50 Bridge Street
Brooklyn, NY 11201BBL 3-00031-7502Map
Owner of record: The Bridge No. 50 Condominum
50 Bridge Street is a condominium built in 1904 in Brooklyn, 11201. It has 58 residential units across 6 floors. The owner of record is The Bridge No. 50 Condominum. HPD has recorded 16 housing violations here, most recently on March 9, 2022. 2 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 43
- ECB violations
- 36
- HPD complaints
- 4
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - ANon-hazardous
Refit the building entrance door at public hall, 1st story
Jul 30, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2015
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8; wg to replace = 0; wg to repair = 0; located at apt 204, 2nd story, 2nd apartment from north at east
May 23, 2014 · Apt 204
Open — Nov certified late - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 206, 2nd story, 3rd apartment from west at north
May 9, 2014 · Apt 206
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , north wall in the 1st room from north at east located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed leak at north wall, (cause unknown). in the 1st room from north at east located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance to apt. in the foyer located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st door frame from east at south wall in the foyer located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation , in the bathroom located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed
Show 6 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from south at west wall in the 3rd kitchen from north at west located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall in the foyer located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall, 1st riser from north at east wall in the bathroom located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the 2nd room from north located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the 1st room from north at west located at apt 416, 4th story, 3rd apartment from west at north
Jun 27, 2006 · Apt 416
Closed — Violation closed
DOB building violations · 43
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2021
Dob violation - resolved - Construction other optional
Suspend all work immediately and make the site safe contact theborough commissioner's office at 718 802-3677
Jul 14, 2020
Dob violation - dismissed - Construction other optional
Borough comm. has ordered all work stopped under permit#321803287 on 7/13/2020 due to suspension of permit, intent to revoke , dob has been notified that the contractor leonal domingues#612048 has passed awayt on 3/15,2020 therefore until anew contractor suspend all work immed. & make site safe
Jul 14, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2019
Dob violation - resolved
Show 33 more ↓
- Construction other optional
C-construction other optional
Mar 6, 2019
Dob violation - active - Construction other optional
C-construction other optional
Sep 26, 2018
Dob violation - active - Construction other optional
Dot notice of encroachment/order dated 5/5/17 regarding a vault at the subject premises,you are hereby ordered pursuant to article 209 of title 28 of the nyc admin code to immed retain a nys lic prof eng' experienced w/masonry and/or concrete bldg structures to perform site survey&strl eval of vault,includ/not lmt'd to all msry demising walls
Jun 14, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 9, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 7, 2017
Dob violation - resolved - Landmark none
Landmk-landmark none
Jul 18, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Landmark none
Landmk-landmark none
Apr 23, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2015
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 6, 2015
Vpw*-violation unserved ecb-work without permit-dismissed - Construction other optional
C-construction other optional
Jan 6, 2015
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2008
Dob violation - resolved - Construction other optional
Stop all work immediately,make site safe,call dob at 718-802-3685 for information
Oct 23, 2007
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
May 27, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2005
Dob violation - resolved
ECB violations · 36
- Class - 1
Change of occupancy of cofo as per 28-118.3.1-28.118.3 .1 by operatinga place of assembly as per when current cofo does not allow such occupancy.atoi observed a dance/party like event taking place.on the second
Sep 18, 2025 · Penalty $5,000
Resolve - Class - 1
Atoi observed a dance/ party like event taking place (a no shoes event). observed approximately 75-100 persons in event. very loud music with speakers placed about the event space and nightclub like lighting in
Sep 18, 2025 · Penalty $2,500
Active - Class - 1
At time of my inspection observed an event in progress at which time i observed approximate 55 persons in attendance with layout seating capacity to accommodate approximately 100 persons. a ps/sound system was
Sep 11, 2025 · Penalty $2,500
Active - Class - 2
Occupancy contrary to that allowed by the dob records. dob records indicate co #301820910f dwellings, 1st flr as storage, accessory parking,mech space, lobby use. at time of inspection observed 1st flr on left
Feb 6, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic isnspection of aparking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024
Resolve - Class - 2
Failure to submit a required cycle 8c report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#814619. remedy: submit acceptable required technica
Feb 13, 2020 · Penalty $625
Resolve - Class - 1
Work w/o a permit. at time of inspection,observed demolition work in progress at apt#613. removed interior partitions between kitchen & bathromm. reference to dob records no demolition or construction permit on
May 7, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to institute and maintain safety equipment measured and temporary construction equipment.note: at the time of my inspection of a 30 sty building at the 7th floor level construction work in progress i
Feb 8, 2018 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. premises under alt-2 job #321287282 which renovation of apt#509 is active & in progress. non conforming work noted: observed the
Jul 25, 2016 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. failure to provide natural light where required. noted: observed at time of inspection at apt. unit #416 to occupied a room as kids bedroom w/o the enclose rm
May 1, 2015
Resolve
Show 26 more ↓
- Class - 2
Work w/o a permit. work noted: erected a steel structure deck. at 3rd fl level (unit #3) north/east. approx 10ft x 40ft x 10fth. deck is above the north east 1 story extention roof structure. remedy: obtain
Dec 28, 2013
Resolve - Class - 2
Work w/o permit. note: interior partition walls erected at 1st fl parking garage w/metal studs. metal studs erected approx 12ft in height & approx 20ft long by 12ft wide at front & approx 16'ft long by 10'ft w
Aug 19, 2013 · Penalty $830
Resolve - Class - 2
Design drawing required by the provision of chapter 33 of nyc buildingcode noted at 7-story bldg under alteration, pipe scaffold with stair tower with electric wire have been installed on top of sidewalk shed.
Oct 11, 2012
Resolve - Class - 2
Occupancy contrary to that allowed by the cert of occupancy or dob records.note:cert of occupancy w/ #:301820910f effective 2/11/10 indicate 1st flr to be storage,mechanical space,lobby & parking lot.now portio
Apr 20, 2011 · Penalty $6,000
Active - Class - 2
Work w/o permit.work noted:new interior sheetrock partition walls erected & plumbing & electrical lines installed to create office w/ 2pc bathroom,multiple work stations & kitchenette application 32029719 is no
Apr 20, 2011 · Penalty $2,000
Resolve - Class - 1
Supervision or use of rigging equipment w/o a rigger's license. noted: no license rigger on site. expired rigger's license 6/30/09. remedy: re-new license.
Jul 2, 2009
Resolve - Class - 1
Failure to maintain building in code compliant manner! exterior drain leader improperly terminated above, 5th sty, parapet @ roof set-back, for 6th sty, without downsprout for connection to sewer or storm drain
Oct 9, 2008 · Penalty $1,000
Resolve - Non-hazardous
31h11.60t07.38x10.02b10.52o02.72k09. 31h worn car shoes 60t provide current co info 38x car top light 02b muted bell 53o clean for proper inspection 72k tension sheave
Jun 27, 2008
Resolve - Hazardous
Failure to post permit for work at premises.or no permit post on premises for job site fence and alteration as per code.remedy:post permit for work at premises.
Nov 9, 2007 · Penalty $130
Resolve - Non-hazardous
Failure to provide adequate protection for sidewalks & walkways duringconstruction operations.noted:construction activities in progress w/the removal of portions of concrete exterior bldg wall 1st fl concrete
Oct 23, 2007 · Penalty $2,000
Resolve - Non-hazardous
83xx.83xx-restore elevator to service.
Oct 4, 2007
Resolve - Non-hazardous
83x10/.83-repair & restore elevator to service so that a full inspection can be made by this dept.
Sep 20, 2007 · Penalty $180
Resolve - Non-hazardous
Failure to provide fire stopping where required.defects noted:18 vehicles are being stored in 1st fl garage w/cellar below.garage fl is constructed of heavy timber wood joist approx 8" o/c wood subfloor & 1 lay
May 4, 2007
Resolve - Hazardous
Operation of a crane/derrick w/o a certificate of approval. (expired cd) supervision or use of rigging equipment w/o a master riggers license. remedy:
Mar 21, 2006 · Penalty $2,000
Resolve - Hazardous
Directing use of hoisting machine w/o a hoisting machine operators license. remedy:
Mar 21, 2006 · Penalty $500
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection.noted:no approved structural plans for decks/terraces.remedy:stop all work provide plans.
Jun 17, 2005 · Penalty $250
Resolve - Non-hazardous
Illegal occupancy:occupancy contrary to that moved by dept. of bldg. records:occupancy change from a factory to resolved at second fl. front center.remedy:obtain valid c of o or discontinue the illegal use.
Apr 3, 2000 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit removal of partition walls from 2nd through 6th floors. walls were interior partitions made of 2x4" woodstuds and 2 5/8" & 4" metal studs & tracks. a search of department records show
Mar 4, 1997 · Penalty $1,000
Resolve - Non-hazardous
Work without permit: installing 1.25 "+1" pipes for new gas lines frombasement to 2nd fl. (9 defferent lines). also removal of plumbing fixtures and supply lines at 2nd 3rd 4th 3 6th fl. fixtures removed were
Mar 4, 1997 · Penalty $1,000
Resolve - Hazardous
Failure to provide containers for the storage of combustible debris on the 2nd 3rd 4th and 6th floors. approx 190 cubic yards of combustible debris on the floors.
Mar 4, 1997 · Penalty $1,000
Resolve - Non-hazardous
Failure to provide contractors sign facing public thoroughfare's whilealteration work is in progress remedy: provide contractor's sign as required
Mar 4, 1997 · Penalty $1,000
Resolve - Hazardous
Failure to properly store combustible material properly consisting o 2x4 and other lumber debris. noted approx 30 cubic yards on 2nd fl. 30 cubic yards on 3rd floor. 100 cubic yards on 4th fl and 30 cubic
Mar 4, 1997 · Penalty $1,000
Resolve - Non-hazardous
Plumbing work without a permit new gas lines being indall left side of building & new riser to alone floors. remedy: obtain a permit if feasible or restore to prior legal condition.
Feb 14, 1997 · Penalty $1,000
Resolve - Non-hazardous
Failure to comply with the commissioner's order to file a certificate of correction with the department of building for violation #34094115l. remedy: file certificate of correction for violation #34094115l.
Oct 20, 1995 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain (1)aproximately 3 sq. ft plaster ceiling missing at 6th fl (2) water damage stain in kitchen living and bed room possible roof leak. (3) drain pipe leaking near ceiling said 6th fl be
Jan 25, 1994 · Penalty $1,000
Resolve - Hazardous
Failure to maintain horizontal exit doors with fusible links missing or remian in the open position on all floors within or by the public hallway remedy maintain all fusible link doors
Jul 20, 1993 · Penalty $1,000
Resolve
Complaints
- Plumbing
Water-leaks
Jun 23, 2006 · Apt 416
Close - General
Floor
Jun 23, 2006 · Apt 416
Close - Plumbing
Water-leaks
Jun 13, 2006 · Apt 403
Close - Plumbing
Water-leaks
Jun 13, 2006 · Apt 403
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RZ)
- Year built
- 1904
- Floors
- 6
- Residential units
- 58
- Building area
- 171,382 ft²
- Lot area
- 41,238 ft²
- Zoning
- M1-4/R7A
- Community board
- 302
- Council district
- 33
- Block / lot
- 31 / 7502
- Assessed value
- $11,877,378
- Landmark / historic district
- DUMBO Historic District
HPD registration #379500, last renewed Sep 5, 2025.
Questions about 50 Bridge Street
Who owns 50 Bridge Street?
The owner of record in NYC Department of City Planning PLUTO data is The Bridge No. 50 Condominum.
Does 50 Bridge Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 50 Bridge Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 50 Bridge Street built?
City records list 1904 as the year it was built.
How many apartments are in 50 Bridge Street?
It has 58 residential units and 62 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.