561 Pacific Street
Brooklyn, NY 11217BBL 3-00186-7503Map
Owner of record: 561 Pacific Street Owner LLC
561 Pacific Street is a condominium built in 2018 in Brooklyn, 11217. It has 62 residential units across 12 floors. The owner of record is 561 Pacific Street Owner LLC. HPD has recorded 1 housing violation here, most recently on April 3, 2023.
- HPD violations
- 1
- DOB violations
- 1
- ECB violations
- 15
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2023
Closed — Violation dismissed
DOB building violations · 1
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 29, 2021
Dob violation - resolved
ECB violations · 15
- Class - 2
Missing cab mirror. missng brake maintnenance tag. expired maintenance log.
Feb 26, 2026 · Penalty $625
Resolve - Class - 2
Missing cab mirror. missng brake maintnenance tag. expired maintenance log. top landing is an aillegal vestibule; conform to 2.11.6.5.
Feb 26, 2026 · Penalty $625
Resolve - Class - 1
Bc3314.4 supported pipe scf not installed or maintained as per code atoi observed 4frames high supported pipe scf installed inside elevator shaft w/1worker on it to install elevator.observed scf missing base pl
Mar 10, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to notify the deot of an accident/incident that resulted in a fatality or an injury. during a sidewalk repair,a skid steer loaders hydraulic hose became detached,which allowed air to spray onto a pedest
Sep 15, 2020 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure workers received site safety orientation.note:at the time of inspection 12 a story new building,in response to an incident report by the s.s.c that during sidewalk restoration an
Aug 25, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard all person and property affected by construction operations.note:at time of my inspection of a 12 story new building,inresponse to an incident reported by s.s.c that during sidewalk restora
Aug 25, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to communicate required information to workers during pre shift safety meeting.note:at time of my inspection of a 12 story new building at finishing level,in response to compliments reported by s.s.c th
Aug 25, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to comply with manufacturers specifications note at time o finspection of a 12 storys new building at finishing level in response to an incident reported by s s c that on hydraille hsoe of ent reported
Aug 25, 2020 · Penalty $2,500
Resolve - Class - 1
Fail to institute/maintain safety equipment measures or temp.construction(handrails)note:at time of complaint inspection i observed new 12 story building topped off with active construction work in progress i o
Jan 17, 2020 · Penalty $2,500
Resolve - Class - 1
Housekeeping.at time of complaint inspection.i observed new 12 story building topped off with active construction work in progress i observed inadequate housekeeping,throughout jobsite consisting of large amoun
Jan 17, 2020 · Penalty $2,500
Resolve
Show 5 more ↓
- Class - 1
Bc33012-fail ot maintain safety equipment/measures.at time of complaint inspection.i observed new 12 story bulding topped off with active construction work in progress i observed on 1st sty missing cover panels
Jan 17, 2020
Resolve - Class - 1
Work does not conform to approved const documents and/or approved amendments. @time of inspection on an active jobsite of a 12sty building, currently @roof (when) observed erected pipe sacffold approx. 125ft in
Oct 31, 2019 · Penalty $2,500
Resolve - Class - 1
3314.4.8 failure to maintain scaffold as per code subsection @time ofinspection on an active jobsite of a 12 sty bldg, currently @roof lvl observed erected scaffold @all exposures approx. 125 ft in height.
Oct 31, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approevd construction documents and or approved amendments note:at time of my inspection of a 12 story new building wokr in progress i observed supproted scaffold at exposure 4,#2,#3,#
Sep 23, 2019 · Penalty $2,500
Resolve - Non-hazardous
11q,27q,33q,33o,53b,57o,60j
Dec 16, 1996
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2018
- Floors
- 12
- Residential units
- 62
- Building area
- 81,671 ft²
- Lot area
- 11,775 ft²
- Zoning
- R8A
- Community board
- 302
- Council district
- 33
- Block / lot
- 186 / 7503
- Assessed value
- $17,184,476
- Landmark / historic district
- No
HPD registration #390330, last renewed Sep 10, 2025.
Questions about 561 Pacific Street
Who owns 561 Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is 561 Pacific Street Owner LLC.
Does 561 Pacific Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 561 Pacific Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 561 Pacific Street built?
City records list 2018 as the year it was built.
How many apartments are in 561 Pacific Street?
It has 62 residential units and 65 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.