roofy

190 Fordham Street

Bronx, NY 10464BBL 2-05643-7501Map

Owner of record: Unavailable Owner

190 Fordham Street is a condominium built in 1898 in Bronx, 10464. It has 16 residential units. The owner of record is Unavailable Owner. HPD has recorded 68 housing violations here, most recently on August 23, 2024. 27 of the 50 most recent violations are still open.

HPD violations
68
DOB violations
28
ECB violations
32
HPD complaints
62

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 23, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 68

  • B

    Properly repair the source and abate the evidence of a water leak at north wall at public hall, 1st story

    Aug 23, 2024

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective building entrance wooden door and window frames rotting at vestibule at public hall, 1st story

    Aug 23, 2024

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at north east and west wall at lobby, 1st story

    Aug 23, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • A

    File with this department a registration statement for building.

    Oct 28, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Oct 28, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Oct 28, 2023

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing

    Oct 28, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at street to vestibule

    Oct 28, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north and south wall at public hall, 1st story

    Oct 3, 2023

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective fire retardent material at north and south wall at public hall, 1st story

    Oct 3, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Sep 8, 2023

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Sep 8, 2023

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing

    Sep 8, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 8, 2023

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing permanent kick stand door stop at building entrance door (street to vestibule)

    Sep 8, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective building entrance door (street to vestibule)

    Sep 8, 2023

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and walls in the 1st room from east located at apt 3, 1st story, 1st apartment from north at east

    Jul 13, 2023 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3, 1st story, 1st apartment from north at east

    Jul 13, 2023 · Apt 3

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 1st story, 1st apartment from north at east

    Jul 13, 2023 · Apt 3

    Open — Violation will be reinspected
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3, 1st story, 1st apartment from north at east

    Jul 13, 2023 · Apt 3

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 3rd story

    Sep 12, 2022

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling, east and west walls at public hall, 1st story

    Sep 12, 2022

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east and west walls at public hall, 1st story

    Sep 12, 2022

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective the fire retardant ceiling, east and west walls at public hall, 1st story

    Sep 12, 2022

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiiling and north wall at public hall, 1st story

    Jul 26, 2022

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at cieling and northwall at public hall, 1st story

    Jul 26, 2022

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling approx 1 sq ft in the 2nd room from east located at apt 3, 1st story, 1st apartment from north at east original violation 15132619 issued 03-may-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 3, 2022 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3, 1st story, 1st apartment from north at east

    May 3, 2022 · Apt 3

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 3, 1st story, 1st apartment from north at east

    May 3, 2022 · Apt 3

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling approx 1 sq ft in the 2nd room from east located at apt 3, 1st story, 1st apartment from north at east

    May 3, 2022 · Apt 3

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall at lobby, 1st story

    Feb 11, 2022

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective fire retardaretardant ceiling and nnorth wall at lobby, 1st story

    Feb 11, 2022

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, nnorth and south walls at lobby, 1st story

    Feb 11, 2022

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceilingand all walls at public hall, 1st story

    Jun 29, 2021

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... aprox. 4 sq. ft. at east wall aprox. 15 sq. ft. at west wall aprox. 8 sq. ft. at south wall at public hall, 1st story original violation 14417335 issued 29-jun-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 29, 2021

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles at entrance door at public hall, 1st story

    Jun 29, 2021

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective fire retardant material at the ceiling and all walls at public hall, 1st story

    Jun 29, 2021

    Open — Invalid certification
  • A

    Trace and repair the source and abate the visible mold condition... aprox. 4 sq. ft. at east wall aprox. 15 sq. ft. at west wall aprox. 8 sq. ft. at south wall at public hall, 1st story

    Jun 29, 2021

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective the ceiling and south wall at public hall, 1st story

    Jun 29, 2021

    Open — Invalid certification
  • B

    Properly repair the source and abate the evidence of a water leak on ceiling from extention roof at public hall, 1st story

    Jun 29, 2021

    Open — Invalid certification
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and south wall at lobby, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak from the ceiling at lobby, 1st story

    Sep 11, 2019

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retarding ceiling at lobby, 1st story

    Sep 24, 2018

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at lobby, 1st story

    Sep 24, 2018

    Open — Nov sent out

DOB building violations · 28

  • Construction other optional

    At the east wall above apt #3, there is peeling and cleaving of brick and stucco with the danger of being displaced to the rear yard of apt #3. noted in nov #39134804m.

    Jan 7, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 22, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2017

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
Show 18 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 18, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 5, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2008

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jul 14, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 5, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 23, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    2p5590

    Jan 8, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed

ECB violations · 32

  • Class - 2

    Found on a.o smith hot water heater for apt #3 in the boiler room . there is flex hoses for gas hook up for hot water heater . use right material and fix all violating condition ., maintain boiler

    Jan 9, 2025

    Resolve
  • Class - 1

    Failure to maintain building code complaint. noted: above apt #3 there is deteriorated mortar joints and peeling stucco coating at exposure 2 (left side, east wall) of structure with numorous areas of cleaving

    Jan 7, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    Summons issued for failure to maintain due to deteriorated mortar joints and peeling stucco at exposure 2 of structure., repair and/or replace

    Aug 7, 2024 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain building: the stucco at all exposures is peeling,bulging and dislodged with brick fragments attached in various locations at time of inspection, repair and/replace

    Mar 17, 2024

    Resolve
  • Class - 2

    At time of inspection observed spalling bricks surface, pop-up exterior facade paint, disrepair mortar joint on exterior wall throughout. also observed evidence of water marks / stain on lobby wall & ceiling.,

    Apr 29, 2022 · Penalty $625

    Active
  • Class - 2

    As per b254 failure to maintain. found one boiler model #4128 burnham rated at 385000btus to have these violating conditions. 32)exposed wiring, 50)missing spill switch at draft hood, 16)no posted boiler number

    Oct 24, 2018 · Penalty $625

    Active
  • Class - 2

    As per class (b254) found a boiler burnham model #203 rated at 62000btqs to have these violating conditions. 50)missing spill switch at draft hood. 5a)backflow to have drop leg-relief valve also to have drop le

    Oct 24, 2018 · Penalty $625

    Active
  • Class - 2

    50,5a)as per(b254) failure to maintain. found burnham boiler model #p2x3 rated at 62000btus. 50)no spill switch on draft hood. 5a)backflow missing drop leg, also relief valve missing drop leg. correct all viola

    Oct 24, 2018 · Penalty $313

    Active
  • Class - 1

    51-class 1 (b154) failure to maintain found hot water heater model a/osmith 40000 btus fvc40 to be leaking and very dangerous. cease use o f appliance. rmdy: must repalce and submit certificate of correction.

    Oct 24, 2018 · Penalty $1,250

    Active
  • Class - 2

    16,5a,32a,50-as per (b254) failure to maintain. found one boiler burnham model pwb60 rated at 17500. 50)missing spill switch at boiler hood, boiler cannot be supported by hollow bricks, 16)no posted boiler numb

    Oct 24, 2018 · Penalty $625

    Active
Show 22 more ↓
  • Class - 2

    50,5a-as per(b254)found a us boiler model x. to have these violating conditions. 50)no spill on draft hood. no drop leg on backflow preventer and relief valve. correct all violating conditons and submit certifi

    Oct 24, 2018 · Penalty $625

    Active
  • Class - 2

    5a,16,50-as per (b254) failure to maintain. found one boiler burnham model #p203 wni rated at 62000btus to have these violating conditions. 50)missing spill switch at draft hood, 5a)drop leg on relief missing d

    Oct 24, 2018 · Penalty $313

    Resolve
  • Class - 2

    50,5a)as per(b254) failure to maintain. found a burnham boiler #p203 rated at 62000 btus to have these violating conditions. 50)spill switch missing on draft hood, 5a)backflow missing dropleg, as well as, relie

    Oct 24, 2018 · Penalty $313

    Resolve
  • Class - 2

    50,5a-as per (b254) found a burnham boiler model #203 rated at 62000btus to have these violating conditions. 50)no spill switch on draft hood. 5a)no drop leg on backflow, no drop leg on relief valve. correct al

    Oct 24, 2018 · Penalty $3,125

    Active
  • Class - 2

    50,5a)as per (b254) found a burnham boiler model #203 rated at 62000btus. 50)no spill switch on draft hood. 5a)no drop leg on backflo preventer and no drop leg on relief. correct all violating conditions and su

    Oct 24, 2018 · Penalty $313

    Resolve
  • Class - 2

    50,5a)as per(b254)found a burnham boiler model #p203 rated at 62000 btus to have these violating conditions. 50)missing spill switch on draft hood. 5a)missing dropleg on backflow, missing drop leg on relief val

    Oct 24, 2018 · Penalty $625

    Active
  • Class - 1

    Cu5a10,67x10. 5a10-door zone restrictors not working both doors takenapart. this is a safety device to ensure elevator passenger safety. 67x10-outside communication needs to be reprogrammed.

    Jul 1, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:@part of the bldg roof guardrail rusted broken (metal) & shaky pvc guardrail the roof top have rotten wooden plate form w/no adequate safety railing.rem:r

    May 24, 2018 · Penalty $1,250

    Active
  • Class - 1

    Removed or defaced a written posted vacate order: noted: at the time of inspection vacate sticker was observed to have been removed. as per complaint #2257980 vacate was issued on 2-25-16 by badge#1871 for defe

    Feb 27, 2018

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35168584j issued on 02/24/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. note: no document file for failure to maintain bldg in code

    Jun 13, 2016

    Resolve
  • Class - 1

    Failure to maintain bldg in a code complaint manner. noted: at east elevation-approx 15'x5'x 3/4" section of masonry stucco dislodged & damaged fence. remedy: make safe immediately repair & maintain.

    Feb 24, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    Work w/o permit.noted:unit apt.#8 has removed interior partitions that separated living room from one of two bedrooms to inpose size of living room w/o obtaining dob permit and sign-off.rem:obtain required perm

    Jun 3, 2015

    Resolve
  • Non-hazardous

    4a,19b,36.burnham gas boiler 385,000 btu's installed without a work permit.

    May 9, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    4a,19b,36.burnham gas boiler 175,000 btu,s installed without a work permit.

    May 9, 2001 · Penalty $1,300

    Resolve
  • Hazardous

    4a-19b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4a-19b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4-a 19-b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4-a 19-b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4-a 19-b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4-a 19-b

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4a,19b.

    May 9, 2001 · Penalty $400

    Resolve
  • Hazardous

    4a,19b.

    May 9, 2001 · Penalty $400

    Resolve

Complaints

  • Water leak

    Slow leak

    Jan 7, 2025 · Apt 3

    Close
  • Water leak

    Heavy flow

    Dec 27, 2024 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2024 · Apt UNIT1

    Close
  • Unsanitary condition

    Mold

    Dec 21, 2024 · Apt UNIT1

    Close
  • Paint/plaster

    Wall

    Dec 21, 2024 · Apt UNIT1

    Close
  • Plumbing

    Bathtub/shower

    Dec 21, 2024 · Apt UNIT1

    Close
  • Electric

    Wiring

    Dec 21, 2024 · Apt UNIT1

    Close
  • Water leak

    Slow leak

    Dec 13, 2024 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Aug 7, 2024 · Apt 3

    Close
  • Water leak

    Heavy flow

    Jun 15, 2024 · Apt LOBBY

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Jun 15, 2024 · Apt LOBBY

    Close
  • Water leak

    Heavy flow

    Sep 29, 2023 · Apt 3

    Close
  • Water leak

    Damp spot

    May 1, 2023 · Apt 3

    Close
  • Safety

    Fire escape

    Apr 19, 2023 · Apt BLDG

    Close
  • General

    Signage missing

    Apr 19, 2023 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Aug 29, 2022 · Apt 3

    Close
  • Water leak

    Slow leak

    Aug 29, 2022 · Apt 3

    Close
  • Paint/plaster

    Wall

    Aug 29, 2022 · Apt 3

    Close
  • Outside building

    Pavement

    Aug 29, 2022 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Aug 29, 2022 · Apt 3

    Close
  • Water leak

    Slow leak

    Jun 28, 2022 · Apt 3

    Close
  • Unsanitary condition

    Sewage

    Jun 2, 2022 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Apr 28, 2022 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Apr 28, 2022 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jan 4, 2022 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Jan 4, 2022 · Apt 3

    Close
  • Water leak

    Damp spot

    Dec 9, 2021 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Dec 9, 2021 · Apt 3

    Close
  • Water leak

    Heavy flow

    Nov 11, 2021 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jul 7, 2021 · Apt 3

    Close
  • Paint/plaster

    Wall

    Jun 27, 2021 · Apt LOBBY

    Close
  • Paint/plaster

    Ceiling

    Jun 27, 2021 · Apt LOBBY

    Close
  • Plumbing

    Boiler

    Sep 10, 2019 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Sep 10, 2019 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Sep 8, 2019 · Apt UNIT3

    Close
  • Plumbing

    Water supply

    May 1, 2019 · Apt 3

    Close
  • Plumbing

    Steam pipe/riser

    Jan 6, 2019 · Apt 3

    Close
  • Plumbing

    Boiler

    Jan 6, 2019 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Nov 27, 2018 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Nov 27, 2018 · Apt 3

    Close
  • Water leak

    Slow leak

    Oct 23, 2018 · Apt 3

    Close
  • Paint/plaster

    Wall

    Sep 20, 2018 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Sep 20, 2018 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Sep 20, 2018 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Apr 28, 2016 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Apr 28, 2016 · Apt 3

    Close
  • General

    Mold

    Dec 14, 2011 · Apt 3

    Close
  • General

    Mold

    Dec 14, 2011 · Apt 3

    Close
  • General

    Mold

    Dec 5, 2011 · Apt 3

    Close
  • General

    Mold

    Dec 5, 2011 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1898
Floors
—
Residential units
16
Building area
27,649 ft²
Lot area
43,872 ft²
Zoning
R3A
Community board
210
Council district
13
Block / lot
5643 / 7501
Assessed value
$1,240,198
Landmark / historic district
INDIVIDUAL LANDMARK

HPD registration #222811, last renewed Jul 24, 2025.

Questions about 190 Fordham Street

Who owns 190 Fordham Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 190 Fordham Street have violations?

Yes. NYC HPD has recorded 68 housing violations at this property.

Is 190 Fordham Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 190 Fordham Street built?

City records list 1898 as the year it was built.

How many apartments are in 190 Fordham Street?

It has 16 residential units and 18 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.