285 Jay Street
Brooklyn, NY 11201BBL 3-00131-0001Map
Owner of record: NYC Department Of Education
285 Jay Street is a school building built in 2015 in Brooklyn, 11201. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 191
- ECB violations
- 131
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 191
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2021
Dob violation - active - Elevator elevatorrequired
Cease use
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2020
Dob violation - resolved - Elevator elevatorrequired
Cease use
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2018
Dob violation - resolved
ECB violations · 131
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917863. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain = pump leaking on water make-up tank, missing spill switch and manual reset high limit on domestic gas fired hot water boiler laars lo-625, maintain boiler
Feb 18, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at cellar level,ceiling tiles are missing throughout the cellar corriudor. remedy: replace ceiling tiles.
Jun 26, 2020 · Penalty $625
Resolve - Class - 2
Exit door not self closing. noted: at 1st fl,main entrance at tillary street side 3 exit doors are not self closing. also at 4th fl at stair'a'exit door not self closing. remedy: repair/replace door.
Jun 26, 2020 · Penalty $625
Resolve - Class - 2
Reissue#35414783n failure to maintain bldg in code compliant manner. noted: at 1st fl smoke door next to room 104,& stair b,c,f doors are indisrepair. remedy: repair/replace door.
Jun 26, 2020 · Penalty $1,562
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at cellar atelectrical room,loose wires hanging down in open metal box. remedy: comply w/notice of violation.
Jun 26, 2020 · Penalty $625
Resolve - Class - 2
Pedestrian protection does not meet code specification(not installed to face of building leaving a wide gap).at time of inspection i observed a sidewalk shed installed at exp#2 as protection for incomplete cons
Feb 6, 2020 · Penalty $2,400
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation#35354507p issued on 01/07/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi
Dec 9, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation#35354506n issued on 01/07/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi
Dec 9, 2019 · Penalty $3,125
Resolve - Class - 2
Vandal proof fixtures under sidewalk shed. at the time of inspection iobserved sidewalk shed at exposure 2 w/ 8 lightbulbs and out of 8 lightbulbs only 3 are working. this can potentially create a hazardous con
Sep 25, 2019
Resolve
Show 40 more ↓
- Class - 2
Stair and/or floor identification signs missing and/or defective. noted: (3rd fl) staircase near rm 326 with having no stair or floor lettering/number sign. remedy: install and/or repair signs
Apr 16, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted:at(4th fl) stair a,b(3rd fl) stair a,b(2nd fl) stair a,b,f,hallway door near rm262(1st fl) stair b,c,f and main entry exit 12 doors are in disrepair/
Apr 16, 2019
Resolve - Class - 2
Failure to maintain building walls or appurtenances. noted:at(4th fl) rm 454 462,434 (3rd fl)rm 305 (basement)gas meter rm w/ having water penetration/damage and staining to walls,ceilings and floor cement/plas
Apr 16, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner. illumination for exits,exit discharges and public corridors per bc 1006.1;27-381. noted:at(3rd fl) exit sign stair f(1st fl) gym emergency lights are non o
Apr 16, 2019
Resolve - Class - 2
Exit door not self-closing. noted: at (4th fl) stair g (3rd fl) stair e (1st fl) stair c door checks are in disrepair non operational. remedy: repair/replace door
Apr 16, 2019
Resolve - Class - 2
Failure to maintain building in code compliant manner. lack of emergency lighting for exits,exit discharges and public corridors per bc 1006.1;27-542. noted:at(3rd fl) no exit sign/removed near rm 326. remedy:r
Apr 16, 2019
Resolve - Class - 2
Temporary construction equipment on site-expired permit. note: observed sidwalk shed is in place with permit # b00077518-i1-sh expired on 1212-31-2018. remedy: renew permit.
Jan 7, 2019 · Penalty $1,250
Resolve - Class - 2
3307.6.4.9 avoid interference. note: observed a sidewalk shed is partially blocking the access to the bus stop. remedy:comply with the code.
Jan 7, 2019 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site exp permit 5 sty occupied bldg under alt-3 construction no active job site. time of ijnspection i observed street lane was closed by equipment fence & barriers upon requ
Sep 19, 2018 · Penalty $3,125
Resolve - Class - 1
Sec. 3314.8.1 failure to maintain mesh at temporary construction fence as required. at time of inspection of a 5 sty alt-3 bldg,no work in progress at this time,i observed that the mesh affixed to the temporary
Sep 19, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to post permits for work at premises. at time of inspection of a 5 sty alt-3 bldg,no work in progress at this time,i observed that there were no permits posted at job site fence for work in progress as
Sep 19, 2018 · Penalty $655
Resolve - Class - 1
Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 8 sty bldg at rooflevel construction work in progress. i observed exterior overhead work
Aug 9, 2018 · Penalty $2,500
Resolve - Class - 2
Exit door not self closing, @ time of insp stair 'c' on 4th flr (new bldg) not close properly on the right door, stair 'c' on 2nd flr left door not close properly, stair 'e' not self closing, room 167 (gym) 1 d
May 11, 2017
Resolve - Class - 2
Sec: 28-301.1. unlawful placement of furnishings, decorations or otherobjects @ exits that obstruct access to,egress from or visibility there of per fdny 2008 code; fc 1027.4 @ the time of insp, in room 167 (gy
May 11, 2017
Resolve - Class - 1
33034.5.1 material at the edge of the building when not being used within 10 feet... noted: loose pipes, scaffold parts stored within 10 feet to the edge on 3rd floor. inadequate zero cable observed throughout
May 9, 2016 · Penalty $1,600
Resolve - Class - 1
3314.4.6 use of supported scaffold without a scaffold user certificate. noted: worker up on the supported scaffold (welding)- no scaffold user certificate available for review. remedy: discontinue activity or o
May 9, 2016 · Penalty $400
Resolve - Class - 1
No toe boards/inadequate zero cable. noted: active construction site, building topped off (8stories)inadequate zero cable erected on 6th an d 7th, 5th - few inches all the floor, loose debri around. potential d
May 9, 2016 · Penalty $1,000
Resolve - Class - 2
Work does not conform to approved construction documents-site saftey plan. noted: plastiic barricades in place on jay street instead of concrete barricade as pen site saftey plan. remedy: conform to approve sit
May 9, 2016
Resolve - Class - 1
3301.7 design drawing. noted: workers on 7th floor in elevator shaft on working platform (welding)- no design drawing available at time of inspection. pswo issued pursuant to 28-207.2 and posted at premesis. re
May 9, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard. noted: worker on 6th floor next to elevator shaft, working off a frame ladder (no guard rail in place, harness not on)- potential danger for that worker fall down into elevator shaft. reme
May 9, 2016 · Penalty $10,000
Resolve - Class - 2
Failure to comply with nyc fire code.general no fire watch,fire guard certificate of fitness at time of inspection the following was observed:8 story steel frame building has 2 men working on decking while use
Jul 21, 2015
Resolve - Class - 1
3303.4.1 maintenance. at time of inspection, the following was observed. site safety manager states that worker fell down, while installing staircase. tripped while carrying cluminium beam down staircase which
May 19, 2015 · Penalty $1,000
Resolve - Class - 2
Reissue #35085606h defective stone at parapet level.noted loose, spalling stones, mortar joints also missing, loose. rmdy: repair/replace noted defects.
Mar 6, 2015
Resolve - Class - 2
Reissue #35085607j water penetration into room 404,403,402,462,305 evident signs of water penetration. rmdy: seal penetration.
Mar 6, 2015
Resolve - Class - 1
Sec. 3304.7 safe means of ingress & egress. note: at the time of my inspection construction work in progress. i observed that stair tower & ladder use for egress & ingress into foundation & soe operation approx
Oct 24, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. note: at the time of inspection construction work in progress. i observed that guard rails made out of netting
Oct 24, 2014 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved construction &/or approved amendments. note: at time of my inspection construction work in progress. construction work include foundation work & soe at a depth of approx 35feet
Oct 24, 2014 · Penalty $250
Resolve - Class - 2
Work does not conform to approved const.docs &/or amendments. at the time of inspec.section of the doe installation at exp4 jay st. was not done as per the approved plans the tope of soe is approx.3ft 3'-0" bel
May 30, 2014 · Penalty $530
Resolve - Class - 2
3307.5. watch persons.@ time of insp no watch person.observed & contractor states no watch person on site for job site @ excavation of new bldg under construction.site is well over(footprint) of 5000 sf.rem:obt
Apr 29, 2014
Resolve - Class - 2
3307.2.1 temp.walkways.noted:@ time of insp,@ proposed new bldg @ excavation stage has created a walkway @ exp.2 with concrete barriers with no illumination for pedestrians as per update 45.rem:provide walkway
Apr 29, 2014
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp construction no toe boards @ time of insp.surrounding excavation with guard rail system @ exp.1 & 2.creating a hazardous condition for on site wor
Apr 29, 2014 · Penalty $1,000
Resolve - Class - 2
Water penetration into room 404, 403, 402, 305 evident signs of water penetration. remedy: seal penetration
Apr 8, 2014
Resolve - Class - 2
Exit passageway obstricted at 4 fl with tables, chairs. remedy: removeobstructed
Apr 8, 2014
Resolve - Class - 2
Defective store at parapet level noted loose, spalling, stones mortar joints also missing, loose. remedy: make safe
Apr 8, 2014
Resolve - Class - 2
Fence does not conform to code - upon inspection noted: 8ft high solidplywood fence exists around this site. also noted: 1) the fence is blue instead of painted hunter gree, 2) no viewing panel in the entire
Nov 2, 2013
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. noted construction site fence under permit #320730358-01-eq-fn issued 7.9.13 does not comply to ll47/2013. fence project information panel
Oct 4, 2013
Resolve - Class - 2
The plaster on the wall is cracked located in room 410 4th flr level. remedy: repair/replace cracked plaster.
Apr 24, 2013
Resolve - Class - 2
The corridor hallway is partially obstructed by tables, chairs, boxes and wagons located near room 418 4th flr level. remedy: remove obstruction.
Apr 24, 2013
Resolve - Class - 2
Metal grate on tech place has uplifted approximately 4" causing a tripping hazard. remedy: repair metal gratings. (push) metal grate along w/side walk.
Apr 24, 2013
Resolve - Class - 2
Reissue: 34953716j. the concrete wall & ceiling is cracked located at room b30 at basement level. remedy: repair/replace cracked wall/ceiling.
Apr 24, 2013
Resolve
Complaints
- Nonconst
Vermin
Aug 21, 2006 · Apt 303
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 2015
- Floors
- 8
- Residential units
- —
- Building area
- 614,739 ft²
- Lot area
- 139,810 ft²
- Zoning
- C6-4
- Community board
- 302
- Council district
- 33
- Block / lot
- 131 / 1
- Assessed value
- $50,926,500
- Landmark / historic district
- No
Questions about 285 Jay Street
Who owns 285 Jay Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 285 Jay Street have violations?
NYC HPD has no housing violations on record for this property.
Is 285 Jay Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 285 Jay Street built?
City records list 2015 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.