roofy

3260 Henry Hudson Pkwy E

Bronx, NY 10463BBL 2-05789-0033Map

Owner of record: Ppref/Fp 3260 Henry Hudson Owner LLC

3260 Henry Hudson Pkwy E is an elevator apartment building built in 2006 in Bronx, 10463. It has 127 residential units across 9 floors. The owner of record is Ppref/Fp 3260 Henry Hudson Owner LLC. HPD has recorded 44 housing violations here, most recently on May 17, 2025.

HPD violations
44
DOB violations
64
ECB violations
35
HPD complaints
35

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 17, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 44

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    May 17, 2025 · Apt 2F

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 2f, 2nd story, 1st apartment from north at east

    May 17, 2025 · Apt 2F

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Feb 27, 2025 · Apt 2F

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Feb 27, 2025 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at washbasin in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Sep 18, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Sep 18, 2024 · Apt 2F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from north at east

    Sep 18, 2024 · Apt 2F

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 2f, 2nd story, 1st apartment from north at east

    Sep 18, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Sep 18, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 8c, 8th story, 1st apartment from west at north , section ''north''

    Aug 2, 2024 · Apt 8C

    Closed — Violation closed
Show 34 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 8c, 8th story, 1st apartment from west at north , section ''north''

    Aug 2, 2024 · Apt 8C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 8c, 8th story, 1st apartment from west at north , section ''north''

    Aug 2, 2024 · Apt 8C

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electrical outlet at west wall in the kitchen located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the foyer located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective metal hand rail leading to garage (building rear) at west

    Jun 26, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective concerete under hand rail leading to garage( building rear) at west

    Jun 26, 2024

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective electrical outlet at west and east wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly secure the loose bath tub handle knobs in the bathroom located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective faucet at sink base cabinet in the kitchen located at apt 2f, 3rd story, 1st apartment from north at east

    Jun 26, 2024 · Apt 2F

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 2nd story

    Jun 26, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective metal handrail leading to garage (building rear)

    Jun 26, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective concrete under handrail leading to garage(building rear)

    Jun 26, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electric outlet at west wall in the kitchenette located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 11, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective convector (hvac) unit at east wall in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 11, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electric outlet at west wall in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 11, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective convector (hvac) unit at east wall in the 2nd room from north at east located at apt 2f, 2nd story, 1st apartment from north at east

    Jun 11, 2024 · Apt 2F

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (frame missing) at public hall, 2nd story

    Jun 11, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 2nd story

    Jun 11, 2024

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system (notice missing) at public hall, 2nd story

    Jun 11, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 9, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 4, 2015

    Closed — Violation dismissed

DOB building violations · 64

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 8, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 24, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 16, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 9, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 6, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 6, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 9, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 9, 2008

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2006

    Vw*-violation - work w/o permit dismissed

ECB violations · 35

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#x0006055 by the august 1,2024 deadline.to date,the department has

    Oct 1, 2024

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#914158.remedy:submit acceptable require

    Dec 9, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facades/walls&appurtenances.note:atoi observed@roof level:vert/hairline cracks&peeling stucco coating@parapet wall@multiple locations.maintain exterior bldg facades&appurtenanc

    Apr 16, 2021 · Penalty $1,280

    Resolve
  • Class - 2

    Failure to comply w/i commissioner's order to file c/c w/dob.note:atoirespondent didn't comply w/previous ecb35542288m issued12/1/20&didnt file c/c as doi4/16/21.no work done.file c/c&comply w/code as per1rcny1

    Apr 16, 2021 · Penalty $1,280

    Resolve
  • Class - 1

    Failure to repair swarmp conditions in a timely manner. note:on 12/1/2020 there was no evidence that "peeling stucco at parapet wall,deteriorated mortar joint and caulking between coping stones,vertical crack a

    Dec 1, 2020

    Resolve
  • Class - 1

    Failure to repair swarmp conditions in a timely manner. note:on 12/1/2020 there was no evidence that,"peeling stucco at parapet wall,deteriorated mortar joint and chaulking between coping stones,vertical crack

    Dec 1, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation#39004435k issued on 6/21/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi

    Aug 3, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation#39004438x issued on 6/21/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi

    Aug 3, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation#39004437y issued on 6/21/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi

    Aug 3, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation#39004436m issued on 6/21/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi

    Aug 3, 2020 · Penalty $1,250

    Resolve
Show 25 more ↓
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation#39004439h issued on 6/21/2019,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifi

    Aug 3, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Correct all violating conditions, register boiler and call for an inspection.

    Jun 21, 2019

    Resolve
  • Class - 2

    Spill switch not installed on boilers 04 & 05-"u" rated expansion tanks w/o pressure relief valves-steel tank used on potable water system ; correct all violating conditions, register boiler and call for an ins

    Jun 21, 2019

    Resolve
  • Class - 2

    Correct all violating conditions, register boiler and call for an inspection.

    Jun 21, 2019

    Resolve
  • Class - 2

    Correct all violating conditions, register boiler and call for an inspection.

    Jun 21, 2019

    Resolve
  • Class - 2

    Correct all violating conditions, register boiler and call for an inspection.

    Jun 21, 2019

    Resolve
  • Class - 1

    Safety relief is over sized ý125 psi¨ rating plate show 100 psi. remedy: need to install right safety ý 100 psi¨ as per rating plate

    Apr 8, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Safety relief valve is over sizeý125 psi¨ slint fin model#gght-2800e. cease use boiler at site, maintain boiler; need to change safety relief valve to be 100 psi as per rating plate callý212¨ 393-2784 to lift c

    Apr 8, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Safety relief valve is over sized ý125 psi¨ . slant fin caravan model # gght-2800e cease use boiler at site., maintain boiler; need to change safety relief valve to be ý100 psi¨ as per rating plate. call ý212¨3

    Apr 8, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to conduct/file final inspection for completed within one yearof permit expiration. alt ii job #220206541 which permit expired 01-0116 is completed and substantially conform to approved plan.applicant

    Dec 27, 2017 · Penalty $800

    Resolve
  • Hazardous

    Sec:27-1021(g)(3)-safety netting damaged &/or broken.at time of inspection the safety netting along the south elevation at fls 9,7 & 6 have been pulled back to have the sill of the new windows installed.noted:

    Jul 30, 2007 · Penalty $400

    Resolve
  • Hazardous

    No permit for storing flammable equipment.at time of inspection oxygen& acetyline tanks are stored at top of roof slab against a parapet wall facing east.no permit is provided for storage & use.remedy:remove ta

    Jul 23, 2007 · Penalty $800

    Resolve
  • Hazardous

    Cease use.6i10.6-gate switch not working-cease use until item is repaired.call 212-566-5544.

    Apr 17, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work w/o a permit.expired permit fence permit#201036565 expired april 1,2007.remedy:renew permit

    Apr 15, 2007

    Resolve
  • Non-hazardous

    Failure to provide contractor's sign for sidewalk shed.upon insp shed erected along henry hudson parkway and along w 235 st. no contractors sign posted.remedy:post a sidewalk shed contractors sign w/ full name

    Mar 24, 2007

    Resolve
  • Non-hazardous

    Work wihtout a permit-work noted soil retention system to include steel wire mesh #4,soil nails patter 5'x5' shotcrete wall thickness 4"soil nails to depth cut plus 5'-0'.

    Aug 2, 2006 · Penalty $500

    Resolve
  • Hazardous

    Failure to post contractor's sign. remedy: provide contractor's sign

    Mar 22, 2006

    Resolve
  • Hazardous

    Failure to provide approved plans at premises at time of insp. remedy: stop all work. provide plans. make site safe, call dob for an insp. before going back to work.

    Mar 22, 2006

    Resolve
  • Hazardous

    Failure to provide protection at sides of excavation- no sheeting, shoring bracing or 45 degree angle. remedy: stop all work immediately except to provide protection or 45 degree angle all around do not start

    Mar 22, 2006 · Penalty $1,000

    Resolve
  • Non-hazardous

    36 50 50 pipe down relief valve discharge to a safe point

    Dec 10, 2003

    Resolve
  • Non-hazardous

    36

    Dec 10, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    50 32a 50 brickwork around fire box door is missing repair or replace 32a exposed wiring or low water cut off

    Dec 10, 2003

    Resolve
  • Non-hazardous

    50 50 brickwork around fire box door is missing repair or replace

    Dec 10, 2003

    Resolve
  • Non-hazardous

    22q6,50y14,50o2,46h12,48h12. -46,48 both hoist cables and ctw cables show medium dirt and crown wear

    Apr 21, 1999

    Resolve
  • Non-hazardous

    50o2,50y14,46a15. -46 shorten hoist cables

    Apr 21, 1999

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Aug 17, 2025 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    May 14, 2025 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    May 14, 2025 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Apr 23, 2025 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Apr 23, 2025 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2024 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Sep 12, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Sep 12, 2024 · Apt 2F

    Close
  • Safety

    Sprinkler

    Aug 28, 2024 · Apt OUTSID

    Close
Show 25 more ↓
  • Electric

    Outlet/switch

    Aug 26, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jul 30, 2024 · Apt 8C

    Close
  • Water leak

    Slow leak

    Jul 30, 2024 · Apt 8C

    Close
  • Heat/hot water

    Apartment only

    Jul 29, 2024 · Apt 2F

    Close
  • Door/window

    Door

    Jul 9, 2024 · Apt 2F

    Close
  • Door/window

    Door

    Jul 9, 2024 · Apt 2F

    Close
  • Flooring/stairs

    Stairs

    Jul 9, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jun 23, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jun 23, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Jun 23, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jun 23, 2024 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Jun 23, 2024 · Apt 2F

    Close
  • Door/window

    Door frame

    Jun 23, 2024 · Apt MAINEN

    Close
  • Plumbing

    Basin/sink

    Jun 23, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Jun 23, 2024 · Apt 2F

    Close
  • Outside building

    Porch/balcony

    Jun 23, 2024 · Apt OUTSID

    Close
  • Flooring/stairs

    Stairs

    Jun 10, 2024 · Apt 2F

    Close
  • Plumbing

    Radiator

    Jun 10, 2024 · Apt 2F

    Close
  • Electric

    Outlet/switch

    Jun 10, 2024 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jul 14, 2022 · Apt 4O

    Close
  • Unsanitary condition

    Mold

    Jul 14, 2022 · Apt 4O

    Close
  • Heat/hot water

    Entire building

    Jul 11, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2015 · Apt 4THFL

    Close

Sales history

DatePriceTypeUnits
Apr 21, 2026$64,000,000Rentals - elevator apartments127

Building details

Building type
Elevator apartment building (D1)
Year built
2006
Floors
9
Residential units
127
Building area
242,697 ft²
Lot area
44,350 ft²
Zoning
R7A
Community board
208
Council district
11
Block / lot
5789 / 33
Assessed value
$10,657,350
Landmark / historic district
No

HPD registration #225996, last renewed Jul 20, 2026.

Questions about 3260 Henry Hudson Pkwy E

Who owns 3260 Henry Hudson Pkwy E?

The owner of record in NYC Department of City Planning PLUTO data is Ppref/Fp 3260 Henry Hudson Owner LLC.

Does 3260 Henry Hudson Pkwy E have violations?

Yes. NYC HPD has recorded 44 housing violations at this property.

Is 3260 Henry Hudson Pkwy E rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3260 Henry Hudson Pkwy E built?

City records list 2006 as the year it was built.

How many apartments are in 3260 Henry Hudson Pkwy E?

It has 127 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.