250 Water Street
Brooklyn, NY 11201BBL 3-00042-0016Map
Owner of record: M Moore LLC
250 Water Street is a walk-up apartment building built in 2018 in Brooklyn, 11201. It has 3 residential units across 5 floors. The owner of record is M Moore LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 15
- ECB violations
- 17
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 15
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed
Show 5 more ↓
- Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
3
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 1989
Dob violation - resolved - Elevator elevatorrequired
Restore elevator to service
Jul 12, 1988
Dob violation - resolved - Elevator elevatorrequired
(51)restore elevator service
Jul 12, 1988
Dob violation - resolved
ECB violations · 17
- Class - 2
Temp const equipment onsite-expired fence permit.note:atoi of 5stynb currently@roof level.i observed const fence@exp1 permit321404636-03-eq-fn w/expired date11/5/20&had no renewal.comply w/code&renew fence perm
Jul 12, 2021
Resolve - Class - 1
Failure to file evidence of liability &/or property damage insurance.note:atoi for 5stynb currently@roof level.i observed theres no valid general liability insurance in record as insurance policy600gl0177547 by
Jul 12, 2021
Resolve - Class - 1
Sec. 3314.1 inadequate supporting scaffold. at time of my inspection or an active jobsite of a 5 sty bldg,i observed a supporting scaffold erected to roof level. upon doing my inspection,i noticed pipe scaffold
Feb 26, 2020 · Penalty $6,250
Resolve - Class - 2
Bc3309.10/inadequate roof protection @ exposure 2.roof prtection located @ exposure 2 was inadequate. roof protection never meet its full and complete requirements which are 20 ft on each expsure coping stone a
Dec 12, 2019 · Penalty $3,125
Resolve - Class - 1
Bc3301.6/design drawings.at time of inspection observed manual pulley on supported scaffold towards exp#4 on roof level attached with embedded strap on a bicyce in addition mechanical hoist on 5th flr attached
Dec 12, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to have on-site docs.required by chapter 33(safety strap layout location plan/inspection log).at time of inspection,i observed an active construction site with conc embedded safety straps on various fls
Jul 18, 2019 · Penalty $1,250
Resolve - Class - 2
Bc 3309.14 failure to protect adjoining property window.at time of inspection,i observed an active const.site with on-going conc form installation & scaffolding erection in progress.it was observed that contrac
Jul 18, 2019 · Penalty $625
Resolve - Class - 1
Work contrary to plan (temp construction equipment needle bea ) at time of inspection i observed an active construction site with a needle beam installed/erected on different exp(exp 4,3 &2) respectively upon v
Jul 18, 2019 · Penalty $2,500
Resolve - Class - 1
Bc 3309.10 no roof protection(adjoining property)at time of inspectioni observed an active construction site with installation of pipe scaffolding and concrete form installation going-on,@roof level.it was obse
Jul 18, 2019 · Penalty $2,500
Resolve - Class - 2
Work contrary to plan(sws)sidewalk shed.at time of inspection,i observed an active construction site with an sws erected & installed at the front of the bld.(site).upon reviewing the approved drawing on site,it
Jul 18, 2019 · Penalty $625
Resolve
Show 7 more ↓
- Class - 2
Sec. 3305.3.6.1.2 reshores in proximaty to unenclosed perimeters. at time of inspection of a 5 sty bldg under construction i observed several reshores at the leading edge of poured concrete floors not secured
Apr 19, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to provide unobstructed exit passageways.at the time of my inspection of proposed 5 story building currently at 2nd floor level with construction operations in progress.i obsevred passage ways at first
Feb 14, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate housekeeping,at the time of my inspection of a proposed 5 story buidling currently at 2nd floor level with construction operations in progress.i observed inadequate housekeeping as
Feb 14, 2019 · Penalty $2,500
Resolve - Class - 2
Sec. 3303.1.3 contractors shed,office or (shanty)w/i 30feet of new construction or existing bldg is contructed of combustle material. at the time of inspection it was observed that the contractors installed a
Apr 24, 2018
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsite at time of inspection. at the time of inspection it wad observed thatthe contractors performed demolition work but could not produce the
Apr 24, 2018
Resolve - Class - 2
Failure to maintain/display on site documents required by chapted 33. at the time of inspection it was observed that the contractors performed excavation related activities & soe work upon review of the monitor
Apr 24, 2018
Resolve - Class - 2
Sec. 28-105.12.8 work is not accordance w/site safety plan. at the time of inspection it was observed that the contractors did not follow their site safety plan for the excavation phase they were in. no movable
Apr 24, 2018
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2018
- Floors
- 5
- Residential units
- 3
- Building area
- 14,526 ft²
- Lot area
- 6,942 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 33
- Block / lot
- 42 / 16
- Assessed value
- $721,380
- Landmark / historic district
- No
Questions about 250 Water Street
Who owns 250 Water Street?
The owner of record in NYC Department of City Planning PLUTO data is M Moore LLC.
Does 250 Water Street have violations?
NYC HPD has no housing violations on record for this property.
Is 250 Water Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 250 Water Street built?
City records list 2018 as the year it was built.
How many apartments are in 250 Water Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.