roofy

285 Schermerhorn Street

Brooklyn, NY 11217BBL 3-00166-7501Map

Owner of record: Unavailable Owner

285 Schermerhorn Street is a condominium built in 1926 in Brooklyn, 11217. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
21
ECB violations
42
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 21

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 13, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 13, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 6, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2020

    Dob violation - active
Show 11 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2018

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active

ECB violations · 42

  • Class - 1

    @14 story nb job# 320627416 where worker got injured during concrete operations on 4/29/25 & no report by 5/7/25 per department records site failed to notify dob within 3 business days+to date of 16 items expre

    May 7, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    In response to an incident where a worker knelling down was hit on the head and at the lower back with a 16' by 20 " form work on building bulkhead during material handling operation inspection reveal the mat

    Apr 29, 2025

    Resolve
  • Class - 1

    3308.6.1.7 at time of inspection of a 14 stories nb, at exposures #2 horizontal safety netting not conform with removal sequence, observed active bridge overhang bracket platform use for formwork operation in p

    Apr 29, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3308.6 at time of inspection of active construction site of proposed 14 story new building at 8th floor level during concrete operations, observed missing horizontal netting system at exposure 2, 3 &4 as req

    Feb 27, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    Responding to follow up inspection of incident at occurred where worker was cut on his left hand, upon inspection observed hilti grinder was improper used as per manufacture used without side handle (or optiona

    Feb 27, 2025

    Resolve
  • Class - 2

    At time of a proposed 14 story building at 8th floor level, observed active concrete operations. upon inspection no roof protection was observed in place at adjoining property at exposure #4 as required per cod

    Feb 27, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3307.4.7 inadequate work or storage zone. at time of inspection during active construction work observed inadequate work or storage zones adjacent to sidewalk shed not fully enclosed, the space between the t

    Feb 27, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection of a proposed 14 story new building currently at 8th floor level during active concrete operations. upon review dob approved site safety plans observed missing overhead protection at expos

    Feb 27, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of inspection on an active job site, i observed a sidewalk shed at exposure 1 with storage on top consisting of scaffold parts , netting and other construction materials as per bc 3307.6.4.2 sidewa

    Nov 12, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    Time of inspection of a proposed14 story building, observed an erected sidewalk shed and supported scaffolding at exposure 1,2, 4 with safety netting wrapped around the supported scaffolding. failure to maintai

    Jun 12, 2023 · Penalty $2,500

    Resolve
Show 32 more ↓
  • Class - 1

    Time of inspection of a proposed 14 story building, i observed a storage zone at the buildings exposure 1 with plastic barricades. plastic barricades yodocks were not filled with water or sand to add weight not

    Jun 12, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of my inspection of a 14 story building at demolition phase, i observed sidewalk shed in place at exposure #1 with a valid permit date: 10-05-2023 and with the following objective inoperable light b

    Apr 27, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Observed a sidewalk shed (sws) at exp#1 with the sws posts at the adj exp#2 property driveway not secured against displacement and/or marked w/ high visibility markings, per code. also observed 1 red standpipe

    Apr 10, 2023 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply with dot regulations as per 34 rcny 2-05 and admin code provisions 19-107, 19-108 or 19-121. observed a street enclosure at exp#1 w/ a vehicle and a debris container placed inside of it. the

    Apr 10, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Observed a supported scaffold at exp#1,2,4, with loose debris netting in multiple locations, creating a safety hazard for public and property as any potentially loose debris/materials may fall through the gaps

    Apr 10, 2023

    Resolve
  • Class - 2

    Observed needle beams with supported scaffold on top installed on 3rd exp#4 not as per approved drawings. drawings call for needle beams to be anchored to slab with two through bolts, washer and steel angle, wh

    Nov 9, 2022

    Resolve
  • Class - 2

    Observed overhead protection installed at exp#2 not as per drawings, observed ohp is 12ft high, drawings call for cross brace on section view for 10ft and 12ft high ohp, while on side ohp was missing cross brac

    Nov 9, 2022

    Resolve
  • Class - 1

    At the time of my inspection observed supported scaffold at exp#3 and 4 with following violation condition: 1. not fully planked platform 2. missing guardrail system 3. planks not tied down 4. no netting. stop

    Oct 21, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    After reviewed dob approved drawings for supported scaffold revealed that scaffold does not conform drawings (at exp#3 frame should be installed on double w8x10 beams and parapet. beams have to be install on 2

    Jun 7, 2022 · Penalty $625

    Resolve
  • Class - 1

    At the time of my inspection observed supported scaffold on sidewalk shed at exp#1, 2 and 3. upon request load imposed letter from registered design professional none were provided. this is create an unsafe con

    Jun 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    At the time of my inspection observed openings in floor not soliidly planked over by planked no less than 2" and not laid close which create hazardous falling for workers and personnel accessing the site.comply

    Jun 7, 2022 · Penalty $625

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments note at time of inspection of 14 story new building construction work in progress observed at exp #2 overhead protection made

    Apr 13, 2022 · Penalty $625

    Resolve
  • Class - 2

    Permit expired(forget to renew)d.o.t. permit expired.at time of my inspection of jobsite of proposed 114 story bldg,observed in the street at exp.#1 a debris container,upon checking of the d.o.t. permit,it dec

    Mar 14, 2022

    Resolve
  • Class - 2

    3303.4.2 dumpster container.at time of my inspection of jobsite of proposed 14 story,observed in the exp.#4 a container full of debris & garbage above limit.also observed that no cover was provided to cover dum

    Mar 14, 2022

    Resolve
  • Class - 2

    Pedestrian protection doesn't meet code specifications.note:at time of inspection on nb no work in progress observed no light under sws in front of building throughout entire perimeter at exp #1 at 5:30am obser

    Oct 9, 2021 · Penalty $625

    Resolve
  • Class - 1

    28-105.12.8-work does not conform to site safety plan note at the time of my inspection of an active jobsite i observed that there were no safety measures or overhead protection in place at adjacent property at

    Jul 23, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Work without a permit note at the time of my inspection of an active job site i observed a bobcat mechanical ladder on teh slab of the 1st floor upon request of permit to use mechnical equipment on floors for d

    Jul 23, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3303.5.5.2-chute note at the time of my inspection of an active jobsit ei observed an elevator shaft used as c chute from 7th floor to the 1st floor i also observed that the chute in place did not to the 1st

    Jul 23, 2021

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or amendments(needle beam)at the time of inspection of a 14 story new building,i observed on the 3rd and 4th floor needle beam platforms installed on

    Jun 3, 2021

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 7a and 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#809053.remedy:submit acceptable

    Jun 1, 2021 · Penalty $1,250

    Active
  • Class - 2

    3303.12.4 converting elevators.note:at the time of my inspection of anactive jobsite,i observed 2 existing elevators in place being used forconstruction purpose.upon request for notification to the department t

    Jan 8, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the dept of an accident/incident that resulted in anfatality or an injury. during a concrete pump cleaning,a worker got caught in the pump & suffered a cut under his toes. am ambulance was cal

    Sep 15, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by chapter 33(tr1 monitiring report)inadequate. at time of inspection at an active jobsite nb proposed 14 sty mixed use bldg,it was observed upon request

    Oct 9, 2019

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. attime of inspection at an active jobsite nb proposed 14 sty mixed use bldg,it was observed on various floors throughout the bldg inadequate

    Oct 9, 2019

    Resolve
  • Class - 2

    3301.2;signs at time of inspection of proposed 14 story building active jobsite building at interior demo work i observed inadequate and missing exit sign floor sign no smoking signs throughout jobsite provide

    Jun 13, 2019

    Resolve
  • Class - 2

    Housekeeping at time of inspection of proposed 14 story building active jobsite i observed at basement levle large amount of jobiste i observed at basement level large amounts of bricks piled high and scattered

    Jun 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Work does not conform to approved plans at time of inspeciton observed active jobsite building is currently at 7 stories doing interior demo work i observed wood posts at basement being used as posts 9columns)

    Jun 13, 2019

    Resolve
  • Class - 2

    Failure to submit a required cycle 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control # 809053.agg 2 history of non compliance on

    Feb 11, 2019

    Resolve
  • Class - 1

    Failure to maintain bldg exterior walls/facades & appurtenances.south elevation exp#1 :broken window glass @3rd fl.crack decorative stone @roof,cornice north elevation exp#3:vertical cracks @parapet wall & spal

    Jun 21, 2018 · Penalty $2,500

    Active
  • Class - 2

    Failaure to comply with the commissioner's order to file a certificateof correction with the dob for notice of violation #35113387m issued on 3/9/15 pursuant to 28-204.4 & 1rcny 102.1. no certificate of correct

    Apr 28, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:@ 7th floor,excessive water damage to office ceiling.ceiling tiles damaged from leaks have fallen into office work areas.approx.size of holes include 10'x

    Mar 9, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Work w/o a permit.noted:@ roof level & 7th floor,installed attached plumbing & waste lines,undersized broken cracked piper causing damage to structures & offices on 7th fls below.rem:obtain permit or restore pr

    Mar 9, 2015 · Penalty $1,600

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RB)
Year built
1926
Floors
7
Residential units
—
Building area
104,001 ft²
Lot area
10,579 ft²
Zoning
C6-4
Community board
302
Council district
33
Block / lot
166 / 7501
Assessed value
$6,660,799
Landmark / historic district
No

Questions about 285 Schermerhorn Street

Who owns 285 Schermerhorn Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 285 Schermerhorn Street have violations?

NYC HPD has no housing violations on record for this property.

Is 285 Schermerhorn Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 285 Schermerhorn Street built?

City records list 1926 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.