35 Nevins Street
Brooklyn, NY 11217BBL 3-00167-7501Map
Owner of record: Unavailable Owner
35 Nevins Street is a condominium built in 2015 in Brooklyn, 11217. It has 73 residential units across 21 floors. The owner of record is Unavailable Owner. HPD has recorded 14 housing violations here, most recently on July 27, 2024. 3 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 5
- ECB violations
- 21
- HPD complaints
- 6
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 3rd room from north located at apt 10d, 10th story, 2nd apartment from south at west
Jul 27, 2024 · Apt 10D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at celing and east wall in the 2nd room from north located at apt 10d, 10th story, 2nd apartment from south at west
Jul 27, 2024 · Apt 10D
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at front entrance door to building , 1st story
Jul 27, 2024
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south wall in the 3rd room from north located at apt 10d, 10th story, 2nd apartment from south at west original violation 17146562 issued 27-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 27, 2024 · Apt 10D
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at celing and east wall in the 2nd room from north located at apt 10d, 10th story, 2nd apartment from south at west original violation 17146565 issued 27-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 27, 2024 · Apt 10D
Open — Defect letter issued
Show 4 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 2nd room from north located at apt 10d, 10th story, 2nd apartment from south at west
Jul 27, 2024 · Apt 10D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from north located at apt 10d, 10th story, 2nd apartment from south at west
Jul 27, 2024 · Apt 10D
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 27, 2024
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock at building front entrance door , 1st story
Jul 27, 2024
Closed — Violation dismissed
DOB building violations · 5
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2018
Dob violation - resolved
ECB violations · 21
- Class - 1
At time of inspection in response to an incident where a piece of scaffold frame came off the building during installation and damaged 2 parked cars on the street, inspection reveal a rotten frame connecting ro
Oct 23, 2025 · Penalty $12,500
Resolve - Class - 1
At time of inspection in response to an incident where a piece of scaffold frame came off the building during installation and damaged 2 parked cars on the street, inspection reveal a rotten frame connecting ro
Oct 23, 2025 · Penalty $10,030
Resolve - Class - 1
At the of inspection on an active job site for facade repairs, i observed worker kevin sandoval working on supported pipe scaffold doing demo work at roof level exposure 4 . as per code upon my request when i
May 28, 2024
Resolve - Class - 3
Work w/o permit:at time of inspection observed at 1st floor business estblishment as cosmetic treatments 4 business advertising adhesive posted on windows aprox 6x6'6 reads "goals aesthetics and plastic surgery
Apr 29, 2022
Resolve - Class - 2
At time of inspection, construction fence at rear yard of premises, built without a permit, obtain all permits; obtain fence permit
Jan 13, 2021
Resolve - Class - 2
At time of inspection, 10 linear feet of construction fence collapsed at rear yard of premises, leaving rear yard open to the public, allowing debris to accumulate at rear yard, repair and/or replace; repair co
Jan 13, 2021
Resolve - Class - 2
No permit for model apt in use w/o temp cofo.at time of inspection observed mode apt in apt 3d(3rd fl)and being shown to perspective buyer.apt ws completely furnished.to get to model apt perspective buyer had t
Oct 16, 2017
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation. note: at the time of my inspection of a 21 story bldg at 18fl level responding to complaint # 3565265 where ssm reported there wa
Jul 8, 2016 · Penalty $25,000
Resolve - Class - 1
Manufacturer specifications. note: at the time of my inspection of 21 story bldg at 18th fl level responding to complaint #3565265 where ssmreported that there was a concrete blow out onto another bldg. inspect
Jul 8, 2016 · Penalty $1,600
Resolve - Class - 1
No concrete safety manager present during all concrete operations as required. on the date noted above,i performed an inspection of the new bldg under construction as result of street concrete spill observed at
May 31, 2016 · Penalty $2,400
Resolve
Show 11 more ↓
- Class - 1
Sec. 3303.15 failure to prevent spill of concrete washout water onto public sewage. on the date noted above i observed concrete spilled on the street & water entering the sewage. at the time of inspection i was
May 31, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3303.8.1 failure to provide pressurized alarm system for standpipe in reayness. on the date noted above,i performed an inspection of the new bldg under construction at the time of inspection i observed tha
May 31, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. on the date noted above,i performed an inspection of the new bldg under construction. at the time of inspection,i observed on the
May 26, 2016 · Penalty $10,000
Resolve - Class - 2
Sec. 3310.9 additional site safety personnel. note: at the time of my inspection of a 21 sty bldg at 16 fl level. i observed that concrete safety manager #2391 was signing logs & performing duties since 3/30/16
Apr 22, 2016 · Penalty $800
Resolve - Class - 2
Sec. 3310.3 site safety plan. note: at the time of my inspection of a 21 sty bldg at 16th fl level. i observed fire escape for adjacent property that lead to egress was not protected,i also observed spider cran
Apr 22, 2016 · Penalty $800
Resolve - Class - 2
Bc3310.3 failure to provide site safety plan at time of inspection. note: at time of my inspection of a 21story building at 16th flr levelconstruction work in progress.upon request for site safety plans to re
Apr 16, 2016 · Penalty $800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guard rails.note:at time of my inspection of a 21storybldg at 16th floor level, construction work in progress.i observed fro
Apr 16, 2016 · Penalty $2,400
Resolve - Class - 1
Horizontal safety netting.note: at time of my inspection of a 21story bldg at 16th flr level construction work in progress.i observed horizontal netting at 11th flr level, with stripping operation on 12,13th,14
Apr 16, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3301.2 failure to institute/maintain safety equipment measure or temporary construction. note: at the time of my inspection of a 21story bldg at 16th flr level construction work in progress.i observed that
Apr 16, 2016 · Penalty $1,600
Resolve - Class - 2
Bc3307.7 fence. note: at time of my inspection of a 21story building @16th flr level,construction work in progress, i observed one panel of fence apprx 4'by 9'missing at rear yard adjacent to window of adjacent
Apr 16, 2016 · Penalty $800
Resolve - Class - 2
Sec. 3303.3 obstruction of sidewalk & sheet w/o dot permit. note: at time of inspection observed active site,i responded to dob incident #20523,where concrete pump truck(tipped) over during pump operations. the
Oct 14, 2015 · Penalty $830
Resolve
Complaints
- Unsanitary condition
Mold
Jul 15, 2024 · Apt 10D
Close - Water leak
Slow leak
Jul 15, 2024 · Apt 10D
Close - Electric
Wiring
Aug 22, 2023 · Apt 2C
Close - General
Ventilation system
Aug 22, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Feb 21, 2021 · Apt 3
Close - Heat/hot water
Entire building
Feb 3, 2021 · Apt 10A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2015
- Floors
- 21
- Residential units
- 73
- Building area
- 60,576 ft²
- Lot area
- 5,371 ft²
- Zoning
- C6-4
- Community board
- 302
- Council district
- 33
- Block / lot
- 167 / 7501
- Assessed value
- $10,582,632
- Landmark / historic district
- No
HPD registration #387727, last renewed Aug 21, 2025.
Questions about 35 Nevins Street
Who owns 35 Nevins Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 35 Nevins Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 35 Nevins Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 35 Nevins Street built?
City records list 2015 as the year it was built.
How many apartments are in 35 Nevins Street?
It has 73 residential units and 75 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.