229 Duffield Street
Brooklyn, NY 11201BBL 3-00146-0014Map
Owner of record: The Webster Apartments (A Corporation)
229 Duffield Street is a hotel built in 2009 in Brooklyn, 11201. The owner of record is The Webster Apartments (A Corporation). HPD has recorded 7 housing violations here, most recently on June 9, 2025.
- HPD violations
- 7
- DOB violations
- 41
- ECB violations
- 49
- HPD complaints
- 16
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventlation system at ceiling in the entire apartment located at apt 504, 5th story, 1st apartment from east at south
Jul 31, 2022 · Apt 504
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grouted joints / caulking surface of visible mold at north wall at showerstall in the bathroom located at b-room 905, 9th story, 2nd b-room from north at east
Mar 15, 2021 · Apt 905
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 15, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jan 15, 2020
Closed — Violation closed
DOB building violations · 41
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 31 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
Cease use
Apr 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 14, 2010
Dob violation - dismissed - Construction other optional
Failure to provide adequate protection at side of excavation 6' 6" exc avation at elevator pit at exp 4 w/o dracing has compromised exp 4 pil es from supporting its rated lateral load remedy: stop all work back fill exp 4 side of elevator pit amend plans to show restructure of soe for elevator pit
Sep 22, 2009
Dob violation - dismissed
ECB violations · 49
- Class - 2
Failure to submit an acceptable required cycle 8a and 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#918360.rem:submit acceptable req
Dec 2, 2022 · Penalty $625
Resolve - Class - 2
Failure to file annual cert that cooling tower 1000002167 has been inspected,tested & disinfected, & that a maintenance plan has been developed & implemented,by november 1,2016.rem:file annual cert.
Jun 20, 2017
Resolve - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015 · Penalty $800
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. as noted: at time of inspection at above active construction site observed suspended scaffold hang from exp 1 & 2
May 12, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guard rails as noted: at time of inspection at aboveactive construction site observed no guard rail provided on 2nd flr
May 12, 2011 · Penalty $2,400
Resolve - Class - 2
Sec. 3314.4.3. no record of daily inspection of supported scaffold performed by competent person at site. as noted: at time of inspection atabove active construction site observed pipe scaffold erected on 19 fl
May 12, 2011
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate. as noted: @time of inspection @ above active construction site observed workers (luis a. sanchez & danil bogdoshov) were using pipe scaffold on 19th
May 12, 2011 · Penalty $1,600
Resolve - Class - 1
Sec. 28-407.1. failure to have welders license for manual structural welding. as noted: at time of inspection at above active construction site observed the worker welding steel bracket w/structural member of
May 12, 2011 · Penalty $1,600
Resolve - Class - 2
Work contrary to approved plan - upon inspection noted 16'high sidewalk shed existed in front of the bldg has been removed and 8' high shed is in the process of erection in place of 16'high sidewalk shed is in
May 3, 2011
Resolve - Class - 2
Bc3310.3)partial stop work order(2point suspended scaffold located on exp#1 & 4).issued pursuant to 28-207.2 & posted @ premises.failure to comply w/ site safety problem.upon inspection 2point suspended scaffol
Oct 18, 2010
Resolve
Show 39 more ↓
- Class - 2
(misc)1906.3no concrete form work design drawings.upon insp on 19flr @exposure 1 2.columns erected & in progress of being formed aprox 20ft high exceh.no design drawings for form work & bracing (form work desig
Aug 24, 2010 · Penalty $4,000
Resolve - Class - 1
Directed the use of a power operated hoisting machine w/o an operator's license. (cherry picker crane cd #4107 was driven to job site by an unlicensed oiler when they were parking at site had to lift boom & did
Jul 12, 2010 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments at time of insp crane and staging area not set up according to site safety plan rem; amend site safety plan stop all use of pi
Jul 12, 2010
Resolve - Class - 1
Failure to safeguard public & property affected by construction operation at time of insp observed a staging () set up in front of 225 & 227duffield w/ sidewalk shed there is no chicken wire barrier between the
Jul 12, 2010 · Penalty $12,000
Resolve - Class - 2
Failure to provide dot permit at time of insp observed staging area set up to front of adjacent properties 227-225 duffield st no dot permitprovided to front there properties rem: obtain dot permit for 275-227
Jul 12, 2010
Resolve - Class - 1
Sec. 1905.6.3.2 failure to stored strength test cylinders in field storage curing box at site as noted: at time of inspection on a active construction site building upto 13 stories,delta testing lab molded 12
Jun 23, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. 1905.6.3.2 failure to stored strength test cylinder in filed storage curing but at site. as noted: at time of inspection on a active construction site,building upto 13 stories,delta testing lab molded 12
Jun 23, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to provide toe boards @ time of inspection observed no toe boards @ elevator shafts on all flrs the plywood provided falls short of covering the or fire opening.rem:provide toeboards @ elevator shafts
Jun 22, 2010 · Penalty $1,600
Resolve - Class - 1
(misc)3308.3failure to maintain vertical nets @ time of inspection,observed vertical nets @ perimeter of bldg not scanned to columns-this condition occurs throughout all flrs-this condition leaves & open space
Jun 22, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard public property upon arrival on site concrete trucks in street washing out,from concrete operating for 229 duffield driver using hose & spray falling onto sdwlk which is open to pedestrian
Jun 22, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard public & property.while pouring concrete on 13th flr the column form broke(collar bracing gaur)causing concrete to spill out of column on 12fl onto adjoining property,roofs & stone into net
Jun 22, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations.note:@ time of insp,observed fire hydrant siamese connection @ exposure(s)being obstructed by a flatbed trailer approx 35ft leavin
Jun 7, 2010 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments.note:@ time of inspection @ above site observed flatbed traioler & rebar staged outside of truck approved pick zone.site safety p
Jun 7, 2010
Resolve - Class - 2
1001.1 failure to provide required means of egress off the working deck.note:at time of inspection at above site observed concrete poured onthe 10th floor deck.there is no 2nd means of egress provided while co
Jun 4, 2010
Resolve - Class - 1
Work w/o a permit. noted: at time of inspection at above active site, forming 7th flr in progress observed pipe scaffold approx 12'high erected approx 1' flr from the edge of the bldg on the 6th flr at exp 2,
May 10, 2010 · Penalty $8,000
Resolve - Class - 2
Work does not conform to approved construction docs and/or amendments.note: at time of inspection at above site, forming of 7th floor in pr ogress, observed tylsr barricaded at exposure (1) occupying approx 18'
May 10, 2010 · Penalty $250
Resolve - Class - 1
Sec. 3303.4. failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at above active site forming 7th flr in progress. observed pile of debris in various locations
May 10, 2010 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noted: at time of inspection at above site bldg up to 6th flr forming 7th flr there is no overhead protection provided 3 & 4 flr
May 10, 2010 · Penalty $2,400
Resolve - Class - 2
Sec. 1906.6.1.2. reshores not secured 10' from facade. noted: at time of inpection at above active site bldg up to 6th flr observed approx 7reshores not secured at exp 1 - 2nd flr. remedy: secure all reshores
May 10, 2010
Resolve - Class - 2
1906.6.1.2 failure tosecure reshorer in proximity to facades as noted at time of inspection on a active construction site concrete operation in progress on flr 2 at exposure 2,3,4 reshores are not secure to the
May 5, 2010 · Penalty $400
Resolve - Class - 1
Storage of material during construction at time of inspection on a active construction site concrete operation in progress on flr 2,3,at exposure #2,3 material is stored with in 10 ft from edge of slab flr 2 wo
May 5, 2010 · Penalty $2,400
Resolve - Class - 2
1906.6.1.2 reshores in promixity of facades at time of insp reshores throughout site at all four exposures were not secured within 10 ft of facade provide secures of reshores within 10 ft of facade as per nyc
May 3, 2010 · Penalty $400
Resolve - Class - 1
Work w/o a permit noted at time of inspection installed sidewalk shed at exposure 1 front of premises no permit was obtained to do work. also installed elec lines lights under sidewalk shed. no permit was obtai
Apr 26, 2010 · Penalty $800
Resolve - Class - 1
3311.4.9.explosive powered & projectile tools.noted @ time of inspection 3rd fl 22 shoot powered projectile tool ov floor when asked for cert of fitness issued by fire dept no worken could produce ove.remedy:st
Apr 13, 2010 · Penalty $1,600
Resolve - Class - 1
3307.1.fail to provide adequate overhead protection for pedestrian sidewalk @ time of inspection no dot permit issued for moving pedistriansinto street.form work in progress @ 4th fl approx 38ft high no overhea
Apr 13, 2010 · Penalty $1,600
Resolve - Class - 2
3301.7.design required noted @ time of inspection forming 4th fl @ exposure 2 & 4 work platforms erected 2 & 3 fls extending off side of bldg no design drawing provided upon request.remedy:stop all work on plat
Apr 13, 2010 · Penalty $400
Resolve - Class - 2
Work does not conform to approved site safty plan.noted @ time of inspforming 4th fl approx 38' high site saftey plan calls for over head protection to be provided in yards of adjoining property @ exposure 2 &
Apr 13, 2010 · Penalty $250
Resolve - Class - 2
Work does not conform to approved construction documents/amendments noted @ time of inspection on a active construction site concrete operation in progress,fl 2,concrete deck,doka support of slabs & beams forms
Mar 29, 2010 · Penalty $2,500
Resolve - Class - 2
Sec. bc 3307.2.1 failure temporary lighting for walkway on the roadwayupon inspection noted: sidewalk in front of job site has been occupied,temporary walkway has been set up in roadway for the pedestrians.
Feb 23, 2010 · Penalty $400
Resolve - Class - 1
Sec. 3310.9.1. failure to provide concrete site safety manager. upon inspection as noted on active construction site they were pouring concrete at 1st flr (ground) level, basement and retaining walls already
Feb 22, 2010 · Penalty $8,000
Resolve - Class - 1
Sec. 1905.6.3.2 failure to provide field storage curing facility. (curing box on site) as noted: at time of inspection on a active construction site,concrete placement in progress for slab on grade approx 350
Dec 16, 2009 · Penalty $1,600
Resolve - Class - 2
Sec. 1 rcny 5-02(a)(13) failure to provide employee with photo iddentification card. as noted: at time of inspection on a active cconstruction site,concrete placement in progress for slab on grade approx 350 yd
Dec 15, 2009
Resolve - Class - 2
Sec. 5-02(a)(13) failure to provide employee with photo identification card as noted: at time of inspection on a active construction site. concrete placement in progress for slab on grade approx 350 yds. a tech
Dec 15, 2009
Resolve - Class - 1
Sec. bc 1704.4 failure to provide adequate testing accordance with bc 1704.4 no air air meter as noted: at time of inspection on a active construction site,concrete placement in progress for slab on grade app
Dec 15, 2009 · Penalty $1,600
Resolve - Class - 1
Sec. bc 1704.4 failure to provide adequate testing accordance with bc 1704.4 no air meter as noted: at time of inspection on a active construction site,concrete placement in progress for slab on grade approx
Dec 15, 2009 · Penalty $1,600
Resolve - Class - 2
Work does not confirm to approved site safety plan excavation is in progress approx 15'deep excavation the ramp provided for the egress / ingress the slope is note conforming the approved slope which is 1:4 as
Nov 12, 2009
Resolve - Class - 1
3304.7 misc.vio.failure to provide adequate means of egress from excavation.ladder leading from elevator pit lead to an inadequate angle of repose 80 degree incline 15'hight which did not allow for adequate egr
Sep 22, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to provide protection at sides of excavation. at exp. 1 contractor failed to provide adequate angle of repose excavation is at 20" approx. with a 80 dgree angle of repose.remedy:comply with notice of vi
Sep 22, 2009 · Penalty $2,400
Resolve - Non-hazardous
Occupancy contrary to that allowed by building dept. records in that at the time of this inspection form. 4 automobiles parked on open lot. remedy:obtain valid cofo if feasible.
Dec 30, 1993
Resolve
Complaints
- Heat/hot water
Entire building
Sep 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 29, 2025 · Apt BLDG
Close - Plumbing
Water supply
Sep 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 29, 2025 · Apt 1901
Close - General
Ventilation system
Jul 19, 2022 · Apt 504
Close - Water leak
Heavy flow
Jul 5, 2022 · Apt 608
Close - Unsanitary condition
Mold
Jul 5, 2022 · Apt 608
Close - Unsanitary condition
Mold
Jun 25, 2022 · Apt 608
Close - Water leak
Heavy flow
Jun 25, 2022 · Apt 608
Close
Show 6 more ↓
- Water leak
Heavy flow
Jun 25, 2022 · Apt 608
Close - Heat/hot water
Entire building
Mar 12, 2021 · Apt 905
Close - Heat/hot water
Entire building
Feb 26, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2021 · Apt 306
Close - Unsanitary condition
Pests
Jan 13, 2020 · Apt 110817
Close - Unsanitary condition
Garbage/recycling storage
Jul 15, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2009
- Floors
- 19
- Residential units
- —
- Building area
- 56,626 ft²
- Lot area
- 4,345 ft²
- Zoning
- C6-4.5
- Community board
- 302
- Council district
- 33
- Block / lot
- 146 / 14
- Assessed value
- $7,373,250
- Landmark / historic district
- No
HPD registration #385971, last renewed Jul 24, 2025.
Questions about 229 Duffield Street
Who owns 229 Duffield Street?
The owner of record in NYC Department of City Planning PLUTO data is The Webster Apartments (A Corporation).
Does 229 Duffield Street have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 229 Duffield Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 229 Duffield Street built?
City records list 2009 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.