66 Water Street
Brooklyn, NY 11201BBL 3-00036-0016Map
Owner of record: Dumbo Lofts Rental LLC
66 Water Street is an elevator apartment building built in 1850 in Brooklyn, 11201. It has 24 residential units across 5 floors. The owner of record is Dumbo Lofts Rental LLC. HPD has recorded 29 housing violations here, most recently on March 5, 2019. 3 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 35
- ECB violations
- 14
- HPD complaints
- 23
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2e, 2nd story, 2nd apartment from east at south
Mar 5, 2019 · Apt 2E
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Mar 5, 2019
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 5, 2019
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ( notice missing ) at public hall, 1st story
Mar 5, 2019
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood floor in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Jul 11, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from east at south located at apt 3f, 3rd story, 3rd apartment from east at south
Jul 11, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 2nd room from east at south located at apt 3f, 3rd story, 3rd apartment from east at south
Jul 11, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east and north wall ( apprx.5 sq.ft) in the 2nd bathroom located at apt 3f, 3rd story, 3rd apartment from east at south
Jul 11, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling,east and north walls in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Jul 11, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective brick work from cellar to roof at west wall at south yard
May 25, 2013
Closed — Violation closed
Show 19 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
May 25, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
May 25, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
May 25, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
May 25, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor sagging (approx., 2 inces. drop-off) from wall to center floor in the entire apartment located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 10; inproperly installed (total-10) in the entire apartment located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor sagging in the 1st room from north located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling, north, east and south walls in the bathroom located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, in the 3rd room from north at west located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall in the 1st room from north located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south walls in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Mar 3, 2013 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall, east wall in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall, east wall, west wall in the 2nd bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, east wall, west wall in the 2nd bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, east wall in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the 2nd bathroom from north located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 29, 2013 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 10; , 3rd story, apartment
Jan 16, 2013 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling, west and north walls in the 2nd bathroom from north at west located at apt 3f, 3rd story, 3rd apartment from east at south
Jan 16, 2013 · Apt 3F
Closed — Violation closed
DOB building violations · 35
- Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2021
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed
Show 25 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 19, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p10436
Jul 14, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
3
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
Must file for removal of elev
Oct 13, 1988
Dob violation - resolved
ECB violations · 14
- Class - 1
Failure to maintain exterior bldg wall or appurtenances in that at front facade above 2nd flr, window stone lintel and approx 2' x 3' of brickwork has come loose & fell to sidewalk below. remedy: erect sidewalk
Nov 1, 2013 · Penalty $250
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35011001n issued on 2/13/13 pursuant to 28-204.4 & 1rcny 102-01. fls ceilings wall cracked due to
Jun 8, 2013 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner. noted - flrs, ceilings and walls cracked due to structural settlement - apt 3f. exterior masonry at 3rd, 2nd and 1st flrs vertically cracked @ rear extension
Feb 11, 2013 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances note: at time of inspection i observed horizontal & vertical cracks throughout apt #3f to include a vertical crack approx 1 inch wide @ rear of bldg running from
Jan 17, 2013
Resolve - Class - 2
Occupancy contrary to that allowed by c/o300850498. illegal occupancy noted:cellar level occupied as an office & kitchen water street restaurant. rem:discontinue illegal occupancy.
Jul 19, 2012 · Penalty $1,200
Resolve - Class - 1
Failure to provide unobstructed exit passageway at cellar & 1flr of restaurant /bar exit passageway obstructed by curtains at various locations & cellar level 2nd exit to rear obstructed by wood studs & buckets
Jul 19, 2012 · Penalty $800
Resolve - Class - 1
Failure to maintain building in code compliant manner. use of prohibited door &/or hardware per bc 1008.1.8;27-371(j) rear door leading ontofront street & serving as exit door having illegal hardware. rem:provi
Jul 19, 2012
Resolve - Class - 1
1008.1.2.2:failure to comply with direction of swing. noted:exit door from rear yard leading onto front street swing against direction of egress travel. rem:comply with code.
Jul 19, 2012 · Penalty $1,600
Resolve - Non-hazardous
Use of illegal hardware, note: at rear property of bldg gate to parking lot exists w/ a door opening in which you need a key to exit out to public sidewalk. locked door w/ key lock is directly adjacent to
Jul 24, 2006
Resolve - Non-hazardous
Use of llegal hardware. noted: at rear of bldg gate to parking lot exists w/ a swing door entrance/ exit way w/ lock for key on both sides. if someone wanted to exit parking area to sidewalk they would need a k
Jul 24, 2006 · Penalty $350
Resolve
Show 4 more ↓
- Hazardous
Use of illegal hardware. aouto locked gate at rear of premises opens only with akey *end parking lot approx so from building exit door. remedy: remove illegal hardware.
Apr 19, 2002 · Penalty $350
Resolve - Non-hazardous
21q03,73h01,35p07. 73-#-01- car runs erraticallt - adjust - starts and stops too fast 21-q-03- pi
Mar 15, 2000
Resolve - Non-hazardous
Operation of a public assemble at the 2 hd sty lunch rm. with accomo- dation for approx.140 persons with out a public assenbly permit. remedy: discontinue the unlawful use of premises as a public assembly.
Jan 2, 1992 · Penalty $55
Resolve - Non-hazardous
Operation of a public assembly at the 2nd sty meeting rm. with accomodation for approx 160 persons without a permit. remedy: discontinue the unlawful use untill a permit authorized
Jan 2, 1992 · Penalty $55
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 4, 2019 · Apt 2E
Close - Paint/plaster
Wall
Jul 10, 2013 · Apt 3F
Close - Plumbing
Water-leaks
Jul 8, 2013 · Apt 3F
Close - General
Mold
Jul 8, 2013 · Apt 3F
Close - General
Floor
Feb 25, 2013 · Apt 3F
Close - General
Floor
Feb 25, 2013 · Apt 3F
Close - Paint/plaster
Ceiling
Feb 25, 2013 · Apt 3F
Close - Paint/plaster
Wall
Feb 25, 2013 · Apt 3F
Close - General
Mold
Feb 25, 2013 · Apt 3F
Close - General
Ceramic-tile
Feb 25, 2013 · Apt 3F
Close
Show 13 more ↓
- General
Window guards
Feb 25, 2013 · Apt 3F
Close - Plumbing
Radiator
Feb 25, 2013 · Apt 3F
Close - Plumbing
Water-leaks
Jan 25, 2013 · Apt 3F
Close - Paint/plaster
Wall
Jan 25, 2013 · Apt 3F
Close - General
Floor
Jan 25, 2013 · Apt 3F
Close - General
Floor
Jan 9, 2013 · Apt 3F
Close - General
Floor
Jan 9, 2013 · Apt 3F
Close - Paint/plaster
Wall
Jan 9, 2013 · Apt 3F
Close - Paint/plaster
Wall
Jan 9, 2013 · Apt 3F
Close - General
Mold
Jan 9, 2013 · Apt 3F
Close - Heating
Heat related
Dec 18, 2012 · Apt 3F
Close - Heating
Heat related
Dec 15, 2012 · Apt 3F
Close - Heating
Heat related
Nov 18, 2012 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1850
- Floors
- 5
- Residential units
- 24
- Building area
- 59,273 ft²
- Lot area
- 10,404 ft²
- Zoning
- M1-2/R8A
- Community board
- 302
- Council district
- 33
- Block / lot
- 36 / 16
- Assessed value
- $5,692,950
- Landmark / historic district
- DUMBO Historic District
HPD registration #377683, last renewed Sep 3, 2025.
Questions about 66 Water Street
Who owns 66 Water Street?
The owner of record in NYC Department of City Planning PLUTO data is Dumbo Lofts Rental LLC.
Does 66 Water Street have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 66 Water Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 66 Water Street built?
City records list 1850 as the year it was built.
How many apartments are in 66 Water Street?
It has 24 residential units and 26 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.