68 Willoughby Street
Brooklyn, NY 11201BBL 3-00152-0028Map
Owner of record: Gotham Capital Realty LLC
68 Willoughby Street is an elevator apartment building built in 1920 in Brooklyn, 11201. It has 30 residential units across 4 floors. The owner of record is Gotham Capital Realty LLC. HPD has recorded 54 housing violations here, most recently on April 12, 2024.
- HPD violations
- 54
- DOB violations
- 24
- ECB violations
- 22
- HPD complaints
- 225
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 19, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 19, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 19, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Nov 19, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ( frame missing ) at public hall, 1st story
Nov 19, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Aug 11, 2007
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of drain pipe exiting through building at south exterior wall , 3rd story
Aug 11, 2007
Closed — Violation closed - BHazardous
Replace with new the missing 5th marble tread up at public hall stairs, 1st story
Aug 11, 2007
Closed — Violation closed - ANon-hazardous
Refit building entrance door , 2nd story
Aug 11, 2007
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing door stop at bottom of building entrance door , 2nd story
Aug 11, 2007
Closed — Violation closed - BHazardous
Properly repair the broken or defective and make operable the intercom system and bell buzzer in the foyer located at apt 2a, 2nd story, 1st apartment from east at south
Jul 26, 2007 · Apt 2A
Closed — Violation closed - ANon-hazardous
Refit door at public hall, 1st story
Jul 26, 2007
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
May 16, 2007 · Apt 2A
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Feb 2, 2006
Closed — Violation closed - BHazardous
Replace with new the broken or defective sheetrock ceiling in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Dec 26, 2005 · Apt 3E
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective sheetrock ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Dec 26, 2005 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Dec 26, 2005 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Dec 26, 2005 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Dec 26, 2005 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 3e, 3rd story, 1st apartment from east at south
Nov 23, 2005 · Apt 3E
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Nov 23, 2005 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Nov 23, 2005 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Nov 23, 2005 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 3e, 3rd story, apartment at south
Nov 23, 2005 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Nov 3, 2005
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective bell buzzer system located at apt 2a, 2nd story, apartment at south
Nov 3, 2005 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east
Oct 28, 2005 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective metal ceiling in the 2nd room from north at west located at apt 2a, 2nd story, 1st apartment from east at south
Feb 8, 2005 · Apt 2A
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Feb 8, 2005 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of door used as second means of egress to fire escape is sealed shut in the 1st room from north at west located at apt 2a, 2nd story, 1st apartment from east at south
Feb 8, 2005 · Apt 2A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at 2nd, 3rd and 4th story balconies at south
Apr 17, 2004
Closed — Violation dismissed - BHazardous
§ 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition at 16 class a apartment created throughout building at address 72 - 70 - 68 willoughby street at entire apartment, apartment
May 27, 2003
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
May 27, 2003
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 27, 2003
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
May 27, 2003
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south rear yard
Nov 17, 2002
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east court and rear yard court
Aug 22, 2002 · Apt 2A
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard yard
Aug 13, 2001
Closed — Violation closed - BHazardous
Replace with new the missing entrance door in the bathroom located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system. in the entire apartment located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing ceramic tile grout at bathtub. in the bathroom located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - BHazardous
Properly secure the loose sink in the kitchen located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - ANon-hazardous
Refit interior room doors. in the entire apartment located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in drain in the bathroom located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin mice and roaches. in the entire apartment located at apt 303, 3rd story
Apr 17, 2001 · Apt 303
Closed — Violation dismissed
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 14 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 26, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 6, 2008
Dob violation - dismissed - Construction other optional
Work without a permit. work noted:gut renovation in progress with demo lition of interior walls throughout and interior wood studs and sheetr ock walls erected throughout third and fourth fls with new plumbing an d electrical work installed throughout. - remedy: stop all work immedi ately make site safe obtain a permit if feasible
Feb 15, 2008
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 24, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 24, 1999
Dob violation - dismissed
ECB violations · 22
- Class - 1
Failure to safeguard all persons & property affected by const ops.noted:@time of insp the public sidewalk blocked by jobsite materials loading sheetrock w/boom truck @4 fl causing pedestrians to walk into on co
Jun 3, 2015 · Penalty $2,400
Resolve - Class - 2
Noted at cellar lvl found 2 wood joists rotten due to water infiltration from 1st floor commercial fish market also observed section of cellar ceiling appx 10'x10' missing sheet rock rem; repair defects & maint
Aug 28, 2012
Resolve - Class - 2
Sec. 28-264.4 failure to file c of c w/dob pursuant to 28-204.2 for violation 34917615m for failure to provide unobstructed exit passageway.remedy: file c of c.
Aug 20, 2011 · Penalty $4,000
Resolve - Class - 2
Sec. 28-201.1 failure to file c of c w/dob pursuant to 28-204.2 for violation 34917607m for failure to maintain etc. remedy: file c of c.
Aug 20, 2011 · Penalty $4,000
Resolve - Class - 2
Failure to correct conditions cited in nov #34917606k for failure to maintain & file c of c w/dob pursuant to 28-204.2. remedy: file c of c.
Aug 20, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34918936h issued on 6/2/11. fail failure to maintain etc. remedy: comply w/the comm's order.
Aug 20, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34918935x issued on 6/2/11. for creating illegal occupancy etc w/o. remedy: comply w/the comm's order.
Aug 20, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to maintain building walls or appurtenances noted: at south elevation roof level masonry brick facade & parapet cracked vertically. approx 1/8" to 1/2" wide over 5 feet (2) fire escape rusted/deteriorat
Jun 2, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:@ main entry stair 1st story to 2nd story handrails not provided @ 2nd story fire escape door obstructed by debris/wood barricade.rem:repair/correct defec
Jun 2, 2011 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a cofc w/the dob for openecb nov#34612293l,34612294n,346598r.rem:comply w/the comm's order to file a cofc
Jun 2, 2011 · Penalty $4,000
Active
Show 12 more ↓
- Class - 1
Failure to provide unobstructed exit passageway. noted: at 2nd story south west exit door obstructed by various misc objects,at 2nd story fire escape misc objects,at 2nd story fire escape platform obstructed by
Jun 2, 2011 · Penalty $1,200
Resolve - Class - 2
Failure to maintain building in code-compliant manner: failure to provide required corridor width per bc 1016.2;27-369. noted: at roof level goose neck fire-escape ladder obstructed by exhaust duct.
Jun 2, 2011 · Penalty $2,500
Active - Class - 3
Occupancy contrary to that allowed by the c of o c of o 118834 issued 10/23/47 c of o indicates premises is to be occupied as stores 1st fl factory offices trade school 2nd fl factory & offices on 3 & 4 flrs
Jun 7, 2010 · Penalty $250
Resolve - Class - 2
Work w/o permit work noted partitions erected to create separate rms full 3pc btrm & ktcn also installed to create class a apt on 2nd fl rem: obtain permits and approvals if feasible or restore premises to prio
Jun 7, 2010 · Penalty $4,000
Active - Class - 2
97x07. 97x- restore to service.
Jan 20, 2009 · Penalty $2,500
Resolve - Hazardous
Failure to comply w/ an order of the commissioner and correct violation 34612293l for creating apts at 3rd and 4th flrs w/o a permit. no record of correction in dob records. remedy: correct condition cited in
May 29, 2008 · Penalty $5,000
Active - Non-hazardous
Occupancy contrary to that allowed by c of o or bldg dept records:illegal occupancy noted: second (2) flr found with apt (2a) arranged & occupied as a class a apt for dwelling contrary to c of c #118834 dated
Feb 6, 2008 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit. illegal work noted: existing violation on records with dept for illegal occupancy: apartments on the 2nd flr which is contrary to c of o # 118834 dt oct 23, 1947 (which specified (2)2nd flr
Feb 6, 2008 · Penalty $2,500
Active - Hazardous
Work w/o a permit work noted on 3rd and 4th flrs partition walls were erected creating numerous apts kitchens gas stoves installed also bathrooms constructed all work done w/o approvals and permits remedy:
Jan 16, 2008 · Penalty $2,500
Active - Hazardous
Occupancy contrary to that allowed by the bldg dept of records found site occupied as offices & commerical use 3rd & 4th fl were converted into numerous apt on 3rd fl 5 apt on 4th fl 4 apt.remedy:illegal occupa
Jan 16, 2008 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy or building department records. noted:building department records cofo #123744 legal use cellar ordinary use, first floor store, second, third
Mar 13, 2003 · Penalty $800
Resolve - Hazardous
Work without permit, work ntoed: at 3rd and 4th follr, partitions erected to create approx 14 class"a" apts. each containing bedrooms, 3 piece bathrooms and kitchens w/gas stoves. remedy: obtain permit or resto
Apr 27, 2002 · Penalty $2,500
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 16, 2026 · Apt BLDG
Close - Door/window
Door
Apr 28, 2026 · Apt 4G
Close - Door/window
Door
Mar 24, 2026 · Apt 4G
Close - Door/window
Door
Feb 17, 2026 · Apt 4G
Close - Safety
Smoke detector
Dec 8, 2025 · Apt 4D
Close - Unsanitary condition
Mold
Sep 11, 2025 · Apt 3D
Close - General
Ventilation system
Jul 23, 2025 · Apt 5A
Close - Appliance
Electric/gas range
Jul 23, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt 4H
Close
Show 40 more ↓
- Unsanitary condition
Sewage
Nov 13, 2022 · Apt 2B
Close - Water leak
Slow leak
Feb 25, 2022 · Apt 5B
Close - Door/window
Door
Sep 10, 2021 · Apt 2H
Close - Appliance
Electric/gas range
Nov 13, 2019 · Apt 2F
Close - Appliance
Electric/gas range
Oct 22, 2019 · Apt 2F
Close - Water leak
Heavy flow
Jun 30, 2015 · Apt 1FL
Close - Heating
Heat related
Feb 1, 2013 · Apt NA
Close - Heating
Heat related
Jan 3, 2012 · Apt 3A
Close - Plumbing
Water-leaks
Apr 8, 2008 · Apt 2C
Close - General
Ventilation system
Apr 8, 2008 · Apt 2C
Close - General
Mold
Apr 8, 2008 · Apt 2C
Close - Paint/plaster
Ceiling
Apr 8, 2008 · Apt 2C
Close - Plumbing
Water-leaks
Apr 8, 2008 · Apt 2C
Close - Electric
Lighting
Feb 8, 2008 · Apt 2A
Close - Nonconst
Carbon monoxide
Feb 8, 2008 · Apt 2A
Close - Nonconst
Janitor/super
Feb 8, 2008 · Apt 2A
Close - Paint/plaster
Wall
Feb 8, 2008 · Apt 2A
Close - General
Stairs
Feb 8, 2008 · Apt 2A
Close - General
Windows
Feb 8, 2008 · Apt 2A
Close - Plumbing
Water-leaks
Feb 8, 2008 · Apt 2A
Close - Nonconst
Vermin
Feb 8, 2008 · Apt 2A
Close - General
Floor
Feb 8, 2008 · Apt 2A
Close - General
Fire-escape
Feb 8, 2008 · Apt 2A
Close - Electric
Bell-buzzer/intercom
Feb 8, 2008 · Apt 2A
Close - Electric
Wiring
Feb 8, 2008 · Apt 2A
Close - Electric
Bell-buzzer/intercom
Feb 8, 2008 · Apt 2A
Close - Electric
Wiring
Feb 8, 2008 · Apt 2A
Close - Paint/plaster
Wall
Feb 8, 2008 · Apt 2A
Close - Plumbing
Bathtub/shower
Feb 8, 2008 · Apt 2A
Close - Plumbing
Bathtub/shower
Feb 8, 2008 · Apt 2A
Close - Plumbing
Radiator
Feb 8, 2008 · Apt 2A
Close - Plumbing
Sewer
Aug 1, 2007 · Apt 2A
Close - Nonconst
Rubbish
Aug 1, 2007 · Apt 2A
Close - General
Stairs
Aug 1, 2007 · Apt 2A
Close - General
Doors
Aug 1, 2007 · Apt 2A
Close - Nonconst
Rubbish
Jul 20, 2007 · Apt 2A
Close - Nonconst
Rubbish
Jul 20, 2007 · Apt 2A
Close - General
Doors
Jul 20, 2007 · Apt 2A
Close - Electric
Bell-buzzer/intercom
Jul 20, 2007 · Apt 2A
Close - Plumbing
Radiator
Jul 20, 2007 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1920
- Floors
- 4
- Residential units
- 30
- Building area
- 28,527 ft²
- Lot area
- 9,947 ft²
- Zoning
- C6-4.5
- Community board
- 302
- Council district
- 33
- Block / lot
- 152 / 28
- Assessed value
- $5,137,650
- Landmark / historic district
- No
HPD registration #386443, last renewed Jun 26, 2025.
Questions about 68 Willoughby Street
Who owns 68 Willoughby Street?
The owner of record in NYC Department of City Planning PLUTO data is Gotham Capital Realty LLC.
Does 68 Willoughby Street have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 68 Willoughby Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 68 Willoughby Street built?
City records list 1920 as the year it was built.
How many apartments are in 68 Willoughby Street?
It has 30 residential units and 34 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.