183 City Island Avenue
Bronx, NY 10464BBL 2-05626-0288Map
Owner of record: 181-187 City Island LLC
183 City Island Avenue is a walk-up apartment building built in 1925 in Bronx, 10464. It has 6 residential units across 3 floors. The owner of record is 181-187 City Island LLC. HPD has recorded 234 housing violations here, most recently on March 1, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 234
- DOB violations
- 2
- ECB violations
- 19
- HPD complaints
- 179
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 234
- BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rotted wood parquet tiles around radiator in the 3rd room from north located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective sinking wood sub floor under refridgerator in the kitchen located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at upper window sash at 2nd window from north at east wall in the 3rd room from north located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 1f, 2nd story, 1st apartment from east at south
Mar 1, 2026 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Mar 1, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at building entrance door at public hall, 1st story
Mar 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door from vestibule to 1st sty at public hall, 1st story
Mar 1, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective lifting ceramic tile causing trip hazard infront of steps at public hall, 1st story
Mar 1, 2026
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective air valve at radiator in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2f, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at east wall at vestibule at public hall, 1st story
Nov 16, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at vestibule at public hall, 1st story
Nov 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing metal wedge at building entrance door, from street to vesibule,
Oct 17, 2024
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder secure with appropriate nuts and bolts , 2nd fire escape from north at east, at building rear
Oct 17, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plant twines intertwined thru-out affecting safe egress at 1st story balcony. , 2nd fire escape from north at east, at west exterior wall ( building rear )
Oct 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.
Oct 17, 2024
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the at public halls at all storys,
Oct 17, 2024
Closed — Violation dismissed - BHazardous
Properly secure the loose handle rail at the south wall at 1st story public hall
Oct 17, 2024
Closed — Violation dismissed - BHazardous
Provide approved type wired mesh under skylight at bulkhead
Oct 17, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic tile at vesituble , (trip hazzard)
Oct 17, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective broken cracked ceramic tile at 2nd story public hall near staircase, (trip hazzard)
Oct 17, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Oct 8, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch-set at vestibule door , 1st story
Aug 1, 2024
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall, west wall, and north wall. in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 22, 2024 · Apt 2F
Open — Not complied with - CImmediately hazardous
Provide approved one-hour fire resistance rated self-closing door with key-operated dead bolt & latch set peephole & chain guard at main entrance ... in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north, and south walls in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the missing light fixture cover at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 17, 2024 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vestibule door (vestibule to 1st sty public hall)
Sep 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 8th marble tread from bottom up at 3rd sty intermediate landing leading to bulkhead
Sep 8, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st room from east at north, the private hallway , the kitchen located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, east wall, 1st window frame from south at west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Open — Invalid certification - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from east at south
Aug 24, 2022 · Apt 2F
Closed — Violation dismissed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
A sidewalk shed about 30 ft long recommended at exp. #1 to protect the pedestrians walking by
Jan 9, 2020
Dob violation - dismissed
ECB violations · 19
- Class - 2
At the time of inspection, i observed a sidewalk shed erected around a 3-story occupied building. review of dob now and bis records indicates sidewalk shed permit #x01184198-i1-sh expired on 05/06/2026 and has
May 22, 2026 · Penalty $1,250
Active - Class - 2
At the time of inspection of a 3-story building, i observed sidewalk shed in place, during my inspection i noticed sidewalk shed has no building information panel. this create a hazardous situation for first re
May 22, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection of a 3-story building, i observed sidewalk shed erected exp#1-2. during my inspection i noticed sidewalk shed has no contact information panel. this create a hazardous situation for first
Apr 16, 2026 · Penalty $1,280
Resolve - Class - 2
At the time of inspection, i observed sidewalk shed erected around a building not maintain as per code 3307.6.4.10 unsafe condition observed cross bracing not properly connected and rotter mudsills various loca
Apr 16, 2026 · Penalty $2,430
Resolve - Class - 2
At time of inspection of a 3-story occupied building observed no sign of construction activities sidewalk shed erected exp#1-2 upon reviewing dob now and bis system show permit expired since 06/09/2023 and has
Feb 13, 2025 · Penalty $3,125
Resolve - Class - 2
At time of inspection of a 3-story occupied building observed no sign of construction activities sidewalk shed erected exp#1-2 during my inspection i noticed sidewalk shed has missing information panel.this cre
Feb 13, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection i observed 3 story occupied building sidewalk shed in place exposure #1.i notice recurring condition several area with bolts has missing caps, mudsills are no secure or has been maintain a
Nov 8, 2024 · Penalty $6,000
Resolve - Class - 2
At time of my inspection of a recurring condition of a sidewalk shed at a occupied 3 story building. permit are expired since 2023 and none was updated for the duration of time that temporary equipment is onsi
Oct 1, 2024 · Penalty $3,125
Resolve - Class - 2
At time of my inspection of a sidewalk shed at a occupied 3 story building.i noticed that condition remains the same permit has been expired since 2023 for temporary equipment that's onsite.as per code temporar
Jul 25, 2024 · Penalty $1,250
Resolve - Class - 2
At a 4 story occupied building with a sidewalk shed. upon reviewing department of building records recurring condition reminds of expired permit since 11/15/2023 violation 39523405y complaint 2380243.permit sh
May 17, 2024 · Penalty $3,125
Resolve
Show 9 more ↓
- Class - 2
Summons issued for failure to maintain due to bathroom ceiling in apartment 2f has water damage and holes., repair and/or replace
Feb 18, 2024
Resolve - Class - 2
At time of inspection i observed sidewalk shed erected with no sign of any work going on upon search in dob now and bis systems both showed permit x00764617 has expired on 6-9-23 and has not been renewed .renew
Nov 15, 2023 · Penalty $1,250
Resolve - Class - 2
At time of my inspection of a recurring condition of a sidewalk shed at a 3 story occupied building. in violation since 8-26-2023 complaint 2374925 remains the same and hasn't been addressed. sidewalk shed perm
Sep 11, 2023
Resolve - Class - 2
At time of inspection i observed sidewalk shed erected with lights on upon search in dob now and bis systems both showed permit # x00764617 has expired on 6-9-23 and has not been renewed as required.properly re
Aug 26, 2023 · Penalty $1,250
Active - Class - 2
Note: observed a sidewalk shed at exp1, have electrical light fixture present not illuminated as per code bc3307.6.4.8, creating dark & tripping hazard for pedestrian. observed missing screw caps several area c
Jan 31, 2023 · Penalty $2,400
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35475895r issued on 3/10/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible cer
Nov 1, 2021 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection doesnt meet code spec.note:atoi observed hd sws@exp1&2 of bldg.pedestrian walking under sws.sws has active permitx00303690-sh.also observed missing screw caps several area of sws;missing s
Apr 12, 2021 · Penalty $2,400
Resolve - Class - 2
Failure to maintain building wall(s) or appirtences noted observed at exposure #1 at facade that are cracks at various locatiosn maintain exzterior building walls
Mar 10, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. at time of inspection noted numerous cracks thru the brick at exposure #1, near the fire escape. a sidewalk shed of around 30 feet in length recommended, m
Jan 8, 2020 · Penalty $2,500
Resolve
Complaints
- Paint/plaster
Ceiling
Feb 25, 2026 · Apt 1F
Close - Plumbing
Bathtub/shower
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Wall
Feb 25, 2026 · Apt 1F
Close - Door/window
Window frame
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 1F
Close - Door/window
Door
Feb 25, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 1F
Close - Door/window
Window frame
Feb 25, 2026 · Apt 1F
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Wall
Feb 25, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Feb 12, 2026 · Apt 2F
Close - Unsanitary condition
Mold
Feb 12, 2026 · Apt 2F
Close - Paint/plaster
Ceiling
Feb 12, 2026 · Apt 2F
Close - Electric
Outlet/switch
Feb 12, 2026 · Apt 2F
Close - Unsanitary condition
Sewage
Feb 9, 2026 · Apt 1F
Close - Water leak
Heavy flow
Feb 9, 2026 · Apt 1F
Close - Unsanitary condition
Mold
Jul 17, 2024 · Apt 2F
Close - Paint/plaster
Ceiling
Jul 17, 2024 · Apt 2F
Close - Water leak
Heavy flow
Jul 17, 2024 · Apt 2F
Close - Unsanitary condition
Mold
Jul 16, 2024 · Apt 2F
Close - Electric
Lighting
Jul 16, 2024 · Apt 2F
Close - Paint/plaster
Ceiling
Jul 16, 2024 · Apt 2F
Close - Paint/plaster
Ceiling
Jul 16, 2024 · Apt 2F
Close - Water leak
Heavy flow
Jul 16, 2024 · Apt 2F
Close - Paint/plaster
Ceiling
Feb 18, 2024 · Apt 2F
Close - Water leak
Heavy flow
Feb 18, 2024 · Apt 2F
Close - Paint/plaster
Ceiling
Feb 18, 2024 · Apt 2F
Close - Electric
Lighting
Dec 21, 2023 · Apt 2F
Close - Electric
Lighting
Dec 18, 2023 · Apt 2F
Close - Water leak
Slow leak
Dec 18, 2023 · Apt 2F
Close - Plumbing
Bathtub/shower
Oct 10, 2023 · Apt 2F
Close - General
Cabinet
May 19, 2023 · Apt 2F
Close - Heat/hot water
Entire building
Apr 7, 2023 · Apt BLDG
Close - Door/window
Door
Nov 23, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Aug 22, 2022 · Apt 2F
Close - Water leak
Slow leak
Aug 22, 2022 · Apt 2F
Close - Paint/plaster
Ceiling
Aug 22, 2022 · Apt 2F
Close - General
Cooking gas
Aug 22, 2022 · Apt 2F
Close - General
Cabinet
Aug 4, 2022 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Jul 21, 2022 · Apt BLDG
Close - Paint/plaster
Ceiling
May 20, 2022 · Apt 2F
Close - Paint/plaster
Ceiling
Apr 28, 2022 · Apt 3F
Close - Unsanitary condition
Pests
Apr 28, 2022 · Apt 3F
Close - Door/window
Door
Apr 28, 2022 · Apt 3F
Close - Paint/plaster
Wall
Apr 28, 2022 · Apt 3F
Close - Flooring/stairs
Floor
Apr 28, 2022 · Apt 3F
Close - Door/window
Door to dumbwaiter
Apr 28, 2022 · Apt 3F
Close - Water leak
Damp spot
Apr 28, 2022 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1925
- Floors
- 3
- Residential units
- 6
- Building area
- 4,485 ft²
- Lot area
- 2,358 ft²
- Zoning
- R3A
- Community board
- 210
- Council district
- 13
- Block / lot
- 5626 / 288
- Assessed value
- $335,700
- Landmark / historic district
- No
HPD registration #208803, last renewed Jul 30, 2025.
Questions about 183 City Island Avenue
Who owns 183 City Island Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 181-187 City Island LLC.
Does 183 City Island Avenue have violations?
Yes. NYC HPD has recorded 234 housing violations at this property.
Is 183 City Island Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 183 City Island Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 183 City Island Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.