apt 3D

    Close
  • Plumbing

    Water supply

    Apr 7, 2016 · Apt 4B

    Close
  • Plumbing

    Water supply

    Apr 7, 2016 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2016 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2016 · Apt 3D

    Close

Sales history

DatePriceTypeUnits
Aug 27, 2026$582,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1960
Floors
6
Residential units
33
Building area
27,664 ft²
Lot area
6,080 ft²
Zoning
R6
Community board
302
Council district
33
Block / lot
251 / 43
Assessed value
$3,147,300
Landmark / historic district
Brooklyn Heights Historic District

HPD registration #373239, last renewed Aug 29, 2025.

Questions about 41 Grace Court

Who owns 41 Grace Court?

The owner of record in NYC Department of City Planning PLUTO data is Grace Court Owners Corp.

Does 41 Grace Court have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 41 Grace Court rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 41 Grace Court built?

City records list 1960 as the year it was built.

How many apartments are in 41 Grace Court?

It has 33 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.